Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 24, 2014 FBO #4687
SOLICITATION NOTICE

Y -- UT PRA ZION 12(1) & 14(1) Kolob Terrace Road

Notice Date
9/22/2014
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6814R00040
 
Point of Contact
Sheri Muehl, Phone: 7209633090, Jason Longshore, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
This project will consist of Rehabilitation and Resurfacing, on Kolob Terrace Road, in Zion National Park: Type of Construction: Minor Grading, drainage, subexcavation, reinforced soil slopes, aggregate base, pulverization, asphalt paving, erosion control, signing and striping. This project consists of schedule A and Schedule B: Schedule A includes minor grading, subexcavation, culvert replacement, rehabilitation and resurfacing of 5.80 miles of Kolob Terrace Road; Schedule B extends the drainage, grading, and pavement resurfacing of Kolob Terrace Rd for a total of 9.82 miles; Significant Items Include 34,100 LF of silt fence, removal of 18 pipes 8300 CY of excavation; 8300 cuyd of subexcavation; 11000 cuyd of waste; 2340 cuyd of riprap; 7000 sqft of reinforced soil slope; 141,000 sqyd of pulverization; 3600 tons of Aggregate Base Course; 34,000 tons of superpave asphalt paving, 1825 LF of pipe culvert placement; 500 lnft of underdrain; 9800 lnft of asphalt curb, 6500 sqyd of paved ditch; 5 stone masonry headwalls; 370 sqft of signs; 900 gallons of pavement markings; 4800 flagger hours; 1200 pilot car hours; and 24 weeks of traffic and safety supervisor. This project is in an environmentally sensitive corridor, with narrow construction limits, and includes high altitude paving on steep grades. The north (upper) section of the project is typically closed due to heavy snow until late May. The project will require considerable scheduling, coordination, and construction phasing to complete the work within the time restrictions related to pulverization limitations, development of the asphalt mix design, asphalt paving, obtaining county hauling permits, and weather limitations at high elevation. The contract will be advertised and evaluated using the Lowest Price Technically Acceptable (LPTA) source selection method. The contractor will be required to submit qualifications indicating that they have completed projects of similar complexity with acceptable quality and positive client references. It is anticipated this project will be advertised in October, 2014 with construction beginning in February 2015 and extending through October 2015. Estimated cost for the schedule is $8,000,000 to $10,500,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6814R00040/listing.html)
 
Place of Performance
Address: Zion National Park, Washington County, Utah, Saint George, Utah, 84767, United States
Zip Code: 84767
 
Record
SN03522346-W 20140924/140922235707-7db675dc35e042ee07dc9fa0759eaac3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.