AWARD
Z -- Emergency Maintenance Dredging Projects at: U.S. Navy Submarine Base, Kings Bay, Camden County, Georgia (44 and 46-Foot Project) & Marine Corps Support Facility - Blount Island, Duval County, Florida (38-Foot Project)
- Notice Date
- 3/6/2015
- Notice Type
- Award Notice
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
- ZIP Code
- 32232-0019
- Solicitation Number
- GROUP2-10-R-J012
- Response Due
- 3/5/2015
- Archive Date
- 4/5/2015
- Point of Contact
- Tedra Nicole Thompson, 904-232-2016
- E-Mail Address
-
USACE District, Jacksonville
(tedra.n.thompson@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912EP-11-D-0012-0004
- Award Date
- 3/6/2015
- Awardee
- SOUTHERN DREDGING CO., INC. (052385267) <br> 925 WAPPOO RD STE C <br> CHARLESTON, SC 29407
- Award Amount
- $2,480,700.00
- Line Number
- 0001 - 0009
- Description
- This project consists of maintenance dredging of shoal material at two different locations; Kings Bay U.S. Navy Submarine Base - Inner Channel (KBIC) and Marine Corps Terminal (MCT) within the Marine Corps Facility on Blount Island (USMC-BI). The straight line distance between the two areas is approximately 28 miles and a waterway distance is approximately 45 nautical miles. The work is divided into a Base and six options. The first order of work for the Base is the KBIC Site Six Operating Area - South and the second order of work is MCT. All options pertain to KBIC. The base involves maintenance dredging of approximately 70,000 cubic yards at Site Six South with 45-foot required depth and approximately 205,000 cubic yards from Marine Corps Terminal at Blount Island Station 00+00 to Station 56+09.1 with 38-foot required depth. The dredged material will be placed in Disposal Mainside (D/A-M) and Dayson Island DMMA (D/A-D) respectively. The options involve maintenance dredging of approximately 1,200,000 cubic yards from Kings Bay Inner Channel. For the base and the five dredging options, this contract incorporates two feet of allowable overdepth throughout. Incidental Base work includes bird monitoring, turbidity and disposal monitoring, and standby time.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/GROUP2-10-R-J012/listing.html)
- Record
- SN03660204-W 20150308/150306234320-7c7b63115cc86c19481514e590665d82 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |