Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 17, 2014 FBO #4437
AWARD

Z -- Sandy O&M Supplemental, Maintenance Dredging, 7-Foot Project, Impoundment Basin and Entrance Channel Cut-1. St. Lucie Inlet, Martin County, Florida

Notice Date
1/15/2014
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
GROUP410RJ007
 
Response Due
6/14/2013
 
Archive Date
2/14/2014
 
Point of Contact
Calvin Caldwell, 904 232 3055
 
E-Mail Address
USACE District, Jacksonville
(calvin.r.caldwell@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EP-13-D-0003-0002
 
Award Date
7/19/2013
 
Awardee
CASHMAN DREDGING AND MARINE CONTRACTING, CO., LLC (616466731) <br> 549 SOUTH ST <br> QUINCY, MA 02169-7318
 
Award Amount
$6,465,600.00
 
Line Number
0001-0005
 
Description
Project work consists of maintenance dredging the Federal navigation channel at St. Lucie Inlet and the adjoining impoundment basin to their authorized depths with disposal in the designated beach placement area approximately 4.5 miles south of the inlet between Monuments R-59 and R-75. The work will be divided into a Base and six Additive Bid Items which progressively add work to the Base. The Additive items pertain to dredging incremental volumes of material from the Impoundment Basin up to a maximum volume that corresponds to the total material available within the required plus allowable overdepth prism of the basin. The project will entail the dredging of the entrance channel Cut-1 to the required depth of 16 feet from Station 0+00 to Station 30+00, entrance channel Cut-1 transition from a required depth of 16 feet to a required depth of 10 feet from Station 30+00 to Station 34+00, and entrance channel Cut-1 to a required depth of 10 feet from Station 34+00 to Station 42+00; dredging of the transition area located between entrance channel Cut-1 and impoundment basin to a required depth of 8 feet from Station 30+00 to Station 42+00; and dredging the impoundment basin, Station 30+00 to Station 47+50, to a required depth of 16 feet. All areas will incorporate an additional 2 feet allowable overdepth beyond the required depths. Estimated quantities to be dredged are shown on the Line Items and Pricing Schedule, Section 00010-A. Work also includes beach tilling, turbidity monitoring, and manatee observers (if required).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/GROUP410RJ007/listing.html)
 
Record
SN03268509-W 20140117/140115234503-d3a0e9bc068f27e51ac3cedbc18bb739 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.