Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 01, 2014 FBO #4633
MODIFICATION

Z -- Flat Creek and Wall Ck Culvert Replacement, Nez Perce/Clearwater NF - IMAT - Solicitation 1

Notice Date
7/30/2014
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
 
ZIP Code
83815-8363
 
Solicitation Number
AG-02RC-S-14-0092
 
Archive Date
9/30/2014
 
Point of Contact
Michael J. Allred, Phone: 4062837618
 
E-Mail Address
mjallred@fs.fed.us
(mjallred@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Attachment 05 - Wage Determination Attachment 06 - Idaho State Workers Comp. Insc. Attachment 04 - Wall Creek Sup. Specs. Attachment 03 - Wall Ck Drawings - page 5 Attachment 03 - Wall Ck Drawings - page 4 Attachment 03 - Wall Ck Drawings - page 3 Attachment 03 - Wall Ck Drawings - page 2 Attachment 03 - Wall Ck Drawings - page 1 Attachment 02 - Flat Creek Supplemental Specifications Attachment 01 - Flat Creek Drawings Solicitation This notice is amended to include the Wall Creek Culvert replacement and increases the expected estimated cost. Flat Creek Culverts: This project is for the removal of an existing culvert in Flat Creek and replacing it with a new structural plate arch on precast concrete footings. This project is located in the Clearwater National Forest on National Forest System Road No. 247 at Mile Post 39.3 in the North Fork Ranger District in Section 1, T39N, R7E, Clearwater County, Idaho. The work includes but is not limited to clearing and grubbing, erosion control measures, structure excavation, roadway excavation, removing and disposing an existing culvert, compaction, riprap, roadway surfacing, furnishing and installing precast concrete foundations, furnishing and erecting a structural-plate arch culvert, and all other incidental items necessary to complete the project in accordance with the plans and specifications. Location: The project site is located at milepost 39.3 on USFS Road 247, Flat Creek. From U.S. Highway 12, turn north onto State Highway 11, at Greer Junction. Travel north on State Highway 11 to milepost 23, just south of Pierce, ID. At approximately milepost, 23 turn east onto USFS Road 250. Travel on USFS Road 250 to milepost 29.0, the Bungalow Bridge crossing the North Fork of the Clearwater River. Across the Baglow Bridge on the north side of the river turn left onto USFS Road 247 and travel down river approximately 11.6 miles to the project site at Flat Creek. Estimated Period of Performance Flat Creek: From Contract Award to 10/30/2014 Wall Creek: Description of Work: This project is for the removal of an existing 48" dia. by 50' culvert and replacing with a 103" x 71" x 40' corrugated metal pipe arch. This project is located in the Clearwater National Forest on National Forest System Road No. 712 approximately milepost 1.4, North Fork Ranger District in Sections 7, T40N, R9E, Clearwater County, Idaho. The work includes but is not limited to clearing and grubbing, erosion control measures, structure excavation, removing and disposing an existing culvert, installation a new corrugated metal pipe arch, compaction, and all other incidental items necessary to complete the project in accordance with the plans and specifications. b Project Location. - The project site is located at approximate milepost 1.4 on USFS Road 712. From U.S. Highway 12, turn north onto State Highway 11, at Greer Junction. Travel north on State Highway 11 to Pierce, ID. Just before entering Pierce turn right onto USFS Road 250. Travel on USFS Road 250 to the Junction of USFS Road 250 and 711 at milepost 44. Turn Left onto USFS road 711 and travel approximately 20 mile to the junction of USFS Road 711 and USFS Road 712. Turn right on to USFS Road 712 and travel approximately 1.4 mile to the project site. Estimated period of performance Wall Creek: 7/15/2015 - 8/31/2015 This project is estimated between $100,000 and $250,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-14-0092/listing.html)
 
Place of Performance
Address: 12730 HWY 12, Orofino, Idaho, 83544, United States
Zip Code: 83544
 
Record
SN03442755-W 20140801/140730234809-0b078e264c833e3e1f98df5802a3049f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.