Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 12, 2015 FBO #4856
SOLICITATION NOTICE

Y -- Laguna Water Distribution System

Notice Date
3/10/2015
 
Notice Type
Presolicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-5 Southern Sierra Province, 1600 Tollhouse Road, Clovis, California, 93611
 
ZIP Code
93611
 
Solicitation Number
AG-9A40-S-15-0007
 
Archive Date
6/26/2015
 
Point of Contact
Patrick J. Gallegos, Phone: 559 297-0706 Ext. 4830
 
E-Mail Address
pgallegos@fs.fed.us
(pgallegos@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
This project is located on the Descanso Ranger District of the Cleveland National Forest. Work consists of the design and installation of a water distribution system, as follows: Electrical service, water treatment, pumping and delivery system, electrical control and remote monitoring system and the installation of a potable water tank, waterlines, electrical lines, a control system, road construction, and any other work necessary for the installation of a functioning potable water system. This Design-Build process will have two distinct phases. Phase 1 will be the pre-qualification process, where the Government will select up to three to four contractors on the basis of their qualifications and preliminary proposal(s). Only the selected contractors will then qualify for the Phase 2 process. In Phase 2 of the procurement procedure, Offerors will be given the opportunity to offer their preliminary design and/or technical approach and cost proposals. Final selection and basis for award of the Design-Build contract will be qualifications, past experience, technical quality, price, and other salient factors considered to be the best value to the Government. The best value approach provides the opportunity to select an offeror who is not necessarily the lowest priced or the highest technically-ranked. If awarded the contract, the Offeror shall provide and complete all necessary and required design and contraction documents, and complete construction in compliance with these requirements.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/9A40/AG-9A40-S-15-0007/listing.html)
 
Place of Performance
Address: Project Site: is located in San Diego County within the Mt. Laguna Recreation area. From San Diego, California, travel east on Interstate 8 for approximately 60 miles to Sunrise Highway (S1). Thence turn left on Sunrise Highway and travel northeast 5 miles to the second gated dirt road named Old County Road., United States
 
Record
SN03662786-W 20150312/150310235107-71b6c553916685c83da14564bb4a6723 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.