SOLICITATION NOTICE
R -- Professional, administrative, and management support services.
- Notice Date
- 3/11/2014
- Notice Type
- Presolicitation
- NAICS
- 561210
— Facilities Support Services
- Contracting Office
- ACC - Rock Island (ACC-RI), ATTN: AMSAS-AC, Rock Island, IL 61299-6500
- ZIP Code
- 61299-6500
- Solicitation Number
- W52P1J-14-R-0060
- Response Due
- 4/25/2014
- Archive Date
- 5/25/2014
- Point of Contact
- Lana, 309-782-0502
- E-Mail Address
-
ACC - Rock Island (ACC-RI)
(lana.graw@us.army.mil)
- Small Business Set-Aside
- N/A
- Description
- The Army Contracting Command - Rock Island (ACC-RI) intends to issue a Request for Proposal (RFP) in Step 2 and Step 3 of the Three-Step Procurement for the Enhanced Army Global Logistics Enterprise (EAGLE) Requirements included in this announcement. The estimated release date of the Step 2 BOA RFP W52P1J-14-R-0060 is 26 March 2014. This RFP will result in the execution of Basic Ordering Agreements (BOAs) with offerors determined to be technically acceptable in accordance with the requirements of the solicitation. All responsible sources may submit a proposal, which shall be considered by the agency. All contractors who already possess a BOA to support EAGLE requirements are not required to submit a new proposal against this BOA RFP. Proposals submitted against task orders will be evaluated on Lowest Price, Lowest Price Technically Acceptable (LPTA), or other Best Value techniques. A determination of responsibility will be performed prior to Task Order award. The following EAGLE requirements have been identified for an anticipated release of a Step 3 RFP for a future task order. A RFP for these requirements will not be issued until completion of the Step 2 BOA executions under W52P1J-14-R-0060. Ft. McCoy, WI - The contractor will provide logistical support, including but not limited to the following functional areas: Field and sustainment level maintenance on tactical and non-tactical equipment which could include: routine tactical maintenance back-up. Transportation requirements could include providing Transportation Motor Pool (TMP), Personal Property Shipping Office (PPSO); rail operations, deployment/redeployment operations; and freight service operations. Supply requirements could include Asset Management (Installation Property Book and Equipment Management; Supply Support Activity (SSA) Management (Classes of Supply include I, II, IIIP, IV, VII and IX), Central Issue Facility (CIF) Operations, bulk fuel operations, and Ammunition Supply Operations and and Ammunition Supply Point (ASP) Management. It is anticipated that this requirement will be issued as a small business set-aside. Estimated release date of the Request for Proposal (RFP) is Jun 14. The estimated task order award is 1st Quarter FY 15. Ft. Carson, CO - The contractor will provide logistical support, including but not limited to the following functional areas: Field and sustainment level maintenance on tactical and non-tactical equipment which could include: Life Cycle Management Command (LCMC) Maintenance Program, routine tactical maintenance back-up, and unit augmentation and back up maintenance programs. Transportation requirements could include providing Transportation Motor Pool (TMP), rail operations, deployment/redeployment operations; and freight service operations. Supply requirements could include Asset Management (Installation Property Book and Equipment Management; Supply Support Activity (SSA) Management (Classes of Supply include I, II, IIIP, IV, VII and IX), SSA packaging and crating operations, Central Issue Facility (CIF) Operations, bulk fuel operations, HAZMAT / HAZMART operations, and Ammunition Supply Operations and Ammunition Supply Operations and Ammunition Supply Point (ASP) Management. It is anticipated this requirement will be issued as an 8(a) set-aside. Estimated release date of the Request for Proposal (RFP) is Jun 14. The estimated task order award is 2nd Quarter FY 15. White Sands Missile Range, NM - The contractor will provide logistical support including, but not limited to the following functional areas: Field and sustainment level maintenance on tactical and non-tactical equipment which could include: Life Cycle Management Command (LCMC) Maintenance Program, routine tactical maintenance back-up, and unit augmentation and back up maintenance programs. Transportation requirements could include providing Transportation Motor Pool (TMP), Personal Property Shipping Office (PPSO); rail operations, deployment/redeployment operations; and freight service operations. Supply requirements could include Asset Management (Installation Property Book and Equipment Management; Supply Support Activity (SSA) Management (Classes of Supply include I, II, IIIP, IV, VII and IX), SSA packaging and crating operations, Central Issue Facility (CIF) Operations, bulk fuel operations, HAZMAT / HAZMART operations, and Ammunition Supply Operations and Ammunition Supply Operations and Ammunition Supply Point (ASP) Management. It is anticipated that this requirement will be issued as a Small Business Set-Aside. Estimated release date of the Request for Proposal (RFP) is Oct 14. The estimated task order award is 3rd Quarter FY 15. Ft. Riley, KS - The contractor will provide logistical support including, but not limited to the following functional areas: Field and sustainment level maintenance on tactical and non-tactical equipment which could include: Life Cycle Management Command (LCMC) Maintenance Program, routine tactical maintenance back-up, and unit augmentation and back up maintenance programs. Transportation requirements could include providing Transportation Motor Pool (TMP), Personal Property Shipping Office (PPSO); rail operations, deployment/redeployment operations; and freight service operations. Supply requirements could include Asset Management (Installation Property Book and Equipment Management; Supply Support Activity (SSA) Management (Classes of Supply include I, II, IIIP, IV, VII and IX), SSA packaging and crating operations, Central Issue Facility (CIF) Operations, bulk fuel operations, HAZMAT / HAZMART operations, and Ammunition Supply Operations and Ammunition Supply Operations and Ammunition Supply Point (ASP) Management. It is anticipated that this requirement will be issued as a Small Business set-aside. Estimated release date of the Request for Proposal (RFP) is Oct 14. The estimated EAGLE task order award is 2nd Quarter FY 15. Ft. Stewart, GA - The contractor will provide logistical support including, but not limited to the following functional areas: Field and sustainment level maintenance on tactical and non-tactical equipment which could include: Life Cycle Management Command (LCMC) Maintenance Program, Pre-Deployment Training Equipment (PDTE), routine tactical maintenance back-up, and unit augmentation and back up maintenance programs. Transportation requirements could include providing Transportation Motor Pool (TMP), Personal Property Shipping Office (PPSO); rail operations, (to include maintenance of Locomotive Engines), deployment/redeployment operations; container inspection, repair, movement, shipping, and freight service operations; limited augmentation supporting installation property book services. Supply requirements could include: Supply Support Activity (SSA) Management/stock readiness (Classes of Supply include I, II, IIIP, IV, VII and IX), Central Issue Facility (CIF) Operations. Ammunition Supply Point (ASP) operations and management. It is anticipated that this requirement will be issued as a small business set-aside. Estimated release date of the Request for Proposal (RFP) is Nov 14. The estimated EAGLE task order award is 3rd Quarter FY 15. Ft. Drum, NY - The contractor will provide logistical support including, but not limited to the following functional areas: Field and sustainment level maintenance on tactical and non-tactical equipment which could include: Life Cycle Management Command (LCMC) Maintenance Program, routine tactical maintenance back-up, limited-potential sustainment level maintenance on tactical and non-tactical equipment which exceeds Logistics Readiness Center (LRC) capability and capacity, augmentation for ARFORGEN requirements, and unit augmentation and back up maintenance programs. Transportation requirements could include providing Personal Property Shipping Office (PPSO). It is anticipated that this requirement will be issued as a small business set-aside. Estimated release date of the Request for Proposal (RFP) is Nov 14. The estimated EAGLE task order award is 3rd Quarter FY 15. Ft. Rucker, AL- The contractor will provide logistical support including, but not limited to the following functional areas: Field and sustainment level maintenance on tactical and non-tactical equipment which could include: routine tactical maintenance back-up, and unit augmentation and back up maintenance programs. Transportation requirements could include providing Transportation Motor Pool (TMP), Personal Property Shipping Office (PPSO); deployment/redeployment operations; and passport management, HAZMAT management, freight service operation. Supply requirements could include Asset Management (Installation Property Book and Equipment Management; Supply Support Activity (SSA) Management (Classes of Supply include I, II, IIIP, IV, VII and IX), Central Issue Facility (CIF) Operations, bulk fuel operations, and Ammunition Supply Operations and Ammunition Supply Operations and Ammunition Supply Point (ASP) Management. It is anticipated that this requirement will be issued as a small business set-aside. Estimated release date of the Request for Proposal (RFP) is Dec 14. The estimated EAGLE task order award is 1st Quarter FY 15. Dugway Proving Grounds, UT - The contractor will provide logistical support including, but not limited to the following functional areas: Field and sustainment level maintenance on tactical and non-tactical equipment which could include: Life Cycle Management Command (LCMC) Maintenance Program, routine tactical maintenance back-up, and unit augmentation and back up maintenance programs. Transportation requirements could include providing Transportation Motor Pool (TMP), Personal Property Shipping Office (PPSO); rail operations, deployment/redeployment operations; and freight service operations. Supply requirements could include Asset Management (Installation Property Book and Equipment Management; Supply Support Activity (SSA) Management (Classes of Supply include I, II, IIIP, IV, VII and IX), Central Issue Facility (CIF) Operations, bulk fuel operations, and Ammunition Supply Operations and Ammunition Supply Operations and Ammunition Supply Point (ASP) Management. It is anticipated this requirement will issue as an 8(a) set-aside. Estimated release date of the Request for Proposal (RFP) is Nov 14. The estimated EAGLE task order award is 3rd Quarter FY 15. Ft. Detrick, MD - Transportation functions could include providing Transportation Motor Pool (TMP); Limited-potential sustainment level maintenance on tactical and non-tactical equipment which exceeds Logistics Readiness Center (LRC) capability and capacity. It is anticipated this requirement will be issued as an 8(a) set-aside. Estimated release date of the Request for Proposal (RFP) is Nov 14. The estimated EAGLE task order award is 3rd Quarter FY 15. Army Field Support Battalion-Qatar (AFSBn-QA) (APS 5 and Operation Project (OPROJ) Stocks): The contractor will provide logistical support including, but not limited to the following functional areas: Maintenance on tactical and non-tactical equipment in support of Operation Enduring Freedom (OEF) and Operation Spartan Shield (OSS), transportation functions, supply operations, property accountability, Ammunition Supply Operations and ASP Management. APS authorizations in Qatar include the Fires and Sustainment Brigades (BDE) and13 OPROJ Stocks. This contract also supports the Area Support Group-Qatar(ASG-QA), U.S. Army Medical Materiel Agency (USAMMA), US Army Medical Materiel Center-Southwest Asia (USAMMAC-SWA), Air Defense Artillery (ADA), Joint Tactical Ground Stations (JTAGS), and 12 Missile Defense Detachment(MDD). Operations are conducted at Camp As-Sayliyah, Al Udeid Air Base (AB), Falcon 78, and Masaeeid Port in Qatar. It is anticipated this requirement will be issued on an unrestricted basis. Estimated release date of the Request for Proposal (RFP) is Jan 15. The estimated EAGLE task order award is 4th Quarter FY 15.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/01bbb7d700afc9f0863c18f24cbef900)
- Place of Performance
- Address: ACC - Rock Island (ACC-RI) ATTN: CCRC-FB Rock Island IL
- Zip Code: 61299-6500
- Zip Code: 61299-6500
- Record
- SN03307392-W 20140313/140311234740-01bbb7d700afc9f0863c18f24cbef900 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |