AWARD
10 -- Grand Prairie Pumping Station Superstructure and Installation of Equipment (Base Bid)and Installation of Discharge Pipe Station 13+50 to 22+00 (Optional Work) on the White River near De Valls Bluff, Prairie County, Arkansas.
- Notice Date
- 9/15/2014
- Notice Type
- Award Notice
- NAICS
- 237110
— Water and Sewer Line and Related Structures Construction
- Contracting Office
- USACE District, Memphis, 167 North Main Street, Rm B202, Memphis, TN 38103-1894
- ZIP Code
- 38103-1894
- Solicitation Number
- W912EQ-14-B-0010
- Response Due
- 8/15/2014
- Archive Date
- 10/15/2014
- Point of Contact
- Estella Blackman, (901) 544-0768
- E-Mail Address
-
USACE District, Memphis
(estella.c.blackman@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912EQ-14-C-0028
- Award Date
- 9/15/2014
- Awardee
- HUFFMAN CONSTRUCTION, LLC (003980702) <br> 1450 ROWE PKWY <br> POPLAR BLUFF, MO 63901-1518
- Award Amount
- $25,414,000.00
- Line Number
- 0001 thru 0027 & 1001 thru 1016
- Description
- The work consists of furnishing all plant, labor, and materials necessary for Grand Prairie Pumping Station Superstructure and Installation of Equipment (Base Bid) and Installation of Discharge Pipe Station 13+50 to 22+00 (Optional Work) on the White River near DeValls Bluff, Prairie County, Arkansas. Base Bid: The work required under the base bid is the construction of the superstructure above elevation 190.0 including unwatering, dewatering, demolition and transport of existing covers, equipment installation, discharge header and pipeline installation to pipeline sta. 13+50, dewatering system shutdown, deconstruction of existing fences and gates, excavation of the inlet channel, removal of existing cofferdam, excavated materials embankment, waterline and sanitary sewer system installation, aggregate surfacing, permanent access road installation, permanent fencing/gate installation, site cleanup, all as described in specifications and drawings entitled quote mark superstructure and installation of equipment quote mark, after which time the contractor will be directed to execute a controlled shutdown and water tightness test with the gates closed. All earthened areas shall be sloped to drain, fertilized and seeded. Option: the work required under the option is complete installation of 2-10 ft id steel pipes from pipeline station 13+50 to station 22+00, including all earthwork as shown on the drawing set entitled quote mark Discharge Pipes from Pipeline Station13+50 to Station 22+00 quote mark, installation of surge tanks and accessories, installation of manways, fiberglass access to manways and hatches for access into the pipes, installation of impressed current cathodic protection system including protective bollards at the test stations. The rectifier will be located at pipeline station 60+00 installed under a previous contract. Construct the access road between pipeline station 22+00 and station 13+50,including all road side drainage for the work area covered under this option contract. Install the fiber optic system between pipeline station 22+00 and inlet channel station 11+98, to include the installation of stainless steel optical cable cabinets located at pipeline station 22+00 and inlet channel station 11+98, including splice enclosures, slack cable coils, reinforced concrete slab and the running of cable between the cabinets. Testing of the cathodic protection system is required. Testing of the fiber optic system is required. All disturbed areas within the right-of-way shall be fertilized and seeded.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA66/W912EQ-14-B-0010/listing.html)
- Record
- SN03511008-W 20140917/140915235306-e1ca53c9f6c3832d5300888277faad35 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)