Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 30, 2014 FBO #4662
MODIFICATION

66 -- Coordinate Measuring Machine (CMM) Upgrade - PD 14M-277A-DI Rev 1 dated 28 Aug 2014

Notice Date
8/28/2014
 
Notice Type
Modification/Amendment
 
NAICS
334515 — Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AFLCMC/WNMRP AFMETCAL, 813 Irving Wick Dr. W. Bldg 2, Heath, Ohio, 43056-6116, United States
 
ZIP Code
43056-6116
 
Solicitation Number
FA2263-14-Q-0024
 
Archive Date
9/30/2014
 
Point of Contact
Kathryn Vaccaro, Phone: 740-788-5078
 
E-Mail Address
kathryn.vaccaro@us.af.mil
(kathryn.vaccaro@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
Revised Purchase Description CLIN Structure has been changed as follows: CLIN 0001 Phase I - CMM Upgrade - Hardware and Software CLIN 0002 Phase I - Data IAW DD Form 1423, one (1) each COTS & SUM CLIN 1001 Phase II - CMM Upgrade Installation CLIN 1002 Phase II - CMM Upgrade Training CLIN 1003 Phase II - Travel - Installation and Training Responses due NLT 2:00 pm EST 2 Sep 2014. Purchase Description (PD) has been revised with 14M-227A-DI Rev 1 dated 28 Aug 2014. Changes to the PD are as follows: PD para 1.0 Added to end of paragraph: "This upgrade will be performed in two phases in order to minimize risk due to it being a research and development project. The first phase will include the procurement and delivery of software, hardware components, and manuals. The second phase will include the installation and training of the equipment from the first phase." PD para 4.3.1.2 Paragraph deleted as this is provided by AFMETCAL. PD para 5.9.1 changed to read " Software Maintenance and Warranty shall be provided for 1 year." PD para 5.9.2 Paragraph deleted as this is provided by AFMETCAL. PD para 8.0 Added: "The first phase will be delivered through a third party shipper." Added that the second sentence will occur during the second phase. Deleted last sentence of paragraph. PD para 10.0 Changed first sentence to: "Upon completion of installation, on-site training shall last at least 3 consecutive 8 hour working days." PD para 11.0 Added "AFMETCAL" will perform the inspection and acceptation. AFMETCAL will be using test equipment having second echelon certification.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/AFMETCAL/FA2263-14-Q-0024/listing.html)
 
Record
SN03486687-W 20140830/140829022946-9b9d48b9ada415bb15e876a464c59135 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.