Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 24, 2014 FBO #4534
MODIFICATION

Y -- Shingle Creek Crossing - Solicitation 1 - Attachment 1 - Construction Drawings - Attachment 2 - Supplemental Project Specifications

Notice Date
4/22/2014
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 Utah Acquisition Support Center, 2222 West 2300 South, Salt Lake City, Utah, 84119, United States
 
ZIP Code
84119
 
Solicitation Number
AG-84N8-S-14-0046
 
Response Due
5/28/2014 1:00:00 PM
 
Point of Contact
Tamera Draper, Phone: 801.975.3370, Garon Sandall, Phone: 435-896-1065
 
E-Mail Address
tdraper01@fs.fed.us, gsandall@fs.fed.us
(tdraper01@fs.fed.us, gsandall@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Supplemental Project Specifications Construction Project Drawings Solicitation Package April 22, 2014 - Posting of Solicitation Package The entire solicitation package for this project is posted as of today. Package includes: -Solicitation Document (48 pages), -Attachment 1 - Construction Drawings (10 pages) and, -Attachment 2 - Supplemental Project Specifications (48 pages) Offerors are reminded to review page 1 of the solicitation package, as well as Section L.7 for a listing of all documents that are required to be returned with any offer submitted. Offerors are also encouraged to fully address all technical items as listed in Section M.1. Quotes are due by May 28, 2014 at 1:00 p.m. local time. Faxed or e-mail quotes will not be accepted. An organized site visit has been scheduled for Monday, May 12, 2014 at 10:30 a.m. Local Time (Mountain Time). Interested participants should plan to meet at the project site for the site visit.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/84N8/AG-84N8-S-14-0046/listing.html)
 
Place of Performance
Address: The project is located on the Fishlake National Forest, Beaver Ranger District., The project road may be accessed by exiting off I-70 at Exit # 7, 7 miles East of the I-70, I-15 interchange in the Clear Creek Canyon. From there head east on County Road #2524, Clear Creek Canyon Road, approximately 1.75 miles to the Shingle Creek Road turn off. The project is located approximately 1 mile south from the turn off along this road., Beaver, Utah, 84713, United States
Zip Code: 84713
 
Record
SN03344915-W 20140424/140422234628-4cfba6c89fdad32dc09c34302dbb80ba (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.