Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 09, 2014 FBO #4460
MODIFICATION

M -- Responses to Questions regarding Solicitation for a Concession Contract for Lodging, Food & Beverage, Retail, Campground, Tour, Kennel, Fuel, and Other Visitor Services within Mesa Verde National Park

Notice Date
2/7/2014
 
Notice Type
Modification/Amendment
 
NAICS
713990 — All Other Amusement and Recreation Industries
 
Contracting Office
Department of the Interior, National Park Service, NPS - All Offices, 12795 West Alameda Parkway, Post Office Box 25287, Denver, Colorado, 80225-0287
 
ZIP Code
80225-0287
 
Solicitation Number
CC-MEVE001-15
 
Archive Date
4/2/2015
 
Point of Contact
Jennifer Parker, Phone: (303) 969-2661
 
E-Mail Address
jennifer_parker@nps.gov
(jennifer_parker@nps.gov)
 
Small Business Set-Aside
N/A
 
Description
Responses to Questions MEVE001 Below please find the National Park Service's (NPS's) responses to the questions submitted by the January 10, 2014, deadline, in regard to the Prospectus for a Concession Business Opportunity to provide lodging, retail, food and beverage, and other services (CC-MEVE001-15) at Mesa Verde National Park. Please note all potential Offerors should read the questions and responses, as there is information that may be of assistance in preparing a proposal to the solicitation. General Questions - please note the information below is available at http://concessions.nps.gov/meve001-15.htm 1. Can you please state the type of Heat/Fuel used at each building? FMSS Asset Code FMSS Description Heating system types 46073 (HQ) Spruce Tree Terrace Concession (307) (HQ) Spruce Tree Terrace Concession - Food Srvc Addition HVAC is provided by a roof mounted package unit that uses LP gas to provide heat, two evaporative coolers, and electric baseboard heaters in the office and seating area. The heating and cooling control systems are electric. There are two roof mounted exhaust fans and a roof mounted utility fan. Water is heated by a tankless LP gas water heater. 51236 (MF) Morefield Cmpgrnd Concession Lndry & Shwr 801 The heating system is provided by electric wall heaters and suspended unit heaters. There is no cooling system in the building. Hot water generation in this building is by a gas powered water heater. 51243 (MF) Morefield Concession Service Station 802 The heating system is provided by electric wall heaters and suspended unit heaters. There is no cooling system in the building. Hot water generation is provided by the laundry building 51246 (MF) Morefield Concession Retail Store 800 A portion of the heating system is provided by electric wall heaters and suspended unit heaters. The remainder of the heating is provided by a gas powered package unit that also provides the building's cooling system. Hot water is generated by an electric water heater. 51252 (FV) Far View Terrace Concession 601 The heating system is provided by forced air furnaces that are powered by electricity or LP - gas and electric unit heaters. The building is cooled with window units and evaporative coolers. The heating and cooling control systems are electric. Hot water is generated by an electric water heater 51254 (FV) Far View Concession Women's Dormitory Heat is provided by electric baseboard and unit heaters throughout the facility. The building has no cooling system except for a window unit in the lounge. Hot water is generated by an LP gas water heater. 51294 (MF) Zuni Loop Comfort Station 107 Heating is provided by an electric wall mounted unit heater in the pipe space and two suspended mount electric heaters in the men's and women's restroom. There is no cooling system in the building. There is no hot water generation in this building 51296 (MF) Jemez Loop Comfort Station 108 There is no cooling or heating system in the building. There is no hot water generation in this building. 51298 (MF) Pueblo Road Comfort Station 109 Heating is provided by an electric wall mounted unit heater in the pipe space and two suspended mount electric heaters in the men's and women's restroom. There is no cooling system in the building. There is no hot water generation in this building 51299 (MF) Jemez Loop Comfort Station 110 There is no cooling or heating system in the building. There is no hot water generation in this building. 51302 (MF) Taos Loop Comfort Station 111 There is no cooling or heating system in the building with the exception of an electric wall mounted unit heater that heats only the pipe space. There is no hot water generation in this building 51303 (MF) Ute Loop Comfort Station 112 Heating is provided by an electric wall mounted unit heater in the pipe space and two suspended mount electric heaters in the men's and women's restroom. There is no cooling system in the building. There is no hot water generation in this building. 51305 (MF) Apache Loop Comfort Station 113 There is no cooling or heating system in the building. There is no hot water generation in this building. 51306 (MF) Orabi Loop Comfort Station 115 There is no cooling or heating system in the building. There is no hot water generation in this building. 51307 (MF) Ute Loop Comfort Station 116 There is no cooling or heating system in the building. There is no hot water generation in this building. 51310 (MF) Walpi Loop Comfort Station 118 There is no cooling or heating system in the building. There is no hot water generation in this building. 51312 (MF) Walpi Comfort Station 119 There is no cooling or heating system in the building. There is no hot water generation in this building. 51315 (MF) Walpi Loop Comfort Station 120 There is no cooling or heating system in the building. There is no hot water generation in this building. 51317 (MF) Ute Loop Comfort Station 121 An electric suspended mount unit heater is installed in both the men's and women's restrooms. There is no cooling system in the building. There is no hot water generation in this building. 51319 (MF) Group Camp Comfort Station 123 There is no cooling or heating system in the building. There is no hot water generation in this building. 51322 (MF) Group Camp Comfort Station 124 There is no cooling or heating system in the building. There is no hot water generation in this building. 51404 (MF) Hano Loop Comfort Station 114 There is no cooling or heating system in the building. There is no hot water generation in this building. 84302 (FV) Far View Concession Motel unit 701 (237-240) For the 68 rooms included in the CFIP, the heating system is provided by electric wall unit heaters in each guest room. There is not a cooling system in these units. The remaining upgraded rooms have package units that provide heating and cooling. The heating and cooling control system is electric. There is one electric hot water heater for each two rooms throughout the units. 84315 (FV) Far View Concession Motel Unit 702 (231-236) 84316 (FV) Far View Concession Motel Unit 703 (227-230) 84317 (FV) Far view Concession Motel Unit 704 (215-226) 84318 (FV) Far View Concession Motel Unit 705 (211-214) 84320 (FV) Far View Concession Motel Unit 706 (205-210) 84322 (FV) Far View Concession Motel Unit 707 (201-204) 84324 (FV) Far View Concession Motel Unit 708 (241-250) 84327 (FV) Far View Concession Motel Unit 709 (251-256) 84328 (FV) Far View Concession Motel Unit 710 (257-260) 84330 (FV) Far View Concession Motel Unit 711 (261-274) 84332 (FV) Far View Concession Motel Unit 712 (275-278) 84335 (FV) Far View Concession Motel Unit 714 (165-175) 84337 (FV) Far View Concession Motel Unit 723 (153-164) 84343 (FV) Far View Concession Motel Unit 724 (141-152) 84348 (FV) Far View Concession Motel Unit 725 (121-140) 84350 (FV) Far view Concession Motel Unit 726 (101-120) FMSS Asset Code FMSS Description Heating system types 84357 (FVL) Far View Concession Lodge 700 (restaurant) The heating systems in the building are provided by electric, hot water and forced air provided by furnace using electricity and LP - gas. The terminal units for these systems consist of radiant/infrared and unit heaters. The cooling systems in the building are provided by DX and forced air, sourced by split systems and evaporative coolers. The heating and cooling control systems are electric. Hot water is generated by electric water heater and gas boiler. 2. Can you please give details about the tanks for the gas station (e.g. size, age, quantity, condition, type of fuel, etc.)? Information provided by the existing concessioners annual compliance report states: There are (2) - 6,000 gallon tanks at Morefield service station. One is unleaded and one is diesel. They were installed in 1999. They are single wall, steel tanks with galvanic anodes. They have fiberglass reinforced plastic piping. 3. Can you please supply the information on building roof systems (e.g. type, condition, year of last replacement, etc.)? FMSS Asset Code FMSS Description Roof Replacement 46073 (HQ) Spruce Tree Terrace Concession (307) (HQ) Spruce Tree Terrace Concession - Food Srvc Addition 60-mil membrane roof installed 2008 51236 (MF) Morefield Cmpgrnd Concession Lndry & Shwr 801 60-mil membrane roof installed 2009 51243 (MF) Morefield Concession Service Station 802 Unknown 51246 (MF) Morefield Concession Retail Store 800 60-mil membrane roof installed 2009 51252 (FV) Far View Terrace Concession 601 60-mil membrane roof installed on west roof 2010 51254 (FV) Far View Concession Women's Dormitory Propane roof installed 2013 51294 (MF) Zuni Loop Comfort Station 107 60-mil membrane replaced on all comfort station roofs 2006 51296 (MF) Jemez Loop Comfort Station 108 51298 (MF) Pueblo Road Comfort Station 109 51299 (MF) Jemez Loop Comfort Station 110 51302 (MF) Taos Loop Comfort Station 111 51303 (MF) Ute Loop Comfort Station 112 51305 (MF) Apache Loop Comfort Station 113 51306 (MF) Orabi Loop Comfort Station 115 51307 (MF) Ute Loop Comfort Station 116 51310 (MF) Walpi Loop Comfort Station 118 51312 (MF) Walpi Comfort Station 119 51315 (MF) Walpi Loop Comfort Station 120 51317 (MF) Ute Loop Comfort Station 121 FMSS Asset Code FMSS Description Roof Replacement 51319 (MF) Group Camp Comfort Station 123 60-mil membrane replaced on all comfort station roofs 2006 51322 (MF) Group Camp Comfort Station 124 51404 (MF) Hano Loop Comfort Station 114 84357 (FVL) Far View Concession Lodge 700 (restaurant) 60-mil membrane roof installed 2008 84302 (FV) Far View Concession Motel unit 701 (237-240) Unknown 84315 (FV) Far View Concession Motel Unit 702 (231-236) Unknown 84316 (FV) Far View Concession Motel Unit 703 (227-230) Unknown 84317 (FV) Far view Concession Motel Unit 704 (215-226) 60-mil membrane roof installed 2005 84318 (FV) Far View Concession Motel Unit 705 (211-214) Unknown 84320 (FV) Far View Concession Motel Unit 706 (205-210) Unknown 84322 (FV) Far View Concession Motel Unit 707 (201-204) Unknown 84324 (FV) Far View Concession Motel Unit 708 (241-250) Unknown 84327 (FV) Far View Concession Motel Unit 709 (251-256) Unknown 84328 (FV) Far View Concession Motel Unit 710 (257-260) Unknown 84330 (FV) Far View Concession Motel Unit 711 (261-274) Unknown 84332 (FV) Far View Concession Motel Unit 712 (275-278) Unknown 84335 (FV) Far View Concession Motel Unit 714 (165-175) 60-mil membrane roof installed 2005 84337 (FV) Far View Concession Motel Unit 723 (153-164) Unknown 84343 (FV) Far View Concession Motel Unit 724 (141-152) 60-mil membrane roof installed 2005 84348 (FV) Far View Concession Motel Unit 725 (121-140) Unknown 84350 (FV) Far view Concession Motel Unit 726 (101-120) Unknown
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/CC-MEVE001-15/listing.html)
 
Place of Performance
Address: Mesa Verde National Park, Mesa Verde, Colorado, 81330, United States
Zip Code: 81330
 
Record
SN03284189-W 20140209/140207235955-069225708d6f9e7b879f206838639183 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.