SOLICITATION NOTICE
Y -- NM FLAP 15-2(1), Gila River Highway
- Notice Date
- 6/10/2014
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH68-14-B-00009
- Archive Date
- 9/1/2014
- Point of Contact
- Joe Wilson, Phone: 7209633090, Aaron Sanford, Phone: 7209633090
- E-Mail Address
-
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECS ARE CURRENTLY NOT AVAILABLE, TENATIVE ADVERTISEMENT DATE = JUNE 24, 2014. THIS WILL BE ADVERTISED ON A FULL AND OPEN BASIS. Location: New Mexico State Highway 15 crossing the north fork of the Gila River and providing the only vehicular access to the Gila Cliff Dwellings National Monument. The 200-foot bridge site is located approximately 45 miles north of Silver City, NM and highway access to the location is over twisty, windy, mountainous terrain featuring a combination of steep vertical grades & sharp horizontal curves. The bridge project is 0.25 miles in length at an elevation of 5,700 feet. The river is subject to adverse New Mexico weather conditions with late spring snowfall and drenching summer monsoon rains resulting in quick rising streams. The bridge site contains multiple Threatened & Endangered (T&E) Species with close coordination between FHWA and other governmental regulatory agencies required. Fish, Snake, etc. will need to be relocated outside of proposed construction limits. Existing 100-ft bridge will be dismantled and hauled off-site. Significant items and quantities: NM FLAP 15-2(1) will include structural concrete, reinforcing steel, drilled shafts, precast AASHTO girders, minor utility work, surveying, soil erosion control devices, roadway excavation, aggregate base, placing riprap and other hydraulic features, aggregate base, new asphalt pavement, removal of existing bridge, signing & pavement markings and temporary traffic control devices. NM SH 15 traffic will be maintained at all times during construction. Major Work quantites: Drilled shaft: 600 linear feet AASHTO girder: 784 linear feet Reinforcing steel: 72,000 pounds Structural concrete: 305 cubic yards Embankment construction: 8,200 cubic yards Revetment mattress: 3,100 square yards Aggregate base: 920 tons It is anticipated that this project will be advertised in June 2014. NTP is anticipated in late August 2014 and project completion in early summer 2015. The contracting range for this project is between $2 million and $4 million.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-14-B-00009/listing.html)
- Place of Performance
- Address: Gila National Forest, Catron County, New Mexico, United States
- Record
- SN03390768-W 20140612/140610235604-bf0c3ed55f46ef119ce76b3e91b19b87 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |