FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 16, 2014 FBO #4648
SOLICITATION NOTICE

38 -- CA FLAP 111(1) Beckwourth Genesee Road

Notice Date
8/14/2014
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6814B00011
 
Point of Contact
Jason J Longshore, Phone: 7209633354
 
E-Mail Address
jason.longshore@dot.gov
(jason.longshore@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
PROJECT DETAILS: CA FLAP 111(1), Beckwourth-Genesee Road Project Details: The Beckwourth-Genesee Road project is located in Plumas County and in the Plumas National Forest on California Forest Highway (FH) 177 near Beckwouth, California. The project consists of pulverizing, grading, drainage, asphalt surfacing, and a Geosynthetic Reinforced Soil (GRS) bridge over Crocker Creek for a distance of 9.73 miles of roadway. The project begins just north of CA HWY 70, thence north to the junction of Genesee Road. Portions of the road are on new alignment (4R), while the remainder is surfacing or resurfacing on existing alignment. The major work elements include pulverizing of the existing pavement to a depth of 9 inches, major grading, asphalt surfacing of 3 inches, extensive timber removal, selective clearing, drainage structures, and construction of the GRS bridge. Due to the Forest habitat, the project is environmentally sensitive. Snow melt typically occurs in late Spring is this area, and snow falls in late Fall, thus controlling commencement and termination of construction operations. With the exception of timber removal and clearing, construction work is expected to take place between the months of April through early November, 2015, and April through August, 2016. Timber harvesting must take place during limited times (November through February, 2015 and/or 2016) in order to minimize habitat disturbance This project presents significant challenges due to the high volume of heavy timber removal, major grading and hauling operations through sensitive properties, and the technical aspects of GRS bridge construction. To achieve success on this project, experience in these areas by the successful contractor is highly mandatory. Temperature dependent work items such as asphalt paving, and pavement marking must be completed in dry conditions, for which seasonal conditions are limited. It is anticipated that this project will be advertised 0n August 28, 2014 with construction occurring from late October through August, 2016. The contracting range for this project is between $16 million and $19 million. This project will be adverstised on an unrestricted basis.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6814B00011/listing.html)
 
Record
SN03465343-W 20140816/140814235722-9cbf074f59636bc090585e049604998c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.