Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 31, 2014 FBO #4632
MODIFICATION

45 -- Annual Bioler Maintenance

Notice Date
7/29/2014
 
Notice Type
Modification/Amendment
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Agricultural Research Service - Western Business Service Center
 
ZIP Code
00000
 
Solicitation Number
AG-32SD-S-14-0052
 
Archive Date
8/16/2014
 
Point of Contact
Robert Risch, Phone: 541-738-4006, Mark Williams, Phone: 541-738-4010
 
E-Mail Address
rob.risch@ars.usda.gov, COR-ACTING.FOS@ARS.USDA.GOV
(rob.risch@ars.usda.gov, COR-ACTING.FOS@ARS.USDA.GOV)
 
Small Business Set-Aside
N/A
 
Description
Site visit questions and Answers: Questions from the Boiler Site Conference July 23, 2014 1:00 pm 1 - Is this a Full Service Contract? Yes this is a Full- Service Contract 2 - All repairs to be included on this contract? Yes, all parts, supplies, tools required are to be furnished by the contractor. Contractor is not responsible for problems that arise from "Act of God" (i.e. Power surges, lighting strikes, war, floods, etc.) Contractor will be responsible for removing all used parts and materials (oil, bearings, etc.) 3 - Does the contract include vessel inspection? How often? Whose cost? Yes, the contract includes vessel inspection, only for the 2 steam boilers. Government is aware this requires tear down, certified inspector to complete work and bring boiler back on-line. Vessel inspection on these 2 boilers will follow manufacturer's recommendations or at the minimum yearly. Contractor is responsible for all costs and scheduling related to vessel inspector. 4 - How does contractor access the units? The contractor will schedule3 - 5 work days ahead with the COR, a time to complete the service. The contractor will get permission from the COR before shutting any systems down or starting any fire related work (welding, soldering, grinding, etc.). 5 - Are the Hot water heaters included in the contract? No the hot water heaters are not included in the contract. 6 - The government will have the broken flange and safety valve replaced and functioning properly before the contract is awarded.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/ef9a68daac3e46bf2d052a8dc2da7b1d)
 
Place of Performance
Address: USDA ARS PWA HCRL 3420 NW Orchard Avenue Corvallis OR 97330, USDA ARS PWQ NFPRC 3450 SW Campus Way Corvallis OR 97331, USDA ARS PWA NCGR 33447 Peoria Road Corvallis OR 97333, Corvallis, Oregon, 97331, United States
Zip Code: 97331
 
Record
SN03441239-W 20140731/140729234849-ef9a68daac3e46bf2d052a8dc2da7b1d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.