Z -- Conduit Repair, Cottonwood Springs Dam, Hot Springs, SD

Notice Date
6/18/2014
 
Notice Type
Presolicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
USACE District, Omaha, 1616 Capital Ave, Omaha, NE 68102-4901
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F-14-B-0021
 
Response Due
7/2/2014
 
Archive Date
8/17/2014
 
Point of Contact
David Neal, 4029952816
 
E-Mail Address
USACE District, Omaha
(david.w.neal@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Federal Business Opportunities Information Date: 2014 June 18 SOLICITATION NO. W9128F-14-B-0021 On or about 02 July 2014, this office will issue Invitations for Bid for construction of the Conduit Repair, Cottonwood Springs Dam, Hot Springs, SD. The solicitation will close on or about 01 August 2014. This solicitation is RESTRICTED TO SMALL BUSINESS PARTICIPATION. A site visit date/time will be issued with the solicitation package. _______________________________________________________________________________ Project Description: (Approx. quantities) The project consists of repairing joint damage to the existing outlet works conduit at Cottonwood Springs Dam. The cast-in-place reinforce concrete conduit has a 48-inch inside diameter and is 571.5 feet in length with 29 monoliths. Since the first periodic inspection, settlement and joint cracking of the conduit along the maximum fill section (monoliths 11 through 14) of the dam and above the impervious fill core trench has been reported. This cracking can be attributed to differential settlement of approximately 0.5 feet occurring primarily during the initial construction and the five to seven years following. An additional 0.1 feet (0.7 feet total) of settlement has occurred to date. Repairs shall consist of placing grout to eliminate offset and open joints in the conduit and then inverting a jointless cured-in-place pipe (CIPP) liner through the length of the conduit. The estimated construction cost of this project is between$250,000 and $500,000. _______________________________________________________________________________ The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 180 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety. Bidders (Offerors): Please be advised of on-line registration requirement for Representations and Certifications Application (ORCA) is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM. Obtaining Solicitation Documents: Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov). Find solicitation announcement in Fed Biz Opps (www.fbo.gov) 1.Use the 'Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the 'Find Opportunities' (large arrow in the middle of the page) or use the 'Opportunities' tab followed by the 'Advanced Search' tab. 2.By using the 'login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 3.Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading 'All Files' or from the 'Packages' tab. 4.If you want other vendors, sub-contractors or contractors to contact you, click on the 'Interested Vendors' tab and then 'Add me to Interested Vendors' link at the bottom of the page. Questions regarding contractual matters should be made to: David Neal 402 995 2816. Telephone calls regarding Small Business matters should be made to: 402 995 2910. Telephone calls on contents of drawings and specifications should be made to the Project Manager at: 402-995-2494 or Specification Section at: 402-995 2184. Commander U.S. Army Engineer District, Omaha ATTENTION: CENWO-CT-C 1616 Capitol Avenue Omaha, NE 68102 4901
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W9128F-14-B-0021/listing.html)
 
Place of Performance
Address: USACE District, Omaha - Cottonwood Springs Dam HC 69 Box 74 Hot Springs SD
Zip Code: 57747
 
Record
SN03398828-W 20140620/140619021823-6b565df978dab13de9bcf902aeca4d89 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.