SOLICITATION NOTICE
J -- Refurbish panels/textiles for E-3
- Notice Date
- 7/2/2014
- Notice Type
- Presolicitation
- NAICS
- 488190
— Other Support Activities for Air Transportation
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, Tinker AFB - AFSC/PZIO, 7858 5th Street Ste 1, Tinker AFB, Oklahoma, 73145-9106, United States
- ZIP Code
- 73145-9106
- Solicitation Number
- F3YTAJ4121A001
- Point of Contact
- Brandon S. Stout, Phone: 405-739-3438
- E-Mail Address
-
brandon.stout.5@us.af.mil
(brandon.stout.5@us.af.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- 1.1.2 Specific Tasks: The contractor shall accomplish the following procedures listed in this PWS in accordance with technical order 1E-3A-2-7. The contractor shall remove old vinyl, hardware, and doors required to accomplish the repair and recovering. The contractor shall repair the panel core, depressions, bumps, cracks, gouges, and dents on edges. The contractor shall ensure the top and bottom of wall panels shall have vinyl rolled over edges and all ceiling panels shall have vinyl rolled on inboard edges. The edges of all panels shall be properly prepared and painted to match the existing color of the panel. The contractor shall use white vinyl. 1.1.3 The contractor shall use consumable materials, adhesives, and potting compounds that are required by T.O. 1E-3A-2-7 specifications. The contractor shall disassemble and reassemble the large storage cabinet 204-1, small storage cabinet 204-2 and the technical order cabinet 204-3, to install vinyl covering on panels, and the new larger cabinet 204-40582-4. 1.1.4 The contractor shall apply vacuum bags over panels in the curing stage at a pressure of 10 to 20 psi and cure for 2-4 hours at 120 degrees for 8-12 hours at room temperature as required by T.O. 1E-3A-2-7 paragraph 8.97.1. 1.1.5 The panels range in size from 4"x 4"doors, 2'x2' doors, 4'x 6' to 2 ½' x 7' panels with an estimated average 4'x4'. The contractor shall remove any seals, hardware, etc., attached to panels to facilitate removal of vinyl. Save all hardware for reinstallation. The contractor shall reinstall any seals, hardware, etc., after installation of new vinyl. The contractor shall repair or replace all loose and broken hardware which remains on and is a permanent part of the panel assembly. All panel grates shall be removed, painted and reinstalled.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCBC/F3YTAJ4121A001/listing.html)
- Record
- SN03413363-W 20140704/140703002613-e68f248fd7a7bfba0a1c4b7b2bc4a416 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |