SOLICITATION NOTICE
J -- REPAIR OIL SPILL RESPONSE(OSR)EQUIPMENT CONTAINERS
- Notice Date
- 8/3/2014
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- N68836 NAVSUP Fleet Logistics Center Jacksonville Mayport Office Bldg. 191, Naval Station Mayport Fleet Contracting Center Mayport, FL
- ZIP Code
- 00000
- Solicitation Number
- N6883614T0238
- Response Due
- 8/7/2014
- Archive Date
- 8/22/2014
- Point of Contact
- Mary L Hart 904-270-5699 X150
- E-Mail Address
-
Mary Hart
(mary.hart@navy.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- STATEMENT OF WORK (SOW) FOR THE REPAIRS TO EIGHT WEATHER RESISTANT OIL SPILL RESPONSE EQUIPMENT CONTAINERS 1. SCOPE: Repair or replace eight weather resistant oil spill response equipment containers to include transporting from and to Naval Station Mayport, Jacksonville, Florida, and one container to St Mary ™s GA (RBMC) upon completion. Removal of door assemblies including all door hardware, gaskets and retainer strips, replace door header, drip rail, and door sill, crop out and replace small areas of deteriorated roof. Patch side panels and weld repair any holes, drill vent holes into panels and install new vent covers. Heat and straighten dents in panels as required, abrasive blasting interior and exterior, coating with a fast clad zinc HS reinforced zinc primer, Seaguard 5000HS, topcoating with Acrolon 218 HS acrylic Polyurethane paint. Install decals, zerk fittings to all doors and hinges and lubricate. Install new door gaskets, new stainless steel retainer strips and new stainless steel fasteners on both cargo doors. Install two, 8ft steel roll up doors symmetrically placed along one 40ft long panel. 2. OSR EQUIPMENT CONTAINTER IDENTIFICATION: 2.1 40 ™(L) x 8 ™(W) x 8.5 ™(H) weather resistant locker #001 Rpr/Rpl (Mypt Slab) 2.2 40 ™(L) x 8 ™(W) x 8.5 ™(H) weather resistant locker #002 Rpr/Rpl (Mypt Slab) 2.3 40 ™(L) x 8 ™(W) x 8.5 ™(H) weather resistant locker #003 Rpr/Rpl (Mypt Back 40) 2.4 40 ™(L) x 8 ™(W) x 8.5 ™(H) weather resistant locker #004 Rpr/Rpl (Mypt Chouest) 2.5 40 ™(L) x 8 ™(W) x 8.5 ™(H) weather resistant locker #005 Rpr/Rpl (Mypt MSF) 2.6 20 ™(L) x 8 ™(W) x 8.5 ™(H) weather resistant locker #006 Rpr/Rpl (Mypt Back 40) 2.7 20 ™(L) x 8 ™(W) x 8.5 ™(H) weather resistant locker #007 Rpr/Rpl (Mypt Back 40) 2.8 20 ™(L) x 8 ™(W) x 8.5 ™(H) weather resistant locker #008 Rpr/Rpl (Mypt Subs) 3. REFERENCES: None 4. REQUIREMENTS: 4.1 Equipment lockers are located at Naval Station Mayport. 4.2 Contractor is responsible for transporting 8 containers from NAVSTA MAYPORT and upon completion (repairs and/or replacement) deliver 7 containers back to NAVSTA MAYPORT and 1 container to St Mary ™s GA “ Regional Boat Maintenance Facility (RBMC) 5. PERIOD OF PERFORMANCE: 5.1 All work to be completed by 1 December 2014. 6. WORK TO BE ACCOMPLISHED ON OSR EQUIPMENT CONTAINERS: 6.1 Contractor coordinate with gov ™t representative to pick-up containers and transport to contractors facility. 6.2 Weather resistant containers listed in 2.1 thru 2.8, replace containers where required and refurbish all eight containers, to include refurbishing door assemblies, hardware, gaskets and retainer strips. 6.3 Replace door header, drip rail, door sill. Weld repair roof to make water tight. 6.4 Patch side panels and nose panel to make water tight. Clad weld or crop out and replace areas of side panel that are rusted through. Drill vent holes in side panels and install two new vent covers per container. 6.5 Heat and straighten multiple dents in doors and side panels as needed. 6.6 Ensure surface profile of equipment container has been blasted to an SP-10 profile, all sides bottom, top, ends, apply 40mil thickness of Sherwin Williams Fast Clad Zinc HS Reinforced Zinc Primer, apply one coat of Sherwin Williams Seaguard 5000HS, and one coat of Sherwin Williams Acrolon 218 topcoat to equipment container interior and exterior. (white interior, haze grey exterior) 6.7 Install 4 inch vinyl lettering on rollup doors as per gov ™t rep, install zerk fittings to all door hinges and lubricate hinges. 6.8 Install all new door gaskets, new stainless steel retainer strips and stainless steel fasteners on all cargo doors. 6.9 For lockers listed in 2.1 thru 2.4, install two, 8ft steel roll up doors symmetrically placed along one 40ft long panel. For locker 2.1 install three roll up doors. 6.10 For 20 ™ locker listed in 2.5, contractor to install rack along left side wall of container to support storage of 5 ™ posts. 6.11 Contractor coordinate with gov ™t representative for final inspection and delivery to Mayport Naval Station. Government Representative Robert Novotny Commander Navy Region Southeast, code N313 Box 102, Naval Air Station Jacksonville, FL. 32212-0102 Phone: 904-542-0954 Cell: 904-591-7024 Email: Robert.e.novotny@navy.mil
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVSUP/N68836Mayport/N6883614T0238/listing.html)
- Place of Performance
- Address: PORT OPERATIONS, NS MAYPORT, Mayport, FL
- Zip Code: 32228
- Zip Code: 32228
- Record
- SN03447752-W 20140805/140804020505-e15734700548cf0c98d56dc97ce6945b (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |