Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 13, 2015 FBO #4857
DOCUMENT

65 -- ARJO MAXISKY CEILING LIFTS - Attachment

Notice Date
3/11/2015
 
Notice Type
Attachment
 
NAICS
811219 — Other Electronic and Precision Equipment Repair and Maintenance
 
Contracting Office
Department of Veterans Affairs;James J. Peters VA Medical Center;Network Contracting Office 3 (10N3NCO);130 West Kingsbridge Road;Bronx NY 10468-3904
 
ZIP Code
10468-3904
 
Solicitation Number
VA24315Q0606
 
Response Due
3/16/2015
 
Archive Date
3/26/2015
 
Point of Contact
Dany Humphreys
 
Small Business Set-Aside
N/A
 
Description
STATEMENT OF WORK SERVICE CONTRACT: Full Service contract for the period of 4/01/2015 through 3/31/2016 for the following government owned equipment. REQUIREMENTS: A.Furnish all necessary labor, equipment, tools materials, repair service, software updates, parts, etc., for complete On-Site Maintenance Service as specified below in accordance with the terms, conditions and schedule of this agreement. B.Contract Extension: The Government will have the Option to extend the Term of the contract for Four (4) additional years at the prices you bid. This is in accordance with the provision of FAR 52.217-9 in Section - I "Contract Clauses" of this Solicitation. I.EQUIPMENT Equipment to be serviced/maintained includes: ARJO MAXISKY CEILING LIFTS (88 UNITS) Location at Manhattan VAMC: NURSING SERVICE II.DEFINITIONS/ACRONYMS: A.Biomedical Engineering - Chief or designee, at: Manhattan VAMC, 212-686-7500 ext. 7309 B.CO - Contracting Officer. C.COR - Contracting Officer Representative. D.PM - Preventive Maintenance Inspection. Services, which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with incidence of malfunction or inoperative conditions. E.FSE - Field Service Engineer. A person who is authorized by the contractor to perform maintenance (corrective and/or preventive) services on the VAMC premises. F.ESR - Vendor Engineering Service Report. A documentation of the services rendered for each incidence of work performance under the terms and conditions of the contract. G.Acceptance Signature - VA employee who indicates FSE demonstrated service conclusion/status and User has accepted work as complete/pending as stated in ESR. H.Authorization Signature - COR's signature; indicates COR accepts work status as stated in ESR. I.NFPA - National Fire Protection Association. J.CDRH - Center for Devices and Radiological Health. K.VAMC - Department of Veterans Affairs Medical Center. L.OSHA - Occupational Safety and Health Agency. M.OEM - Original Equipment Manufacturer. III.CONFORMANCE STANDARDS: Contract service shall ensure that the equipment functions in conformance with the latest published editions of NFPA-99, OSHA, CDRH, and [include performance standards and specifications used when the Maxisky Ceiling Lift were procured by VA National, Acquisition Center and any upgrades/updates]. IV.HOURS OF COVERAGE: A.Normal business hours of coverage are [Monday through Friday], [8:00am - 4:30pm], excluding federal holidays. All service/repairs will be performed during the normal business hours of coverage unless requested and approved by the COR. B.Preventive maintenance will be performed [annually]. Preventive maintenance is to be performed inside normal business hours. Note: Hardware/software scheduled and performed inside normal hours of coverage at no additional charge to the Government (unless it would be detrimental to equipment up-time; to be determined by COR). C.Federal Holidays observed by the VAMC are: New Years Day Labor Day Martin Luther King Day Columbus Day President's Day Veterans Day Memorial Day Christmas Day Thanksgiving Day Independence Day And any other day specifically declared by the President of the United States to be a national holiday. IV.LABOR: A. Unlimited labor is included within the hours of coverage noted above. V.REPAIRS: A.The contractor shall maintain the equipment in accordance with the Conformance Standards Section, by furnishing all necessary labor, unlimited technical phone support, equipment, tools, materials, repair service, shipping charges and all peripherals. Equipment repairs/service as specified in Section C, in Section C, I, Equipment, software updates and parts for service in accordance with the terms, conditions and schedule of this agreement. The contractor will provide repair service which may consist of calibration, cleaning, oiling, adjusting, replacing parts and maintaining the equipment, including all intervening calls necessary between regular services calibrations. B.Only, the CO, COR or designated alternate has the authority to approve/ request a service call from the contractor. C.Response Time: Contractor's FSE must respond with a phone call to the COR and his/her designee within [one (1) hour] after receipt of telephoned notification [24 hours per day]. If the problem can not be corrected by phone, the FSE will commence work (on-site physical response) within [four (4) hours] after receipt of notification or completion of phone support, and will proceed progressively to completion without undue delay. Except when outside hours of coverage is authorized by the COR. D.Repair Up-Time: From the time when the FSE commences the on-site unscheduled maintenance, the repairs/service must be completed within are 24 hours (24 hours/day). VI.SCHEDULED MAINTENANCE: A.The contractor shall perform Preventive Maintenance (PM) service to ensure that equipment listed in the schedule performs in accordance with Section C, III, Conformance Standards. The contractor shall make thorough technical inspections of the equipment covered in the Schedule. Within ten (10) days after the award of the contract, the contractor shall submit a schedule of PMs and a PM checklist describing in detail the scheduled maintenance procedures for inspecting each piece of equipment listed. This checklist is subject to the approval of the COR. The contractor shall provide and utilize these procedures and checklists with worksheet originals indicating the work performed and actual values obtained (as applicable) provided to the COR at the completion of the PM. All equipment listed under Section C, I, Equipment, will have PM service performed annually. PM services shall include, but need no be limited to, the following: 1.Cleaning of equipment. 2.Reviewing operating system software diagnostics to ensure that system is operating to the manufacturer's specifications. 3.Calibrating and lubricating the equipment. 4.Performing remedial maintenance of non-emergent nature. 5.Test and replacing faulty and worn parts and/or parts which are likely to become faulty, fail or become worn. 6.Adjusting and calibrating as necessary. 7.Inspecting electrical wiring and cables for wear and fraying. 8.Inspecting all mechanical components including, but not limited to patient restraints and support devices, chains, belts, bearing and tracks, interlocks, clutches, motors, mechanical integrity, safety, and performance. 9.Performing Electrical Safety Inspections, which should include line cord ground wire resistance and leakage as specified in the Conformance Standards. 10.Returning the equipment to the operating condition defined in Section C, III, Conformance Standards. B.PM services shall be performed in accordance with, and during the hours defined in, the Preventive Maintenance schedule established herein. All exceptions to the PM schedule shall be arranged and approved in advance with the COR. C.All parts, services, manuals, tools, or software required to successfully complete scheduled PM are included within this contract, and its agreed upon price, unless specifically stated in writing otherwise. D.Upon completion of the preventive maintenance and electrical safety inspection, the FSE must tag the equipment with the appropriate labels used by each facility, if required by the facility. The FSE must fill-in label sections for: date inspection, date next due, and initials of FSE. Labels will be provided to the FSE when reporting (signing-in) to Biomedical Engineering. VII.PARTS: The contractor shall furnish and replace parts to meet the repair up-time requirements as stated in Section C, V, Unscheduled Maintenance, D, Repair Up-time. If parts cannot be furnished by this time, the COR must be notified. The contractor has ready access to unique and/or high mortality replacement parts. All parts supplied shall be compatible with existing equipment. New parts shall be furnished by the contractor and guaranteed against defects and/or failure for a period of 1 year from of completion installation of the component. VIII.SERVICE/REPAIR: The contractor shall maintain all of the equipment listed in Section C, I, Equipments. In the event that an equipment needs service/repair, the contractor's FSE must respond with a phone call to the COR and his/her designee within [one(1)hour] after receipt of telephoned notification [24 hours per day]. If the problem can not be corrected by phone, the FSE will commence work (on-site physical response) to identify and help eliminate any problems, within [eight (8) hours] after receipt of notification or completion of phone support, and will proceed progressively to completion without undue delay. IX.SERVICE MANUALS: The VAMC shall not provide service manuals or service diagnostic software to the contractor. They shall obtain, have on file, and make available to its FSE's all operational and technical documentation, (such as; operational and service manuals, schematics, and parts list), which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request. X.DOCUMENTATION/REPORTS: The documentation will include legible detailed descriptions of the scheduled and unscheduled maintenance procedures performed, including replaced parts and prices (for outside normal working hour service) required to maintain the equipment in accordance with conformance standards. Such documentation shall meet the guidelines as set forth in the Conformance Standards Section. In addition, each ESR must as a minimum document the following data legibly and in complete detail: A.Name of Contractor. B.Name of FSE who performed services. C.Contractor Service ESR Number/Log Number. D.Date, Time (starting and ending), Equipment Downtime and Hours-On-Site for service call. E.VA PO#(s) covering the call, if outside normal working hours. F.Description of Problem Reported by COR/User. G.Identification of Equipment to be serviced: INV. ID#, Manufacturer's Name, Device Name, Model #, Serial #, and any other Manufacturers identification numbers. H.Itemized Description of Service Performed (including Cost associated with after normal working hour services), including: Labor and Travel, Parts (with parts #) and Materials and Circuit Location of problem/corrective action. I.Total Cost to be billed. J.Signatures: 1.FSE performing services described. 2.A Employee who witnessed service described. K.Equipment downtime Note: ANY ADDITIONAL CHARGES CLAIMED MUST BE APPROVED BY THE COR BEFORE SERVICE IS COMPLETED! XI.REPORTING REQUIREMENTS: A.The contractor shall be required to report to Biomedical Engineering and/or Nursing Service to log in. This check in is mandatory, and each facility will designate the appropriate area to report to. When the service is completed, the FSE shall document services rendered on a legible ESR(s). The FSE shall be required to log out with and submit the ESR(s) to Biomedical Engineering and/or Nursing Service. All ESRs shall be submitted to the equipment user for an "acceptance signature" and to the COR for an "authorization signature". If the COR is unavailable, a signed authorized copy of the ESR will be sent to COR by the contractor after the work can be reviewed (if requested or noted on the ESR). B.The contractor is totally responsible for providing Service and Preventive Maintenance reports directly to the COR. XII.PAYMENT: A.Purchase Order Payment Procedures: Payments will be made monthly in arrears upon receipt of properly prepared invoices which must show reference to the correct purchase order number issued upon the award of this contract. Each invoice must be provided in [triplicate] and must include the Service Reports (ESR's) for work performed during that period. B.Payment Procedures: Invoices must then be mailed to the corresponding VAMC the charge is applied to. Each invoice must be provided in [triplicate] and must include the Service Reports (ESR's) for work performed. Invoices must show reference to the correct purchase order number and contract number issued upon the award of this contract. If there are any deductions to be made, or a credit card charge in was made in error, a credit will be due of the correct amount for the monthly payment in question. Notification of the credit, is to be made in writing for any adjustments that were made and then mailed to the corresponding VAMC. XIII.ADDITIONAL CHARGES: There will be no additional charge to the Government for time spent at the site during, or after the normal hours of coverage awaiting the arrival of additional FSE and/or delivery of parts. XIV.REPORTING REQUIRED SERVICES BEYOND THE CONTRACT SCOPE: The Contractor shall immediately, but not later than 24 consecutive hours after discovery notify the COR, (in writing), of the existence or the development of any defects in, or repairs required to the scheduled equipment which the Contractor considers he/she is not responsible for under the terms of the contract. The contractor shall furnish the CO and COR with a written estimate of the cost to make necessary repairs. XV.QUALIFICATIONS: Offers will be considered only from offerors who are established in the business called for and whom in the judgment of the Contracting Officer (CO) are financially responsible and able to show evidence of their reliability, ability, experience, equipment, facilities and personnel directly employed or supervised by them to render prompt and satisfactory service. All contractor employees and subcontractors under this contract or order are required to complete VA's Information Security and Privacy combined Awareness Training Course annually. Contractors must provide signed certifications of completion to the COR during each year of the contract. This requirement is in addition to any other training that may be required of the contractor and subcontractor(s). XVI.CONDITION OF EQUIPMENT The contractor accepts responsibility for the equipment described in Section C, I, in "as is" condition. Failure to inspect the equipment prior to contract award will not relieve the contractor from performance of the requirements of this contract. XVII.COMPETENCY OF PERSONNEL SERVICES EQUIPMENT: A.Each respondent must have an established business, with an office and full time staff. The staff includes a "fully qualified" FSE and a "fully qualified" FSE who will serve as the backup. B."Fully Qualified" is based upon training and on experience in the field. For training, the FSE(s) has successfully completed a formalized training program, for the equipment comparable to that identified in the Section B schedule. For field experience, the FSE(s) has a minimum of three years of experience, with respect to scheduled and unscheduled preventive and remedial maintenance, on equipment comparable to the Ceiling Lift System, identified in Section B schedule. C.The FSEs shall be authorized by the contractor to perform the maintenance services. All work shall be performed by "Fully Qualified" competent FSEs. The contractor shall provide written assurance of the competency of their personnel and list of credentials of approved FSEs for each make and model the contractor services at the VAMC. The CO may authenticate the training requirements, request training certificates or credentials from the contractor at any time for any personnel who are servicing or installing any VAMC equipment. The CO and/or the COR specifically reserve the right to reject any of the contractor's personnel and refuse them permission to work on the VAMC equipment. D.If subcontractor(s) are used, they must be approved by the CO; the contractor shall submit any proposed change in subcontractor(s) to the CO for approval/disapproval. XVIII.TEST EQUIPMENT: Prior to commencement of work on this contract, the contractor shall provide the VAMC with copy of current calibration shall perform and provided on an annual basis. Test equipment calibration shall be traceable to national standard. XIX.IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS: The contractor's FSE's shall wear visible identification at all times while on the premises of the VAMC. Smoking is prohibited inside any buildings at the VAMC. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court. XX.INSURANCE A.Worker compensation and employee's liability. Contractors are required to comply with applicable Federal and State Worker Compensation and occupational disease statutes. B.General Liability. Contractors are required to have Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence. C.Property Damage Liability. Contractors are required to have Property Damage Liability insurance coverage of at least $500,000. Additional Requirements: Equipment Inspection Program shall include: "One Scheduled Annual Preventative Maintenance Inspection, coverage to include scales, DPS, load testing. oPerformance of one regularly scheduled maintenance inspection. Inspection coverage includes one maintenance inspection, which the company will determine to be appropriate based on condition and usage level of equipment oProvide an ArjoHuntleigh-trained representative to inspect, lubricate, clean and make ordinary adjustments and repairs to the equipment during each visit covered under the terms of the agreement. All technical work should result in performance and safety within the manufacturer's specifications for the equipment using manufacturer service literature recommendations. "Three unscheduled callbacks per unit (8AM-5PM- weekdays) oPerform unscheduled repairs (callbacks). Should additional (more than three) callbacks be requested, service shall be provided at preferred rates. "50% discount on all technician supplied/ordered authentic ArjoHuntleigh parts oFurnish authentic ArjoHuntleigh parts. The determination of when to replace parts is left to the Company representative's discretion. "Free labor for installation of any authentic ArjoHuntleigh parts during inspection and first three callbacks
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/BroVANAP/VAMD/VA24315Q0606/listing.html)
 
Document(s)
Attachment
 
File Name: VA243-15-Q-0606 VA243-15-Q-0606.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1910566&FileName=VA243-15-Q-0606-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=1910566&FileName=VA243-15-Q-0606-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: New York Campus;VA New York Harbor Healthcare System;423 East 23rd Street;New York, NY 10010
Zip Code: 10010
 
Record
SN03665030-W 20150313/150311235356-60d014ee94d8182ab943ad98b1cd623d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.