Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 01, 2014 FBO #4633
MODIFICATION

Z -- FRANKLIN FALLS TRAIL TURNAROUND AND STAIRWAY CONSTRUCTION - Solicitation 1 - Copy to Submit

Notice Date
7/30/2014
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Northwest Contracting Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201, United States
 
ZIP Code
98201
 
Solicitation Number
AG-05M6-S-14-0038
 
Response Due
8/25/2014 2:00:00 PM
 
Point of Contact
Jorge A. Somoza, Phone: (425) 783-6053
 
E-Mail Address
jsomoza@fs.fed.us
(jsomoza@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Copy to Submit Solicitation This project involves the construction of a trail turnaround/terminous and masonry stone stairways at the base of Franklin Falls and near the end of the Franklin Falls Trail #1036. Work includes the installation of masonry stone retaining walls, masonry stone steps, an overlapping rock stairway, aggregate surfacing, and drainage structures. The contractor will be responsible for the purchase, mobilization, and installation of all portions of the project. Rock to be used for the construction of masonry retaining walls and steps will be Government Furnished. Project Location: This project is located on the Snoqualmie Ranger District/North Bend Area, of the Mt. Baker-Snoqualmie National Forest. Drive I-90 east from Seattle or Bellevue to Exit 47. Turn left, follow signing to the Denny Creek Campground on FSR #58. Drive past the main campground entrance. In ¼ mile turn left. The main Franklin Falls Trailhead is directly on the left, before crossing a concrete bridge. Hike the Franklin Falls Trail 1.0 miles. The project begins at the junction of Franklin Falls and the Wagon Road Trail. Alternative access points are located along FSR#58. One at the center point of the trail and another at the top. Parking is limited at the upper access points. The Government's estimated price is between $25,000 and $100.000. This project is 100% set aside for Small Business. Bonding is required. The desired start date of the project is July 6th 2015 with a completion date of November 1st 2015. Attention: A pre-bid meeting will take place at 9:00 am, 8/4/2014; We will visit the rock source at the seed orchard. The site is currently on a closed road and behind and locked gate. Please notify the technical contacts by 3:00pm on 8/1/2014 if planning to attend. This meeting is not mandatory, however the site will only be available for viewing at this time. The rock source site will be available to the contractor after award. The location for the meeting is the Snoqualmie Ranger District, White River Office, located at 450 Roosevelt Ave. E. Enumclaw, WA 98022 Technical points of contact for this project is Hailu Gabriel at (425) 888-8783 or e-mail at hgabriel@fs.fed.us or Kathy White at (360) 319-5090 or email krwhite@fs.fed.us.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-14-0038/listing.html)
 
Place of Performance
Address: 902 SE NORTH BEND WAY, North Bend, Washington, 98045-9545, United States
Zip Code: 98045-9545
 
Record
SN03442945-W 20140801/140730234954-96471e1c04bd04e497d9c38f64d5238b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.