Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 11, 2015 FBO #4886
SOLICITATION NOTICE

Z -- Construction Manager as Constructor (CMc) for the Theodore Levin United States Courthouse Alteration Project - Pre-proposal Registration Notice

Notice Date
4/9/2015
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Property Development Division (5PE), General Services Administration, Public Buildings Service, 230 South Dearborn Street, Room 3600, Chicago, Illinois, 60604, United States
 
ZIP Code
60604
 
Solicitation Number
GS-05P-15-SA-C-0036
 
Point of Contact
Oana Sandru, Phone: 312-353-4001, Mazzolini C David, Phone: 312-353-0617
 
E-Mail Address
oana.sandru@gsa.gov, david.mazzolini@gsa.gov
(oana.sandru@gsa.gov, david.mazzolini@gsa.gov)
 
Small Business Set-Aside
N/A
 
Description
Pre-proposal Registration Notice - must be completed and submitted to the the Contracting Officer, Oana Sandru, at Oana.Sandru@gsa.gov. The General Services Administration (GSA), Great Lakes Region 5, announces an opportunity to provide Construction Manager as Constructor (CMc) services for the Alteration of the Theodore Levin U.S. Courthouse, located at 231 Lafayette, in Detroit, Michigan. The scope of CMc services under this proposed contract includes Design Phase Services and five (5) options for Construction Phase Services. These options include: Option 1 - FY14 Expedited Scope Package; Option 2 - FY14 Remaining Scope Package; Option 3 - FY15 Expedited Scope Package; Option 4 - FY15 Remaining Scope Package; and Option 5 - FY16 All Scope. The CMc will be competitively chosen using Source Selection (FAR 15) procedures. The objective of the Source Selection Process is to select a proposal that represents the best value to the Government. The award will be made to the responsible Offeror whose offer conforms to the solicitation and offers the best value to the Government, considering the technical factors and the evaluated price. For this procurement, the technical factors with be significantly more important than price (FAR 15.101-1, Trade Offs). The technical factors will include Experience in providing Design Phase Services and Construction Phase Services on similar projects; Project Management Plan/Approach; Qualifications and Experience of Key Personnel; Past Performance in providing Design Phase Services and Construction Phase Services on similar projects; and Project Labor Agreement. Additionally, Cost Accounting Standard (CAS) compliance shall represent a go/no-go factor. The Contractor must demonstrate their compliance with CAS through the submittal of all disclosures in accordance with FAR 52.230-1, Cost Accounting Standards Notice and Certifications and FAR 52.230-7, Proposal Disclosure - Cost Accounting Practice Changes. The Government reserves the right to make award on initial offers, but discussions may be held if appropriate. The estimated total construction cost for the project falls within the range of $90,000,000 to $120,000,000. The Design Phase Services is anticipated to commence upon award of the contract on or about July 31, 2015. The Optional Construction Phase Work is anticipated to be awarded on or about September 2015, with a performance period of approximately 1,474 calendar days. The performance periods for all five (5) options are anticipated to overlap at times. Project Summary: The project is based on the Theodore Levin U.S. Courthouse Major Building Systems Study, which took place in April 2013. The Levin U.S. Courthouse Prospectus project is an alteration project funded in three phases (FY14, FY15 and FY16) to correct serious building deficiencies of the historic courthouse which houses the Federal Courts for the Eastern District of Michigan. FY14 funding includes the replacement of chillers, addition of fire safety stair and freight elevator, and basement loading dock improvements. FY15 funding includes the replacement of the fire alarm, electrical distribution system and emergency generator, perimeter fan coils, passenger elevators, and extension of the fire sprinkler system. The FY16 funding includes replacement or repair of major HVAC components, including air handling units and fiberboard ductwork and upgrades to the building automation system, plumbing, and restrooms. For the FY16 work, temporary swing space will be constructed within the building for tenants to occupy while work is performed in their existing space. The CMc shall be a member of the project development team during the design and construction phases. The CMc selected for this project shall work along with the GSA and GSA's selected Architect and Engineer (A/E) firm, Commissioning Agent (CxA), and Construction Manager as Agent (CMa). The services requested of the CMc shall cover a wide range of design and construction activities, such as: constructability reviews, cost estimating, work phasing reviews, scheduling and general construction services. The CMc is at risk and is responsible for involvement in the project development and administration of the construction. Definition of Construction Manager as Constructor: A CMc contractor is defined as a firm engaged under direct contract to a building owner or client (in this case the GSA) to provide services such as design review, cost estimating, sustainability review, scheduling and general construction services. The services requested of the CMc shall cover a wide range of design and construction activities which are often performed by both Construction Managers (CMs) and General Contractors (GCs). In contrast to a CM that is not also a constructor; the CMc is at risk and is involved with project development and administration of the construction. The CMc shall be a member of the project development team during the design and construction phases, working with the A/E and the Government to ensure a quality project, within the mandated schedule and budget. The CMc contractor will perform services including, but not limited to: evaluating design concepts, monitoring A-E progress, coordinating design reviews, reviewing designs, reviewing and preparing cost estimates, controlling schedules, keeping records, reporting on design and construction progress, conducting Value Engineering (VE) exercises, conducting constructability reviews, constructing the facility at or below the Estimated Construction Cost at Award (ECCA), administering the construction contract and all subcontracts, coordinating construction meetings, CPM scheduling, monitoring construction costs and performing administrative and other services as defined in the scope of work to provide for a completely functional facility. There are two components of work to be performed under this Contract: Design Phase Services and Construction Phase Services. There are five (5) options for the Construction Phase Services. The Contractor is required to complete the Design Phase Services for the firm-fixed-price set forth in the Contract Price Schedule. If the Government exercises the option(s) for the Construction Phase Services, the contractor shall complete the Construction Phase Services at or below the Guaranteed Maximum Price (GMP). Joint Ventures: Joint venture or firm/ consultant arrangements will be considered and must submit an acceptable joint venture agreement. A draft solicitation package will be posted on or about Tuesday, April 14, 2015. The finalized solicitation package will be available on or about April 24, 2015. The solicitation package will only be available electronically. Potential Offerors will be responsible for downloading the solicitation from the FedBizOpps website, https://www.fbo.gov, and for monitoring for possible amendments and/or additional information. A pre-proposal conference and site-visit will be held on April 28, 2015, in Detroit, Michigan. Along with this synopsis a Pre-Proposal Registration Form is included, and anyone interested in attending the pre-proposal conference shall complete the form and submit it to the Contracting Officer, Oana Sandru, at Oana.Sandru@gsa.gov no later than Friday, April 24, 2015 at 4:30PM Central Daylight Time. Please note, the number of people attending, per company/team, will be limited to two individuals. We consider attendance at this conference vital to the preparation of a competitive and cost effective proposal and to understanding the total result desired by the Government. Failure to attend this meeting may not be used as an excuse for omissions and miscalculations in offers. The offers are due on or about May 27, 2015 at 1:00 pm. (Central Daylight Time). All responsible sources may submit a bid/proposal which shall be considered by the agency. In order to be eligible for award offerors are required to provide electronic representations and certifications in System for Award Management (SAM) accessed via https://www.acquisition.gov. An award is anticipated on or about July 31, 2015. Any questions regarding this notification should be directed to the Contracting Officer, Oana Sandru, at Oana.Sandru@gsa.gov.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/5PCI/GS-05P-15-SA-C-0036/listing.html)
 
Place of Performance
Address: Theodore Levin United States Courthouse, 231 West Lafayette Boulevard; Room 245, Detroit, Michigan, 48226, United States
Zip Code: 48226
 
Record
SN03694474-W 20150411/150409234751-90da9c4025391bb8e257e71ae1d71b58 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.