Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 17, 2014 FBO #4649
MODIFICATION

Z -- Kootenai National Forest--Libby Ranger District NFSR 471 and 600 Culvert Replacements - Solicitation 1

Notice Date
8/15/2014
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
 
ZIP Code
83815-8363
 
Solicitation Number
AG-02RC-S-14-0155
 
Archive Date
10/10/2014
 
Point of Contact
Wendy K. Stephenson, Phone: 208-765-7468, Ken Wickward, Phone: 406-283-7527
 
E-Mail Address
wstephenson@fs.fed.us, kmwickward@fs.fed.us
(wstephenson@fs.fed.us, kmwickward@fs.fed.us)
 
Small Business Set-Aside
HUBZone
 
Description
Engineer's Plans (includes Maps), 9 pages Kootenai Special Food Storage Order, 6 pages Solicitation NFSR 471: Work will consist of removal and proper disposal of an existing wooden culvert at milepost 4.1 on Seventeen mile road, NFSR 471. Additionally, installation of a 48" CMP culvert with an alignment skewed to that of the alignment of the wood culvert is part of the work. The realigned culvert will discharge in a new location which will require excavator work to create a new channel and place rock to control grade as directed by the government. A dewatering plan will be required as the stream flows yearlong. The road surface will need to be repaired after earthwork is complete. Aggregate and Class 2 riprap for this project is government furnished at the 16 mile Pipe Creek pit approximately 6 miles from the project site. Class 4 riprap for this project is government furnished at the 4-Mile Pipe Creek pit approximately 17 miles from the project. NFSR 600: Work will consist of installation of a 57"x38" CMPA culvert. The culvert will discharge in an old channel that will require excavator work to stabilize the channel and place rock to control grade as directed by the government. A dewatering plan will be required as the stream flows yearlong. The road surface will need to be repaired after earthwork is complete. Aggregate and Class 2 riprap for this project is government furnished at the 16 mile Pipe Creek pit approximately 6 miles from the project site. Estimated Period of Performance: July 15-30, 2015. This project is estimated less than $25,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-14-0155/listing.html)
 
Place of Performance
Address: Libby Ranger District, 12557 Montana Highway 37, Libby, Montana, 59923, United States
Zip Code: 59923
 
Record
SN03467001-W 20140817/140815235323-08dfbb8f7bceeaacf2dbe6f62910a718 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.