Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 09, 2014 FBO #4702
SOLICITATION NOTICE

R -- Civil Support Team Collective Training Events

Notice Date
10/7/2014
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
611699 — All Other Miscellaneous Schools and Instruction
 
Contracting Office
USPFO for Alaska, P.O. Box B, Camp Denali, Fort Richardson, AK 99505-2610
 
ZIP Code
99505-2610
 
Solicitation Number
W91ZRU-15-T-0001
 
Response Due
10/14/2014
 
Archive Date
12/6/2014
 
Point of Contact
Lindsay Chvilicek, 907-428-6178
 
E-Mail Address
USPFO for Alaska
(lindsay.m.chvilicek.mil@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. Performance Work Statement For 196th IN BDE FY15 Civil Support Team (CST)Collective Training Events (CTEs) 1.0 Objective: The objective of the task is to assist and execute 36 hour, full scale, Chemical/Biological/Radiological Weapons of Mass Destruction Collective Training exercises in Hawaii. Exercises will create an environment to facilitate the accurate assessment of the twelve National Guard Mission Essential Tasks outlined in the DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks dated May 09. These exercises will also involve the 93d (HI), 94th (GU), 103rd CST (AK), as well as other to be named mainland CSTs and the HI-CERFP. 2.0 Specific Tasks: The contractor will provide the necessary personnel, labor, materials, supplies, and equipment as indicated below to perform the tasks outlined: 2.1 Scenario Development-The CTEs will not only measure the training and readiness level of the team in accordance with DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks, but will also reinforce interoperability, communications, and RIP/TOA procedures and aid in the development of standard operating guidelines (SOGs). The scenarios must include at least one (1) Chemical, one (1) Biological, and one (1) Radiological hazard that will allow each team to challenge all of their capabilities and equipment. The scenarios should be designed to aid in the identification of possible team shortcomings and weak areas; as well as to re-train those areas as necessary. It must also provide an environment ready for on-the-fly injects, as necessary, to ensure all of the DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks are completed to standard. Should any weak areas be found, the scenario should provide for immediate re-training in those areas. The scenario must provide the complexity and realism to represent an actual Weapons of Mass Destruction (WMD) event. Contractor provides realistic training aid, devices, and simulators that properly stimulate current CST detection and analytical equipment enabling the CST to make sophisticated assessments and decisions. Realism and technical exactitude are crucial for all training aid, devices, simulators, and locations. The full scenario should provide for one complete and continuous demanding day of training not to exceed 36 hours. 2.2 Scenario Staffing- The contractor will provide experienced and certified staff to create target sites that replicate chemical and biological laboratory production, radiological and explosives manufacturing labs, and act as role players in the scenario. The minimal roles include Incident Commander (IC), FBI or local law enforcement, Explosives Ordnance Disposal (EOD), Safety Officer, Staging Officer, and Medical reach back. All staff must have a full understanding of the Incident Command System (ICS) and their role in WMD event. Since staff will be playing the roles of trained Hazardous Materials (HAZMAT) professionals and reacting to the decisions of the CST, they must be fully trained in HAZMAT operations to the level of quote mark Technician quote mark in accordance with National Fire Protection Association (NFPA) 472. As these exercises are to assist in SOG construction and implementation, as well as reinforce Training and Evaluation Tasks enforced at a national certification level, prior participation in at least three (3) national level training exercises is vital to plenary understanding of the training requirements. All staff must be well versed in CST Operations and all governing regulations to supplement the training and reinforcement of standard CST operating principals during the exercise. The contractor will have a licensed heavy equipment operator available for target site adjustments (see 3.1 and 3.2 below) 3.0 Place of Performance. The contractor ensures locations/buildings meet the requirements for target location, vehicle footprint, communications equipment, egress, and functioning utilities (electricity, water supply) in accordance with the DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks dated May 09, ATP 3-11.46 dated May 14, and unit Standard Operating Guidelines (SOG). 3.1 Target Site. The contractor will prepare the target sites as necessary to enhance the realism of the scenario. All heavy equipment, furniture, decorations, props, chemical toilets with servicing etc. will be provided by the contractor. 3.2 Site Adjustments. Any necessary adjustments to the site (to include major building construction, inoperable vehicle placement, demolition, fabrications) will be made by the contractor. In addition, if any adjustments are deemed necessary by 196th IN BDE, the contractor shall make the changes. At the conclusion of the exercise, the contractor will return the site to its previous state. All clean-up will be done by the contractor. 4.0 Period of Performance. It is estimated that ten (10) days will be needed to complete the task with seven (7) days for preparation of elaborate chemical, biological, radiological, and explosives labs, two (2) days for execution, and one (1) day for clean-up. 5.0 Reporting Requirements and Deliverables: Contractor will provide the following deliverables: 5.1 Refined Scenario Summary. The contractor will provide copies of refined scenario summaries for each exercise to 196th IN BDE CST/CERFP Training and Readiness Division no later than 5 days prior to the exercises execution. 5.2 Master Scenario Events List (MSEL). The contractor will provide the 196th IN BDE CST/CERFP Training and Readiness Division a draft of the MSEL no later than 3 days prior to exercises execution. As revisions are made, updated copies will be provided to the 196th IN BDE CST/CERFP Training and Readiness Division. 5.3 After Action Review (AAR). The contractor will provide detailed after action reviews of the exercises to include any deficiencies noted as they pertain to the DTMS CATS WMD-CST Mission Essential Tasks and/or SOG within 7 days after execution. Any major deficiencies will be noted and provided immediately the day after execution. 5.4 Task Deliverable Schedule Table. Deliverable Schedule Exercise Scenario Summary - Requirement Reference 5.1 - Due 5 days prior to exercise execution MSEL - Requirement Reference 5.2 - Due 3 days prior to exercise execution AAR - Requirement Reference 5.3 - Due 1 day after execution/7days after execution 6.0 Government Furnished Information/Equipment. The Government will provide all training facilities/classrooms required outside of the scenario. 7.0 Contractor Manpower Reporting Statement The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address quote mark https://contractormanpower.army.pentagon.mil quote mark. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractor); (6) Estimated direct labor dollars paid this reporting period (including sub-contractor); (7) Total payments (including subcontractor); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (10) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country, when in an overseas location, using standardized nomenclature provided on website); (11) Presence of deployment or contingency contract language, and, (12) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. 8.0 Special Provisions 8.1 Quality Control. A representative from the 196th IN BDE CST/CERFP Training and Readiness Division will oversee conduct of training and skills test to ensure effective and appropriate training is being conducted. 8.2 Performance Assessment. The WMD-CST teams participating will be accurately assessed based on the twelve National Guard Mission Essential Tasks outlined in the DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks dated May 09 in a Maritime environment to certify effective scenario development and facilitation by the contractors. 8.3 Hours of Operation: Normal Duty Hours. The contractors will prepare the target sites from 0800-1600 daily for seven (7) days and facilitate the exercise for no more than 36 continuous hours. 8.4 Contractor Employees. The contractor will determine the suitable number of contractors needed to prepare all target sites and facilitate the 36 hour exercise. 8.5 Special Qualifications. The contractors must have qualifications that enable them to construct a plausible WMD target site(s) and assess teams in accordance with DTMS CST CATS Tasks. (see 2.0, 2.1, and 2.2 above) 8.6 Security Requirements. Contractor personnel will not be required to obtain security clearances. However, all personnel involved must be able to obtain installation pass or be signed on by another member. 8.7 Identification of Employees. Identification of Employees will be at the discretion of the contractor. 8.8 Utilities. N/A. 9.0 Applicable Documents. N/A. 10.0 Technical Points of Contact. 196th IN BDE WMD-CST Training and Readiness Division Mr. Ray Toves, raymond.l.toves.civ@mail.mil, 808-542-6112, Director 196th IN BDE WMD-CST Training and Readiness Division Mr. Ray Toves, raymond.l.toves.civ@mail.mil, 808-542-6112, Director Solicitation #: W91ZRU-15-T-0001 Date Posted: 07OCT2014 Subject: Civil Support Team (CST) Exercises Closing Response Date: 14OCT2014 What: Collective Training Event When: 27-31OCT2014 Where: Waimano, Oahu Target: old hospital What: Training Proficiency Evaluation When: 17-21NOV2014 Where: Aloha Stadium in Aiea & residential area in Salt Lake, Oahu See SOW for additional details
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA51/W91ZRU-15-T-0001/listing.html)
 
Place of Performance
Address: Various Locations on Oahu See SOW for details Multiple HI
Zip Code: 96857
 
Record
SN03544421-W 20141009/141007234352-9a0b26e0ca4a90d02f3ad55acfce21f4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.