MODIFICATION
47 -- TUBE ASSEMBLY, METAL
- Notice Date
- 12/30/2013
- Notice Type
- Modification/Amendment
- NAICS
- 336412
— Aircraft Engine and Engine Parts Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, PK/PZ Tinker AFB, 3001 Staff Drive, Ste 1AG76A, Tinker AFB, Oklahoma, 73145-3015, United States
- ZIP Code
- 73145-3015
- Solicitation Number
- FA8121-14-R-0009
- Point of Contact
- Gregory B. Benjamin, Phone: 7399438
- E-Mail Address
-
Gregory.Benjamin.3@us.af.mil
(Gregory.Benjamin.3@us.af.mil)
- Small Business Set-Aside
- N/A
- Description
- SYNOPSIS Solicitation 4 under the files section is the most current and accurate solicication. All proposals submitted must be in accordance with the attachment under solicitation 4. If there are any questions, please contact Gregory Benjamin at 405-739-4208, gregory.benjamin.3@us.af.mil. S Oklahoma City Air Logistics Center (OC-ALC) is contemplating to procure of the Line Items cited below for a FFP Competitive Contract with either United Technologies Corporation, E. A Patten or Aero Tube Technologies for the procurement of a total quantity of Line item 0001 quantity 10 each. Line 0002 quantity 1 each - first article test plan. Line item 0003 one lot first article test report. Line item 0004 one lot first article destructive unit. Line item 0005 one lot non-destructive each Tube Assembly, Metal to support the F100-220/220 Engine. 1. Estimated issue date and estimated closing/response date issued 22 November 2013 Closes 22 December 2013 2. PR# - FD2030-14-00230 3. Service/Spare/Repair/OH - Spare 4. Item: Tube Assembly, Metal 5. NSN - 4710-01-230-3040NZ 6. PN - 4066160-01 7. Description: Approximately 87.5590 inches long, 36.0 inches wide, 3.0 inches in height; and 2.6570 (LB) in weight. Supplies air to drive the Convergent Exhaust Nozzle Control. Item material consist of1069 OR 1072 NICKEL ALLOY 8. Total Line Item Quantity : L/I 0001 - Tube Assembly, Metal - New manufactured material - Quantity 8 each L/I 0002 - Tube Assembly, Metal - test plan first article. -Quantity 1each L/I 0003 - Tube Assembly, Metal - test report first article - Quantity 1 each L/I 0004 - Tube Assembly, Metal - destructive unit first article - Quantity 1 each L/I 0005 - Tube Assembly, Metal - Non-destructive unit first article - Quantity 2 each 9. Application (Engine or Aircraft) - F100-220/220E 10. Destination : FOB Origin: Ship to Code: SW3211; DEF Distribution Depot of Oklahoma; Central Receiving 3301 F Avenue Cen. Rec Building 506 Door 22; Tinker AFB, OK 73145-8000 11. Delivery : Line 0001 delivery starts on or before 30 Jan. 2014. Line item 0002 test plan delivery in 30 calendar days from the date on the contract. Line item 0003 test report delivery is in 120 calendar days to date of contract. Line item 0004 destructive unit delivery is in 120 calendar days from the date of contract. Line item 0005 non-destructive unit delivery is in 120 calendar days from the date of contract. 12. UID: Note to Contractor: If unit price exceeds $5,000 then UID requirements will apply. 13. Buyer name, phone#, and email address: Gregory Benjamin, 405-739-9438, Gregory.benjamin.3@us.af.mil Electronic procedures will be used for this solicitation. IAW FAR 5.207 (c) (15) (ii), all responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8121-14-R-0009/listing.html)
- Record
- SN03259417-W 20140101/131230235253-35a75066e476f227ae9076f3a6c13313 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |