Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 20, 2015 FBO #4864
MODIFICATION

69 -- Army TADSS Maintenance Program (ATMP) DRAFT Requirements Documents

Notice Date
3/18/2015
 
Notice Type
Modification/Amendment
 
NAICS
541330 — Engineering Services
 
Contracting Office
PEO STRI Acquisition Center, 12350 Research Parkway, Orlando, FL 32826-3276
 
ZIP Code
32826-3276
 
Solicitation Number
W900KKATMP
 
Archive Date
3/17/2016
 
Point of Contact
Phil Davis, 407-384-5335
 
E-Mail Address
PEO STRI Acquisition Center
(phillip.b.davis16.civ@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
1. UPDATE: 18 March 2015. The purpose of this announcement is to post DRAFT requirements documents for the Army TADSS Maintenance Program (ATMP). DRAFT documents include the DRAFT (1) Performance Work Statement (PWS), (2) Appendix A, Device Descriptions, (3) Appendix B, Device Locations and Contractor Performance Factors (CPF), (4) Appendix C, Government Furnished Property (GFP), (5) Appendix D, Management Information System (MIS) Requirements, and (6) ATMP Draft Task Order List. These documents can be found by selecting the ADDITIONAL DOCUMENTATION link within this FedBizOPPs announcement. Note that Task Order specific draft PWSs will be released at a later date. BE ADVISED that these documents have not been fully vetted and approved through the PEO STRI Field Operations Directorate or the Army Contracting Command (ACC) - Orlando Division Chief. In addition, as discussed at the monthly Procurement Administrative Lead Time (PALT) Sessions, the ATMP Integrated Product Team (IPT) does not anticipate entering into PALT until 4th Quarter 2015. 2. The IPT has updated the ATMP Live Training Transformation (LT2) Portal (https://www.lt2portal.org/) Collaboration Area to include information that was not provided in the previous ATMP Federal Business Opportunities (FBO) Announcement posted 20 February 2015. The following files were added to the Collaboration Area. - Sustainable Range Program (SRP) work orders. - Maintained systems that do not have assigned device numbers. - Department of the Army Pamphlet 350-9 Index and Description of Army Training Devices 2002, 2010 and DRAFT 2015. - Details updated in README file. 3. The Government is in the process of developing the Acquisition Strategy and would like to obtain feedback from Industry regarding the length of the ATMP Period of Performance (PoP). The Government anticipates a minimum PoP of 5 years, however; the Government would like to hear from industry regarding which duration (e.g. 5, 6,7,8,9 or 10 years) would allow Industry and the Government to obtain maximum efficiencies and provide industry with the ability to recoup its initial investment required to perform all tasks necessary to prepare for full performance. Responses to this PoP question are requested to be provided to the ATMP Mailbox (usarmy.orlando.peo-stri.mbx.atmp@mail.mil) no later than Wednesday 25 March 2015. The Government requests that Industry provide a specific duration (e.g. 9 years), in lieu of a range (e.g. 7-10 years), with rationale to support its position. Information provided from industry will be utilized as one data point amongst other historical data and market research to assist our IPT in determining the appropriate duration for ATMP. 4. In addition to requesting feedback regarding the ATMP PoP, the Government is requesting feedback from industry regarding the posted DRAFT documents, as well as feedback regarding the information included in the ATMP LT2 Portal Collaboration Area. Specifically, there is a comment in the DRAFT PWS (Section 3.2.4) related to Beyond Economic Repair (BER). The current requirement states, quote mark the contractor's BER responsibility is limited to $35,000.00 USD per an individual TADSS hardware component. quote mark The Government is requesting feedback regarding potential impacts on a Contractor's pricing if this liability were eliminated. If eliminated, the Contractor would be responsible for all repairs regardless of component value. Again, please provide specifics if you choose to respond to this question. The Government requests that all questions, comments or suggestions for improvement for all information posted to LT2 Portal and FBO be provided to the ATMP mailbox usarmy.orlando.peo-stri.mbx.atmp@mail.mil by Friday 17 April 2015 at 4:00 P.M. This will NOT be industry's final chance to comment on the ATMP requirements. The Government anticipates conducting One-on-One sessions, Site Visits, as well as posting a Draft Request for Proposal (RFP) prior to issuing the Final RFP. At this time there are no formal dates established for One-on-Ones, Site Visits or release of the Draft RFP. However, these venues will afford Industry with additional opportunity to pose questions regarding the ATMP requirements. It is advised that industry continue to monitor FBO and attend monthly ACC Orlando/PEO STRI PALT sessions for ATMP acquisition updates. 5. DISCLAIMER: The information provided in this notice is subject to change and is not binding on the Government. This notice DOES NOT constitute an Invitation for Bids (IFB) or a Request for Proposal (RFP) and is not a commitment by the U.S. Government to procure subject services. No funds are available to pay for preparation of responses to this notification. No basis for a claim against the Government shall arise as a result from a response to this announcement.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/STRICOM/W900KK/W900KKATMP/listing.html)
 
Record
SN03671392-W 20150320/150318234743-300ed26b360a6ec5325a92587fa3ea4f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.