MODIFICATION
F -- F - NRO - EDL LANDFILL STUDY 2014
- Notice Date
- 7/28/2014
- Notice Type
- Modification/Amendment
- NAICS
- 541620
— Environmental Consulting Services
- Contracting Office
- BIA NAVAJO 00009301 WEST HILL ROOM 346Contracting OfficeGallupNM87301US
- ZIP Code
- 00000
- Solicitation Number
- A14PS00713
- Response Due
- 8/6/2014
- Archive Date
- 9/5/2014
- Point of Contact
- MARY JANE JOHNSON
- Small Business Set-Aside
- Total Small Business
- Description
- Amendment No.: 0002 is for solicitation No.: A14PS00713 as follows: 1. To include the government's response to questions received. A) The solicitation documents indicate that there are additional information regarding the 33 Landfill sites. Task 2: Mobilization described in page 11 of the solicitation states the documents can be viewed at the NRO office. Can we view these documents prior to the due date of Aug 6? Response: Yes. Please call and arrange a viewing time. B) Do these documents have information regarding the approximate locations, dimension and depth? This data can help us provide you with a better overall cost estimate to perform the work. Response: Yes. C) On page 11 of 42 of the solicitation, it is indicated that 4 of the 33 sites are open while 28 sites have been closed. What is the status of the remaining 1 site? Response: It is closed. See attached table. D) On page 11 of 42 of the solicitation, it states The investigation shall be designed to collect and provide the necessary information and field data to enable the contractor to develop cost estimates to return the site into compliance with applicable regulatory closure standard. This may include, but not limited to, repair or replacement of the existing cover, construction of drainage and erosion control measures and any removal debris caused by illegal dumping. To clarify, the requested scope of work here is limited to providing a cost estimate to bring the site into compliance only and not the performance of any construction work associated with bringing the site to compliance. Please clarify. Response: The cost estimates are to provide estimated costs to repair or replace, cost estimate to develop appropriate drainage and costs estimates to install any erosion controls, and cost estimate to remove any debris caused by illegal dumping. There is no construction. Estimates will be used to document costs in the EDL listing. E) Under Tasks 3 and 4, the scope of work include preparation of the closure plan by professional engineer in accordance with the 40 CFR 258 with closure estimate and preparation of EECA reports. Can this be one document for all 33 landfill sites or do they have to be standalone document for each site (i.e., separate reports/plans)? Response: The documents shall be stand alone for each site. The successful bidder will visit each site and prepare a separate document for each location. F) If the landfills in question had GPS locations. Logistically, this would be very beneficial in bidding these locations since there are 33 of them. Response: The landfill files do contain GPS coordinates for each landfill. They are available for review in the files. G) Contractor is planning on bidding on this project, but I just wanted to double check one thing: The task summary on page 1 says there are 33 landfills to visit, but the item list on the following pages only has 30 locations. Are there 3 missing, or are there really only 30 landfills to visit? Response: There are 33. H) Do you know how many there are in Wingate and Many Farms? Response: There are three (3) at Wingate and two (2) at Many Farms. 2. No more questions will be accepted. All other terms to remain the same.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BIA/RestonVA/A14PS00713/listing.html)
- Record
- SN03440113-W 20140730/140728234934-be7ec5f44fc56db79cd0693bcb1dd60d (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |