Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 26, 2015 FBO #4842
SOURCES SOUGHT

Y -- East Campus Building 2 - Sources Sought Matrix

Notice Date
2/24/2015
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Baltimore, 10 South Howard Street, Baltimore, Maryland, 21203, United States
 
ZIP Code
21203
 
Solicitation Number
W912DR-15-S-0014
 
Archive Date
3/21/2015
 
Point of Contact
Melissa Renee McMillan-Cox, Phone: 4436547235
 
E-Mail Address
melissa.r.mcmillan-cox@usace.army.mil
(melissa.r.mcmillan-cox@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
This document is to be filled out and returned with responses to this notice. Responses are due no later than 12:00 p.m. eastern standard time 6 March 2015. This is a Sources Sought Notice and is for informational purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS. The U.S. Army Corps of Engineers, Baltimore District, requests letters of interest from POTENTIAL PRIME CONSTRUCTION CONTRACTORS concerning the potential project described below. Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions. NO SOLICITATION IS CURRENTLY AVAILABLE. Responses are to be sent via email to melissa.r.mcmillan-cox@usace.army.mil no later than 12:00 p.m. eastern standard time 6 March 2015. The project will be a Firm-Fixed Price Design-Build contract for the construction of the East Campus Building 2 (ECB2) located on Fort Meade, in Annapolis Junction, Maryland. In accordance with DFAR 236.204 - Disclosure of the magnitudes of construction projects, the magnitude of this project is over $500,000,000. The NAICS code for this solicitation will be 236220 with a standard size of $36.5 M. Project Description: The scope of this contract will include the design and construction of a new multi-story 826,114 square foot facility, a 1,121,000 square foot parking structure, a separate 72,268 square foot mechanical plant and an additional 500 spaces in a surface parking lot. The primary facility will be comprised of a multi-story structure with full basement. The facility includes open office areas and operations floor, analyst/planner collaboration areas, cafeteria and other operations. The construction will consist of core and shell structure and foundations; elevator conveyance systems; electrical/mechanical service and distribution components and systems; fire protection, alarm and suppression; information technology infrastructure, communications, and security systems support infrastructure; exterior finishes and weatherproofing. Interior build out will provide raised access floor systems, acoustically-rated interior partitions and ceiling, power, lighting, environmental control and communications. The primary facility is not a standard design. The entire structure will be built to Sensitive Compartmented Information Facility (SCIF) standards. The project includes redundant primary power and Uninterruptable Power Supply (UPS) systems to ensure continuity of operations. The project requires comprehensive interior design. The site infrastructure will include primary electrical services to the site, water, sewer, and telecommunications pathways. The supporting facility includes site preparation and infrastructure improvements, utility services, and perimeter security measures. Site preparation will include standard clearing, grubbing, cut, fill, grading and environmental protection structures. Additional site work consists of curb and gutter, walkways, patios and roads. Utility site construction will provide emergency backup power generation and cooling equipment. Perimeter security construction will extend existing perimeter fence line and surveillance capabilities. The facility will be required to be LEED Silver certifiable and comply with the Energy Policy Act of 2005 and the Energy Independence and Security Act of 2007. Low Impact Development will be included in the design and construction of this project as appropriate. The Contractor shall be required to perform all work in accordance with the access and security requirements of the facility. All personnel working on any project relating to this acquisition must be U.S. citizens. Interested PRIME CONTRACTORS ONLY should submit a narrative demonstrating their experience in Design- Build $500M or greater construction projects of a similar nature as described above. Your response should include the following information: details of similar projects, dates of construction, project references (including owner with phone number and email address), and project cost. Additionally, provide information on your SINGLE bonding capability. Narratives shall be no longer than FIVE pages. Email responses are required and should be submitted to Renee McMillan-Cox via melissa.r.mcmillan-cox@usace.army.mil. Comments will be shared with the Government and the project management and design team, but otherwise will be held in strict confidence.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA31/W912DR-15-S-0014/listing.html)
 
Place of Performance
Address: Fort Meade, Maryland, United States
 
Record
SN03650509-W 20150226/150224235514-b314208659d3613371da22931bf019c4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.