AWARD
Y -- Building 765 Repair Mens and Womens Restrooms, Kirtland Air Force Base, Bernalillo County, New Mexico
- Notice Date
- 7/29/2014
- Notice Type
- Award Notice
- NAICS
- 238390
— Other Building Finishing Contractors
- Contracting Office
- USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
- ZIP Code
- 87109-3435
- Solicitation Number
- W912PP-14-T-0057
- Archive Date
- 8/28/2014
- Point of Contact
- Karen Irving, (505) 342-3356
- E-Mail Address
-
USACE District, Albuquerque
(karen.k.irving@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PP-14-P-0055
- Award Date
- 7/29/2014
- Awardee
- GRANCOR ENTERPRISES, INC. (185613887) <br> 2121 MENAUL BLVD NE <br> ALBUQUERQUE, NM 87107-1714
- Award Amount
- $96,372.11
- Line Number
- 0001
- Description
- This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. a. Demolition 1. Contractor shall abate all existing floor tile, cove base and all mastic in restroom. 2. Contractor shall remove existing gyp. bd. and wainscot, as indicated on drawings. 3. Contractor shall remove existing partitions and bathroom fixtures, as indicated on drawings. 4. Contractor shall relocate existing floor drain, as indicated on drawings. 5. Contractor shall remove existing flooring, as indicated on drawings. 6. Contractor shall remove existing electrical/comm, as indicated on drawings. 7. Contractor shall remove existing electrical panel and topaz unit, as indicated on drawings. 8. Contractor shall remove existing wall, as indicated on drawings. 9. Contractor shall relocate existing water lines, as indicated on drawings. 10. Contractor shall remove existing copper lines, as indicated on drawings. 11. Contractor shall remove existing door, frame and hardware, as indicated on drawings. 12. Contractor shall remove existing ceiling grid, tiles, HVAC diffusers, lights, security light, exhaust fan and speaker, as indicated on drawings. 13. Contractor shall remove existing audio control box and salvage for reinstallation, as indicated on drawings. b. Construction 1.Contractor shall provide and install new gyp. bd., insulation and paint, as indicated on drawings. 2. Contractor shall provide and install new FRP, as indicated on drawings. 3. Contractor shall install new government provided paper towel dispenser, soap dispenser, and toilet paper dispenser, as indicated on drawings. 4. Contractor shall provide and install new sinks, as indicated on drawings. 5. Contractor shall provide and install new faucets, as indicated on drawings. 6. Contractor shall provide and install new mirrors, as indicated on drawings. 7. Contractor shall provide and install new walls, as indicated on drawings. 8. Contractor shall provide and install new grab bars, as indicated on drawings. 9. Contractor shall provide and install new toilets, as indicated on drawings. 10. Contractor shall provide and install new floor transition strips, as indicated on drawings. 11. Contractor shall provide and install new doors, frames and hardware, as indicated on drawings. 12. Contractor shall provide and install new electrical panel, as indicated on drawings. 13. Contractor shall provide and install new flooring and rubber wall base, as indicated on drawings. 14. Contractor shall provide and install new countertop, as indicated on drawings. 15. Contractor shall provide and install new water heater, as indicated on drawings. 16. Contractor shall provide and install new GFCI outlet, as indicated on drawings. 17. Contractor shall provide and install new floor drain, as indicated on drawings. 18. Contractor shall provide and install new cabinet, as indicated on drawings. 19. Contractor shall provide and install new HVAC supply and return air diffusers, as indicate on drawings. 20. Contractor shall provide and install new fire alarm strobe light, as indicated on drawings. 21. Contractor shall provide and install new exhaust fans, as indicated on drawings. 22. Contractor shall provide and install new lights, as indicated on drawings. 23. Contractor shall provide and install new access panels, as indicated on drawings.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-14-P-0055.html)
- Record
- SN03441078-W 20140731/140729234716-87d8604ad31178b864c713fff3ead9b1 (fbodaily.com)