DOCUMENT
36 -- VA797R-14-R-0029 - LITTLE ROCK, AR LAUNDRY EQPT REQUEST FOR INFORMATION ONLY - Attachment
- Notice Date
- 7/18/2014
- Notice Type
- Attachment
- NAICS
- 333318
— Other Commercial and Service Industry Machinery Manufacturing
- Contracting Office
- Department of Veterans Affairs;OAL/National Acquisition Center;Building 37 NCS (003A4C1);1st Avenue, One Block North of Cermak;Hines IL 60141
- ZIP Code
- 60141
- Solicitation Number
- VA797R14R0029
- Response Due
- 7/31/2014
- Archive Date
- 9/29/2014
- Point of Contact
- Patricia Gibson-Anderson
- E-Mail Address
-
Contracting Officer
(Patricia.gibson-anderson)
- Small Business Set-Aside
- N/A
- Description
- SCHEDULE OF SUPPLIES/SERVICES and PRICES/COSTS ITEM # 1 Laundry Ancillary Support Water Storage/Pumping System Equipment, and related systems: Furnish and install new, one (1) system. The laundry ancillary support water storage/pumping system equipment and water softening system. Qty: 1 System Unit Price$ ______________ eachTotal for 1 System $____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 2 Non-Recessed Floor Scales: Furnish and install 2 (ea) non-recessed floor scales with a maximum weight capacity of 3000 pounds, recessed within the floor Qty: 2 Unit Price$ ______________ eachTotal for 2 $____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 3 Soil Storage/Sorting Conveyor System: Furnish and install new, 1 (system). Qty: 1 System Unit Price$ ______________ SystemTotal for 1 System $____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 4 Refurbish and Install Automated Soil and Clean Side Monorail System - Refurbish two (2) system automated monorail system on both the clean and soiled sides of the textile care processing facility. Qty: 2 Refurbished System Unit Price$ _________ System Total for 2 Systems $________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 5 Continuous Wash Extract Tunnel Washing Systems: Furnish and install two (2) each, Continuous Wash Extract Washing Systems (CWEWS).. Qty: 2 Systems Unit Price$ ______________ each Total for 2 systems$____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 6 400/500-POUND WASHER-EXTRACTOR: Furnish and install new, one (1) each, open pocket automatic loading non-production washer extractor. Qty: 1 each Unit Price$ ______________ eachTotal for 1 each$____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 7 200/300-POUND WASHER-EXTRACTOR: Furnish and install new, one (1) each, open pocket automatic loading non-production washer extractor. Qty: 1 each Unit Price$ ______________ eachTotal for 1 each$____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 8 400/500 POUND GAS HEATED DRYING AND CONDITIONING TUMBLER WITH EXTERNAL LINT COLLECTION: Furnish and install new, one (1) each, 400/500 LB drying and conditioning tumbler. Qty: 1 each Unit Price$ ______________ eachTotal for 1 each$____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 9 100/110 LB Washer Extractors Furnish and install new, three (3) each, 100/110 LB washer extractors. Qty: 3 each Unit Price$ ______________ eachTotal for 3 each$____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 10 110/120 Pound (Non-Production) Gas Heated Drying and Conditioning Tumblers: Furnish and install three (3) each 110/120-pound gas heated dryer with internal lint collection. Qty: 3 each Unit Price$ ______________ eachTotal for 3 each$____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 11 Flatwork Ironing Systems: Furnish and install two (2) each, color touch screen controls & information systems" that incorporate automatic/manual machine operation, self-testing, fault display and built-in diagnostics. Qty: 2 systems Unit Price$ ______________ eachTotal for 2 systems____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 12 Small Piece Folding Machines: Furnish and install 4 (ea.) color touch screen controls & information systems" that incorporate automatic/manual machine operation, self-testing, fault display and built-in diagnostics. Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 13 Folding Tables: Furnish and install 6 (ea), folding tables and storage devices. Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ *************************************************************************************************************ITEM # 14 Central Wet/Dry Vacuum System: Furnish and install one (1), 20 horsepower central wet/dry vacuum system. Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ITEM # 15 Industrial Laundry Plant Management System: Furnish and install new, one (1) each Industrial Laundry Plant Management System. Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 16 Air Filtration System: Furnish and install new three (3) each Air Filtration Systems. Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ *************************************************************************************************************************** ITEM # 17 Garment Tunnel Finisher: Furnish and install 1 (ea) Garment Tunnel Finisher. Qty: 1 Unit Price$ ______________ eachTotal for 1 $____________ Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 18 Blanket Folder System: The successful offeror shall provide and install one (1) ea. Blanket folding system. Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ ************************************************************************************************************* ITEM # 19 Portable Plastic Wrapping Machine: The successful offeror shall provide and install a plastic, heat seal portable wrapping machine. Total Installation Costs:$______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Final Cost $ _____________ *************************************************************************************************************
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VANAC/VANAC/VA797R14R0029/listing.html)
- Document(s)
- Attachment
- File Name: VA797R-14-R-0029 VA797R-14-R-0029 RFI.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1508955&FileName=VA797R-14-R-0029-000.docx)
- Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1508955&FileName=VA797R-14-R-0029-000.docx
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: VA797R-14-R-0029 VA797R-14-R-0029 RFI.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1508955&FileName=VA797R-14-R-0029-000.docx)
- Place of Performance
- Address: VAMC Little Rock, AR
- Zip Code: 72106
- Zip Code: 72106
- Record
- SN03430221-W 20140720/140718234735-81775442c83f2e8d6040d78463673586 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |