DOCUMENT

H -- 546-14-4-6590-0791;Triennial Testing of Electrical Distribution Systems; Engineering - Attachment

Notice Date
2/2/2015
 
Notice Type
Attachment
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of Veterans Affairs;Miami VA Healthcare System;1201 NW 16th Street;Miami FL 33125
 
ZIP Code
33125
 
Solicitation Number
VA24815Q0027
 
Response Due
2/6/2015
 
Archive Date
4/7/2015
 
Point of Contact
ROBERT GAMBLE
 
E-Mail Address
Robert.Gamble@va.gov
(Robert.Gamble@va.gov)
 
Small Business Set-Aside
N/A
 
Description
2. For section 4.5.8. it was discussed to perform primary current injection testing of all circuit breakers at 300% for time-current verification. The spec calls for the breakers to be tested at 3 multiples of relay tap current. Is it correct to say that the intent is to test the breakers at 300% only? No response. Follow SOW at this time. 3. Is there a breaker size cutoff for primary current testing. Industry standard is to test all breakers 400A and above. No response. Follow SOW at this time. 4. Section 4.5.9. states that an Infrared scan be performed on the electrical distribution system. Will this IR scan take place prior to the commencement of the PM in order to outline the problem areas and be able to perform any repairs as needed? Yes it can be done prior. 5. What size of 480-208Y120 dry-type transformers do you wish to have serviced in coordination with the PM? And are you intending on just the transformers in the rooms outlined in the spec to be serviced? Include all existing dry type transformer in all Buildings. This Information is on the One Lines drawings. 6. Request one-line drawings. Done. 7. Request coordination study for settings verification. Done. 8. It was noticed that a few of the transformers had a vacuum of about 1-2 psi which can be detrimental to the insulation of the transformer. Would you like us to add in the proposal the cost of placing a dry Nitrogen blanket of 1-2 psi of pressure on the transformers? "Add this item as a deduct option.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/MiVAMC/VAMCCO80220/VA24815Q0027/listing.html)
 
Document(s)
Attachment
 
File Name: VA248-15-Q-0027 VA248-15-Q-0027_2.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1843370&FileName=VA248-15-Q-0027-002.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1843370&FileName=VA248-15-Q-0027-002.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Department of Veterans Affairs;Miami VA Healthcare System;1201 NW 16th Street;Miami FL 33125
Zip Code: 33125
 
Record
SN03630448-W 20150204/150202234548-d0360728ec5dec97ddb0c06f904898a9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.