SOLICITATION NOTICE
F -- O'Hara Creek Culvert Upgrades
- Notice Date
- 4/24/2014
- Notice Type
- Presolicitation
- NAICS
- 115310
— Support Activities for Forestry
- Contracting Office
- Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
- ZIP Code
- 83815-8363
- Solicitation Number
- AG-02RC-S-14-0037
- Point of Contact
- Darren M. Zychek, Phone: 2084768224
- E-Mail Address
-
dzychek@fs.fed.us
(dzychek@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- This project is in colaboration with the Nez Perce Tribe Watershed program. The goal of the partnership is to use restoration techniques to improve watershed function. This project is a Collaborative Forest Landscape Restoration Project (CFLRP). The goal of the CFLRP project is to utilize collaborative, science based ecosystem restoration techniques to improve watershed function while encouraging ecological, economic and social sustainability with an emphasis on providing local employment opportunities. This contract requires road reconstruction and related road maintenance work in compliance with its terms, specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals. Description of Work. This project consists of four site locations along FS Road 651. 1. Site 1 (MP 0.62, Road 651) is removing an existing 24" cmp and replacing with a new 66" x 51" x 48' pipe arch. Geogrid stabilization for full width and depth of excavation will be required on outlet fill slope. Excavation is estimated at 310 CY of material. Work also includes, stream restoration and weir placement, placing riprap on channel slopes, rebuilding the road prism, replacement of surfacing along with all other work necessary to complete the project as required by the contract, plans, and specifications. 2. Site 2 (MP 1.71, Road 651) is removing an existing 30" cmp and replacing with a new 73" x 55" x 50' pipe arch. Geogrid stabilization for full width and depth of excavation will be required on outlet fill slope. Excavation is estimated at 310 CY of material. Work also includes, stream restoration and weir placement, placing riprap on channel slopes, rebuilding the road prism, replacement of surfacing along with all other work necessary to complete the project as required by the contract, plans, and specifications. 3. Site 3 (MP 2.12, Road 651) is removing an existing 30" cmp and replacing with a new 73" x 55" x 50' pipe arch. Geogrid stabilization for full width and depth of excavation will be required on outlet fill slope. Excavation is estimated at 350 CY of material. Work also includes, stream restoration and weir placement, placing riprap on channel slopes, rebuilding the road prism, installation of a 18"culvert for road drainage, replacement of surfacing along with all other work necessary to complete the project as required by the contract, plans, and specifications. 4. Site 4 (MP 2.60, Road 651) is removing an existing 30" cmp and replacing with a new 48" x 104' pipe. The new 48" pipe will be located approximately 30' from existing 30" cmp and approximately 15' deeper. Work includes removal of existing pipe, removal of approximately 600 CY of sediment material at inlet of pipe to bring stream back to natural grade. Sediment material shall be hauled to waste site at O'Hara pit. Due to the depth of fill slopes, geogrid stabilization for full width and depth of excavation will be required on outlet fill slope. Excavation is estimated at 3200 CY of material. Work also includes, approximately 70' stream restoration from the inlet upstream and rock weir placement, placing riprap on channel slopes, rebuilding the road prism, installation of a 18"culvert for road drainage, replacement of surfacing along with all other work necessary to complete the project as required by the contract, plans, and specifications.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-14-0037/listing.html)
- Place of Performance
- Address: From Kooskia, Idaho, travel 23 miles East on Highway 12 to Lowell, ID and the junction of FS Road 223. Turn right on Road 223 and travel approximately 7 miles to junction of FS Road 651. Turn right and travel 0.62 miles to beginning of project., Kooskia, Idaho, United States
- Record
- SN03348121-W 20140426/140424235259-40116721e79b50386b4b1084dca5b8ba (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |