Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 29, 2015 FBO #4873
AWARD

Y -- Southeast Georgia/Fort Gordon SATOC

Notice Date
3/27/2015
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Savannah, Attn: CESAS-CT, 100 W. Oglethorpe Ave, Savannah, Georgia, 31402-0889, United States
 
ZIP Code
31402-0889
 
Solicitation Number
W912HN-15-D-0001
 
Archive Date
5/15/2015
 
Point of Contact
Melvin Sloan, Phone: 9126525162, Adrian Goolsby, Phone: 912.652.5289
 
E-Mail Address
melvin.o.sloan@usace.army.mil, adrian.e.goolsby@usace.army.mil
(melvin.o.sloan@usace.army.mil, adrian.e.goolsby@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912HN-15-D-0001
 
Award Date
3/25/2015
 
Awardee
Trend Construction Inc., 1826 N ALAFAYA TRL STE 100 <br />, <br />, Orlando, Florida 32826, United States
 
Award Amount
95,000,000.00
 
Description
Single Award Task Order Contract (SATOC) for General Construction and Design/Build Construction is intended to provide rapid response for: new construction, upgrades, maintenance or repair of situations relating, but not limited to, site work, interior/exterior finishes, architectural woodwork, electrical, mechanical, plumbing, structural and fire suppression system of Government facilities in a cost effective manner. Work requiring the use of civil funds is not allowed. Work may include, but not be limited to: 1.2. General Construction: 1.2.1. New construction, renovation, repair and/or upgrades of all permanent structures to include but not be limited to: interior/exterior finishes (floors, ceilings, doors, windows, paint, siding, etc.), architectural woodwork (molding, cabinets, etc.), electrical systems (conduit, wire, breakers, panels, transformers, emergency generators, interior/exterior high and low voltage electrical power lines, interior/exterior lights, emergency shut offs, lighting protection, etc.), mechanical systems (HVAC instrumentation & controls, HVAC control systems, commissioning, decommissioning, retro-commissioning, total building commissioning, gas lines, insulation, acoustical systems, underground high temperature lines, boilers, chillers & chilled water distribution systems, variable frequency controls on HVAC systems, etc.), plumbing systems (sanitary sewer, domestic water lines, backflow preventers, pumps, water coolers, etc.), fire suppression systems (fire alarm systems, sprinkler system, etc.), communication systems (mass notification system, IT lines, telephone & data lines, etc.), renewable energy systems (solar panels, ground source heat pumps, etc.), roofing systems (various roof types, gutters, downspouts, flashing, fascia, soffit, etc.), structural systems, fencing, gates, conduit and cables for security systems, Anti-Terrorism Force Protection systems (site layout, security design, building construction, threat development, level of protection, design constraints and communications, etc.) and the necessary appurtenances to consider the structure complete and usable. Other Construction: 1.3.1. New construction, renovation, repairs and/or upgrades of highways, roads, streets, airport runways, concrete aprons & pads, sidewalks, decorative pavers, athletic/recreational surfaces, landscaping & irrigations systems, seeding/sodding, detection loops, pedestrian bridges, highway bridges (bridges that do not span over major waterways), parking lots, traffic lines/markings/signs. Work can also include the following, but not be limited to: site preparation, earthwork, grading, excavation & filling, clearing & grubbing, surveying, traffic & signalization and traffic studies. Storm water management, storm drainage systems and erosion control. Incidental Work: 1.4.1. Work incidental to the tasks performed in any of the above paragraphs shall be include, but is not limited to demolition, carpentry, lighting, and similar minor electrical work that may be required to provide a complete, safe and usable facility during and after the course of roofing, mechanical, plumbing or painting services. 1.4.1.1. Damage such as ceiling replacement, painting and carpet cleaning as a result of roof leaks. 1.4.1.2. Lead, asbestos and mold remediation work incidental to renovation work. 1.4.1.3. Surface deterioration incidental to interior/exterior repairs such as patching drywall, replacing siding, trim work, etc. 1.4.1.4. Relocating furniture, workstations, etc incidental to construction. 1.4.1.5. Testing, reports and surveys associated with new construction, renovation, repairs and/or upgrades and additions to buildings (including lead and asbestos), structures, roads (including traffic/pedestrian patterns).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA21/Awards/W912HN-15-D-0001.html)
 
Record
SN03681325-W 20150329/150327234700-6ade244e386f69ccc28cfc00e47c281e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.