Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 20, 2014 FBO #4621
MODIFICATION

Z -- Reconstruction of the American Canal Lining Lower Segment

Notice Date
7/18/2014
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
International Boundary and Water Commission, Information Management Division, Acquisition Division, 4171 North Mesa, Suite C-100, El Paso, Texas, 79902, United States
 
ZIP Code
79902
 
Solicitation Number
IBM14B0002
 
Point of Contact
Laura A. Baker, Phone: 915-832-4119
 
E-Mail Address
laura.baker@ibwc.gov
(laura.baker@ibwc.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS A PRESOLICITATION NOTICE ONLY AND NOT A SOLICITATION. THE SOLICITATION PACKAGE WILL BE AVAILABLE AFTER THE CLOSING DATE OF THIS PRESOLICITATION NOTICE. BIDS/PROPOSALS ARE NOT BEING SOLICITED OR ACCEPTED AT THIS TIME. The Solicitation, plans, and specifications are expected to be posted on or about July 25, 2014 (this is a target date which may slip or change; if the Solicitation is not posted on Federal Business Opportunities by July 25, 2014 that is because the Solicitation is not available for posting). The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit an offer after the Solicitation is released. General Description of the Work - The work for this project generally consists of the demolition of reinforced concrete open channel canal, and replacement with reinforced concrete closed conduit canal. The purpose of this project is to rebuild the deteriorated, concrete-lined American Canal, which is located in El Paso, Texas. The American Canal begins at the American Diversion Dam, near the intersection of Executive Center Boulevard and West Paisano Drive (U.S. Highway 85), and extends alongside the Rio Grande for nearly 0.5 mile, where it crosses through a culvert under West Paisano Drive. After exiting this first culvert on the opposite side, the canal runs along the east side of highway for roughly 0.6 mile, where it crosses through a second culvert under West Paisano Drive and exits on the west side adjacent to the Rio Grande. The canal continues downstream for another 0.5 mile, at which point it connects to the Hart's Mill Stilling Basin, which is the beginning of the American Canal Extension, near the old West Yandell Drive overpass and the International Diversion Dam in the Rio Grande. The canal is accessible from various access points off West Paisano Drive. The American Canal is subdivided into three segments; each segment is separated by a highway culvert. Reconstruction of each segment will be performed separately. The work under this contract is limited to the reconstruction of the American Canal's lower segment only. This lower canal segment extends approximately 0.5 mile from where it exits the second highway culvert under Paisano Drive and runs downstream to the Hart's Mill Stilling Basin near the International Diversion Dam in the Rio Grande. The existing canal has a flow capacity of 1200 cubic feet per second (cfs). The new canal system capacity will be increased to 1,535 cfs. Major Construction Tasks - (1) Preparation of right of way (clearing and grubbing). (2) Construction of ramps. (3) Demolition and disposal of existing reinforced concrete canal. (4) Construction of cast-in-place reinforced concrete transitions and rectangular-shape culvert sections for the base of the canal. (5) Fabrication and installation of precast reinforced concrete arched, rectangular-shape sections for the top of canal. (6) Dewatering and possible treatment of contaminated ground water. (7) Removal and disposal of contaminated soils, and replacement with suitable backfill. (8) Re-seeding and establishment of vegetation for erosion control. (9) Cleaning and removing debris from job site. (10) Reestablishment of embankments and roadways. The magnitude of this project is more than $10,000,000. Performance Period -The canal and necessary structure work for conveyance of irrigation waters shall be constructed during the non-irrigation season, which runs from October 1 to February 28. However, due to current hydrologic conditions in the Rio Grande Basin, the non-irrigation season may be extended beyond February 28. Only work that does not impact on the system's ability to deliver irrigation water (i.e. staging, construction/restoration of berms, fences, grounds, vegetation, etc.) may continue into the irrigation season. All work required for the conveyance of irrigation waters shall be completed during the non-irrigation season, which will be one hundred fifty (150) calendar days at a minimum. All other work, excluding revegetation, shall be completed within three hundred sixty-five (365) calendar days. Reseeding and maintenance of seed and vegetation shall be completed within one hundred eighty (180) calendar days of completion of all other work. All project work, including revegetation, shall be done within five hundred forty-five (545) calendar days.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/IBWC/IMD/ElPasoTX/IBM14B0002/listing.html)
 
Place of Performance
Address: El Paso, Texas, United States
 
Record
SN03429866-W 20140720/140718234414-99972c15dff6e357b566077aad57551f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.