Y -- CA FLAP 3050(2), Arroyo Seco Road

Notice Date
4/30/2014
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
CA-FLAP-3050(2)
 
Archive Date
5/22/2014
 
Point of Contact
Craig Holsopple, Phone: 720-963-3350
 
E-Mail Address
craig.holsopple@dot.gov
(craig.holsopple@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by telefax to 720-963-3360 (Attn: Craig Holsopple) for receipt by close of business (2 p.m. local Denver time) on May 7, 2014: (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility - DO NOT SEND COPIES OF YOUR CCR PROFILE; (3) Letter from bonding agent stating your firm's capability to bond for a single project of $4 million, and your firm's aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value in which you performed ( as the prime contractor ) slope stabilization, subexcavation, pulverization, aggregate base, asphalt pavement, drainage improvements, signing, and pavement markings. State whether your firm was the prime contract or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS: CA FLAP 3050(2), Arroyo Seco Road The Arroyo Seco Road project is located in the County of Monterey on California Forest Highway (FH) 129, otherwise known as Arroyo Seco Road, near Greenfield, CA in the Los Padres National Forest. The proposed project is for restoration, resurfacing, and rehabilitation of 4.7 miles of roadway between the Arroyo Seco Campground and the intersection with County Road G16 (Carmel Valley Road). Heavy seasonal traffic controls commencement and termination of construction operations. There will be uninterrupted traffic until after Labor Day up through the following Memorial Day weekend. Temperature dependent work items such as asphalt paving and pavement marking must be completed in dry conditions, for which the duration is also limited. Work will be continuous for entire length of the project, with no suspensions. The major work elements include pulverizing the existing road to a depth of 4" and a 3" asphalt surfacing. The primary scopes of work are slope stabilization, subexcavation, pulverization, aggregate base, asphalt pavement, drainage improvements, signing, and pavement markings. Significant quantities include: Line Item Unit Est. Quantity Subexcavation CUYD 2,600 Pulverizing, 4-inch depth STA 253 Roadway Aggregate TON 2,200 Hot Asphalt Conc. Pavem't TON 11,700 Prime Coat SQYD 71,000 Standard Underdrain LNFT 920 Concrete Curb, 18" Depth LNFT 4730 It is anticipated that this project will be advertised in June, 2014 with construction occurring from late July, 2014 through January, 2015. The contracting range for this project is between $3 million and $4 million..
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/CA-FLAP-3050(2)/listing.html)
 
Place of Performance
Address: Los Padres National Forest, California, 93927, United States
Zip Code: 93927
 
Record
SN03352915-W 20140502/140430235222-c6508b8993bc6120f93ba08f4cc2e2d3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.