Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 25, 2014 FBO #4445
AWARD

Y -- DREDGED MATERIAL CONTAINMENT AREA 14B DIKE RAISING AND WEIR IMPROVEMENTS, SAVANNAH HARBOR, JASPER COUNTY, SOUTH CAROLINA.

Notice Date
1/23/2014
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Savannah, Attn: CESAS-CT, 100 West Oglethorpe Ave, Savannah, GA 31401
 
ZIP Code
31401
 
Solicitation Number
W912HN-13-R-0011
 
Response Due
4/11/2013 2:00:00 PM
 
Archive Date
2/22/2014
 
Point of Contact
Chad Arnett, 912 652 5105
 
E-Mail Address
USACE District, Savannah
(chad.a.arnett@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912HN-14-C-0004
 
Award Date
1/22/2014
 
Awardee
ASHRIDGE INC (965550031) <br> 120 WELCH ST <br> SAINT STEPHEN, SC 29479-3775
 
Award Amount
$4,678,990.00
 
Line Number
0001-0012
 
Description
This project includes the raising of the existing perimeter containment dike of the Dredge Material Containment Area (DMCA) 14B. The perimeter dike spans a length of 25,000 feet. The crest of the quote mark front dike, quote mark or the stretch of dike that parallels the Savannah River, is currently at an approximate elevation of 33 feet MLLW. The quote mark back dike, quote mark or stretch of dike that's opposite the front dike, is currently at elevation 25 feet MLLW. The cross dikes transition in elevation from 33 to 25 feet MLLW. This project will involve raising the current dike approximately 6 feet in height to an elevation range of 31 to 39 feet MLLW. The construction of the new dike will be on the interior slope of the existing dike. The design also includes a stability berm/counterweight on the inside toe of the new dike from Stations 52+00 to 157+00. Approximately 760,000 cubic yards (CY) of fill material will be required for the raising. This estimate includes the volume required to fill the template (560,000 CY) and accounts for any settlement or displacement that will occur during or prior to construction (200,000 CY). Fill material will be obtained from the interior of DMCA 14B. Additionally, a contract option will be included for the construction of an 8 acre oval-shaped bird island within the interior of the DMCA. Weir repairs are required for the four weirs that control drainage from the DMCA. All four weirs will be relocated a distance of approximately 70 feet to the interior of the DMCA. A second contract option will consist of adding a fifth new weir, adjacent to an existing weir which will tie into one of the existing outfall pipes.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA21/W912HN-13-R-0011/listing.html)
 
Record
SN03273355-W 20140125/140123234818-7a3446b3aa62bf4a1b8826c6e2a54378 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.