Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 10, 2014 FBO #4642
MODIFICATION

J -- Repair Air System for Boilers #2, 3, and 4 - Amendment 1

Notice Date
8/8/2014
 
Notice Type
Modification/Amendment
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, HQ Arnold Engineering Development Complex (AEDC) - Arnold, 100 Kindel Drive, Suite A-335, Arnold AFB, Tennessee, 37389-1335, United States
 
ZIP Code
37389-1335
 
Solicitation Number
FA9101-14-B-0008
 
Response Due
8/20/2014 2:00:00 PM
 
Archive Date
9/4/2014
 
Point of Contact
Rebecca Gardner, Phone: 931-454-4405
 
E-Mail Address
rebecca.gardner.1@us.af.mil
(rebecca.gardner.1@us.af.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment 0001, providing photographs and www.SAM.gov information. Photographs, Set 4: Views of and around Boiler 2 induced draft fan. Photographs, Set 4: Views of and around Boiler 2 induced draft fan. Photographs, Set 4: Views of and around Boiler 2 induced draft fan. Photographs, Set 4: Views of and around Boiler 2 induced draft fan. Photographs, Set 3: Boiler 2 fan ducting to be demolished. Photographs, Set 3: Boiler 2 fan ducting to be demolished. Photographs, Set 3: Boiler 2 fan ducting to be demolished. Photographs, Set 3: Boiler 2 fan ducting to be demolished. Photographs, Set 3: Boiler 2 fan ducting to be demolished. Photographs, Set 3: Boiler 2 fan ducting to be demolished. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 2: Boilers 2, 3 and 4Forced Draft and Induced Draft Damper control system, operators, and actuators. Photographs, Set 1: 1st Floor Boiler 2 ash hopper and 2nd Floor Boiler 2 exhaust duct mechanical,dust collector. Photographs, Set 1: 1st Floor Boiler 2 ash hopper and 2nd Floor Boiler 2 exhaust duct mechanical dust collector. Photographs, Set 1: 1st Floor Boiler 2 ash hopper and 2nd Floor Boiler 2 exhaust duct mechanical dust collector. Photographs, Set 1: 1st Floor Boiler 2 ash hopper and 2nd Floor Boiler 2 exhaust duct mechanical dust collector. Photographs, Set 1: 1st Floor Boiler 2 ash hopper and 2nd Floor Boiler 2 exhaust duct mechanical dust collector. Photographs, Set 1: 1st Floor Boiler 2 ash hopper and 2nd Floor Boiler 2 exhaust duct mechanical dust collector. Photographs, Set 1: 1st Floor Boiler 2 ash hopper and 2nd Floor Boiler 2 exhaust duct mechanical dust collector. Posting Amendment 0001. The Standard Form 30 is located at the end of the photogrpahs. Please acknowledge the amendment in your bid by either signing the SF30 or by completing Block 19 on page two of the Solicitation, SF1442. --Offerors are to register with System for Award Management at www.SAM.gov. --Photographs are being provided. See attachments for details. It is the responsiblity of all interested parties to review www.FBO.gov frequently for any future amendments. Solicitation and Amendment documents will not be provided outside of FBO.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/AEDC/FA9101-14-B-0008/listing.html)
 
Place of Performance
Address: Arnold Engineering Development Complex (AEDC), Arnold AFB, Tennessee, 37389, United States
Zip Code: 37389
 
Record
SN03457975-W 20140810/140808235123-300b972eab1e7eea1a815933db92ba7f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.