Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 21, 2014 FBO #4561
MODIFICATION

F -- F - ESA Phase I & II for Old Breadsprings

Notice Date
5/19/2014
 
Notice Type
Modification/Amendment
 
NAICS
541620 — Environmental Consulting Services
 
Contracting Office
BIA NAVAJO 00009301 WEST HILL ROOM 346Contracting OfficeGallupNM87301US
 
ZIP Code
00000
 
Solicitation Number
A14PS00486
 
Response Due
5/21/2014
 
Archive Date
6/20/2014
 
Point of Contact
MARY JANE JOHNSON
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment no.: 0005 is for Solicitation no.: A14PS00486 is as follows: 1. To change this paragraph to read as: Task II-1. The ASTM report shall be reviewed and stamped by a Environmental Professional certifying that the report was conducted and prepared in accordance with the required standards identified in this contract. 2.To Clarify the Square footage below: Old Bread Springs School InventoryBldg NumberSQ.FT Multi-purpose Building = Bldg No. 376 9,352 Sq ft Multi-purpose Building (378) = Bldg No. 3781,048 Sq ft Appartment = Bldg No. 380 2,522 Sq ft Appartment = Bldg No. 381 2,131 Sq ft Pump house = Bldg No. 382 112 Sq ft Facility Maintenance Shop = Bldg No. 390 384 Sq ft School, elementary = Bldg No. 392 1,348 Sq ft School, elementary = Bldg No. 393 1,012 Sq ft School, elementary = Bldg No. 395 896 Sq ft 18,805 Sq ft Tank1 Tank2 Tank3 Tank4 Propane Tank Transfer to Tohaali1 Water Tank, Elevated1 Lagoon, 2 cell 1 3.REVISED PRICE SCHEDULE: ASTM E1903-11 PHASE II STUDY Price - Old Bread Springs School TASK IPREWORK SUBMTTALS 1Site Specific HASP $ 2Work Plan$ 3Work Schedule$ TASK IIINVESTIGATION/SAMPLING/ANALYSES AInves.(64 hours@ $__/hr)$ 1Asbestos (50 @ $__ea)$ 2Lead/LBP (200 @ $__0 ea)$ 3PCBs (50 @ $__ea)$ 4Mercury (10 @ $__ea)$ 5Chemicals (10 @ $__ea)$ 6AST (3 @ $__ each)$ 7Univ Wste (50 @ $__ ea)$ 8Lagoon (10 @ $__ ea)$ 9Water Twr (5 @ $__ ea)$ TASK III Engineer Cost Estimate 1Cost Estimate$ 2PE Certification$ 3Discussions$ TASK IV Report 1Report Preparation$ 2Draft Report$ 3Duplication of Report$ TOTAL $ Phase II PRICE Schedule Attachment C Group I and II Tasks Group Task I Pre-Work Submittals: 1. Develop a Health and Safety Plan in accordance with 29 CFR 1910.120 for worker protection $ 2. Work Plan/Schedule $ Subtotal $ Group Task II: Site visits, communication, photographic record; Research of Data Bases and records Conduct Interviews with local and knowledgeable individuals, etc, 1. Mileage(Gallup to Bread Springs 30/RTX$____mile X 3Trips) $ 2. Lodging/Per diem ($_____/night X3nightsX3) $ 3. Vehicle Rental $/week $ 4. Personnel Costs: Project Manager ($__/hrX32) $ Engineering Tech ($__/hr. X32) $ Administrative/Clerical ($__/hrX16) $ Professional Engineer Certification $ 5. Verify onsite Plot Plan locating all existing structures including plotting of all UGUs and ASTs $ 6. Prepare report in ASTM E1527-005 Outline format $ Subtotal $ Taxes: 7. NMGRT- 7.938% $ 8. Navajo Nation GRT- 4.0% $ Subtotal $ Total $ 4. All other terms and conditions to remain the same.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BIA/RestonVA/A14PS00486/listing.html)
 
Record
SN03369604-W 20140521/140519234218-f246fb3a03e64739ecdc58f7e9761ba1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.