Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 21, 2015 FBO #4837
SOLICITATION NOTICE

Y -- FY15 Maintenance Dredging at Muskegon Harbor, MI - W911XK-15-B-00011 - Muskegon Plans - Muskegon Specs

Notice Date
2/19/2015
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Detroit, 477 Michigan Avenue, Detroit, Michigan, 48226, United States
 
ZIP Code
48226
 
Solicitation Number
W911XK-15-B-0011
 
Archive Date
4/8/2015
 
Point of Contact
L. Will Smith, Phone: (313) 226-2797
 
E-Mail Address
lloyd.w.smith@usace.army.mil
(lloyd.w.smith@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Muskegon Specs Muskegon Plans Invitation For Bids Mobilize dredge to Muskegon Harbor and dredge between the upstream and downstream limits shown on the plans. Deposit the dredged materials onto the shoreline placement site as follows: Beginning at a point 5000 ft.north of the north breakwater measured along the shoreline then extending 2000 ft northerly. The lakeward and landward limits of placement shall be the most landward 12.0 ft. depth contour and the ordinary high water mark elevation O.H.W.M.= 581.5 ft) respectively. The maximum elevation of placed materials shall not exceed +4.0 ft. above Low Water Datum (L.W.D). For materials that are placed lakeward of the 6.0 ft. depth contour, a clear depth of 4.0 ft. from the top of the placed materials to the water surface shall be maintained. Drainage shall be maintained lakeward across the placed materials at all times. The materials shall be placed in such a manner which will not block or interfere with natural or constructed drainage into the lake. During placement the Contractor shall minimize erosion of existing shoreline sediments. If shore ice is present during placement operations, dredged materials shall be placed directly upon the ice within the required limits. Demobilize when dredging work is completed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA35/W911XK-15-B-0011/listing.html)
 
Place of Performance
Address: Muskegon Harbor, Muskegon, Michigan, United States
 
Record
SN03646747-W 20150221/150219235817-ceed5bcf3b96df7456ca75fa28ee6ccb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.