SOLICITATION NOTICE
J -- USCGC WAESCHE (WMSL 751) DRY DOCK & REPAIRS FY15 - RFP ATTACHMENTS
- Notice Date
- 12/19/2014
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- Department of Homeland Security, United States Coast Guard (USCG), USCG Surface Forces Logistics Center (SFLC) Procurement Branch 2, 1301 Clay St., Suite 807N, Oakland, California, 94612-5249, United States
- ZIP Code
- 94612-5249
- Solicitation Number
- HSCG85-15-R-P45282
- Point of Contact
- Wilma L. Estrada, Phone: 510.637.5981, Valerie S Rivera-Chase, Phone: (510) 637-5972
- E-Mail Address
-
Wilma.L.Estrada@uscg.mil, Valerie.S.RiveraChase@uscg.mil
(Wilma.L.Estrada@uscg.mil, Valerie.S.RiveraChase@uscg.mil)
- Small Business Set-Aside
- N/A
- Description
- ATTACHMENT 6 - Notice of Filing Protests ATTACHMENT 5 - Government Property Report ATTACHMENT 4 - Request for Clarification ATTACHMENT 3 - Continuation of Combined Synopsis/Solicitation ATTACHMENT 2 - Schedule of Supplies/Services ATTACHMENT 1 - Specifications This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in the notice. Solicitation number is HSCG85-15-R-P45282 is issued as a Request For Proposals (RFP). This announcement constitutes the only solicitation; proposals are being requested and a separate written solicitation will not be issued. This RFP incorporates provisions and clauses in effect through Federal Acquisition Circular 05-79. This is a total small business set aside. The NAICS Code is 336611 with a size standard of 1000 employees. The contract will be awarded on a firm, fixed-price basis, on an SF-1449. Only one award will be made to the responsive, responsible offeror under this solicitation. To receive an award, the Contractor must be registered in the System for Award Management (SAM) www.sam.gov. This requirement is for dry dock and repairs aboard USCGC WAESCHE (WMSL 751) consisting of items in accordance with the attached specification (ATTACHMENT 1). The period of performance will be from March 16, 2015 to May 11, 2015. GEOGRAPHIC RESTRICTION: There is a geographical restriction under this requirement which states that the place of performance will be at the Contractor's facility located only within the West Coast of the United States, including Alaska and Hawaii. QUESTIONS AND REQUEST FOR DRAWINGS: Drawings will be made available upon request by email and requests for clarification regarding this solicitation will be submitted via email to the Contracting Officer, Wilma Estrada at Wilma.L.Estrada@uscg.mil. Requests for clarifications are due no later than January 9, 2015 at 1:00 p.m. Pacific time. See ATTACHMENT 4, Request for Clarification. After this date and time, further requests may not be accepted due to time constraints. The Contractor shall furnish all the necessary labor, material services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dry docking repairs to the vessel, in accordance with the solicitation and attached specifications. Failure to read the specifications in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the offerors risk. All proposals submitted in response to this solicitation shall stand firm for 90 calendar days from the response date of this solicitation. Please provide the following information: 1. DUNS number 2. ATTACHMENT 2, Schedule of Supplies/Services. Please complete Items B.1 through B.4 of this attachment. Base Contract Line Item Numbers (CLINS) are marked as "D" for Definite. Optional CLINS are marked "O." 3. Welding certifications and procedures 4. Proof of Insurance (statement of coverage from current insurance carrier) 5. Dry dock certification current through date of performance, in accordance with SFLC Standard Specification 8634, Jan 2009. 6. Any issued amendments to the solicitation. 7. ATTACHMENT 3, Continuation of Combined Synopsis/Solicitation. Please review each page of this attachment thoroughly as it contains more proposal instructions and provisions which may contain blocks that must be completed. PROPOSAL DUE DATE: Proposals must arrive no later than 5:00 p.m., Pacific Time, on January 19, 2015. Proposals received after this date and time, will not be considered. Mailed and emailed proposals will be accepted. Faxed proposals will not be accepted. When submitting proposals by email, please submit the electronic copy to Wilma.L.Estrada@uscg.mil. All submissions shall include the solicitation number in the subject line of the email. PLEASE NOTE: PROPOSALS THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE CONSIDERED INCOMPLETE AND MAY NOT BE CONSIDERED. ANTICIPATED AWARD DATE: The contract is expected to be awarded on or about February 13, 2015. Work covered by this solicitation shall be completed within 56 calendar days from the date the vessel becomes available to the Contractor. An arrival conference will normally be held within 48 hours of the scheduled start date. Vessels being dry docked shall be in dry dock within seventy-two (72) hours of delivery. If a pre-docking shaft alignment is being performed, the vessel shall be dry docked within one-hundred and twenty (120) hours after arrival. ATTACHMENTS TO THIS NOTICE: ATTACHMENT 1 - Specifications ATTACHMENT 2 - Schedule of Supplies/Services ATTACHMENT 3 - Continuation of Combined Synopsis/Solicitation ATTACHMENT 4 - Request for Clarification ATTACHMENT 5 - Government Property Report ATTACHMENT 6 - Notice for Filing Agency Protests
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USCG/VPLMLCP/HSCG85-15-R-P45282/listing.html)
- Place of Performance
- Address: At Contractor's certified dry dock facility located only in the West Coast of the United States, including Alaska and Hawaii. The contractor must specify in the provision FAR 52.215-6 Place of Performance, the location of the facility where work is to be performed. If Contractor plans on using different shipyard, Contractor must state the location for the cutter will have the work performed. If this provision is not completed, the proposal may be considered non-responsive., United States
- Record
- SN03601319-W 20141221/141219234757-70202a8577699071dbc01bf3e8ce3cd9 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |