Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 02, 2014 FBO #4453
AWARD

Z -- Floating Dock Repair and Replacement at Engineer Depot, Hutchinson Island

Notice Date
1/31/2014
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Savannah, Attn: CESAS-CT, 100 West Oglethorpe Ave, Savannah, GA 31401
 
ZIP Code
31401
 
Solicitation Number
W912HN-14-T-0009
 
Archive Date
3/2/2014
 
Point of Contact
Julie M. Oliver, 912/652-5899
 
E-Mail Address
USACE District, Savannah
(julie.m.oliver@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912HN-14-P-0018
 
Award Date
1/31/2014
 
Awardee
Cambridge Marine Construction, Inc. (078808377) <br> 555 Charlie Smith Sr Hwy Ste 5 <br> Saint Marys, GA 31558-3032
 
Award Amount
$52,900.00
 
Line Number
0001-0004
 
Description
The scope of this project is to remove the existing pilings, seven (7) each, and replace with seven (7) new, marine pressure treated pilings that are 12-14 inches in diameter and forty-five feet in length, capped with a white heavy duty polyethylene cap. The existing pilings will need to be removed from site and properly disposed of. Each new piling is to be driven fifteen feet into the existing quote mark ground line quote mark of the river bottom slope. The project also includes the installation of two (2) new pile holders, one identical in size to the existing pile holders, and firmly affixed to the side of the floating dock identical to the manner all other typical pile holders are affixed to the floating dock. The second pile holder, located at the east end of the dock, is affixed differently than the typical pile holders. This pile holder has broken off and will need to be replaced. It is the contractor's responsibility to come up with the best solution for the fix. A contractor site visit can be coordinated through USACE to evaluate the existing dock. In addition, this project includes the replacement of one (1) new board, marine pressure treated 10 quote mark x 12 quote mark x 3 quote mark pine board at the east end of the floating dock. This also includes mobilization and demobilization of all the necessary equipment to complete the project. This equipment should include everything necessary to remove and install timber pilings in a marine environment. For example, a crane barge, crane, and pile hammer. Water jetting is not permitted as a pile installation method.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA21/Awards/W912HN-14-P-0018.html)
 
Record
SN03278504-W 20140202/140131234018-3b84ed7bee4589a14ac81c1db91fe187 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.