SOURCES SOUGHT
Z -- Houston Ship Channel, Placement Area 15 and Mid Bay Placement Area Shoreline Stabilization in Chambers County, Texas.
- Notice Date
- 4/10/2015
- Notice Type
- Sources Sought
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- USACE District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
- ZIP Code
- 76102-0300
- Solicitation Number
- W9126G-15-S-0024
- Response Due
- 4/20/2015
- Archive Date
- 6/9/2015
- Point of Contact
- Lucille Smith, 409 766-3845
- E-Mail Address
-
USACE District, Fort Worth
(lucille.r.smith@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- The U.S. Army Corps of Engineers, Galveston District has a requirement for the above subject. THIS IS A NOTICE FOR SOURCES SOUGHT ONLY. THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID. THERE IS NO BID PACKAGE, SOLICITATION, SPECIFICATION OR DRAWINGS AVAILABLE WITH THIS ANNOUNCEMENT. IT DOES NOT CONSTITUTE A PROCUREMENT COMMITMENT BY THE US ARMY CORPS OF ENGINEERS, IMPLIED OR OTHERWISE. NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT ANNOUNCEMENT. REPONSE IS STRICTLY VOLUNTARY; NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS. THE GOVERNMENT SHALL NOT BE LIABLE FOR OR SUFFER ANY CONSEQUENTIAL DAMAGES FOR ANY IMPROPER IDENTIFIED INFORAMTION. The purpose of this sources sought announcement is to gain knowledge of interested, capable, and all qualified small businesses including but not limited to Small Business, 8(a) Small Business Development Program, Service Disabled Veteran Owned Small Business, and Hubzone firms. The North American Industry Classification System (NAICS) Code 237990; Size Standard $36.5 million. To make appropriate acquisitions for the above project, the Government, will use responses to this sources sought announcement and possible future projects as determined to be in the best interest of the Government. The order of magnitude for this effort is estimated between $5,000,000 to $10,000,000. Project Information: This action requires the contractor to perform shoreline stabilization of along approximately 1,000 feet at Placement Area (PA) 15 and along 2,800 feet at Mid Bay PA in order to repair eroded areas. Approximately 43,656 tons of riprap and 15,380 tons of blanket stone will be required to repair eroded areas. Riprap will be approximately 42 quote mark stone between 210 and 3,565 pounds and blanket stone will be between quote mark and 200 pound stone. Contractors will first remove existing stone from eroded areas along Mid Bay PA and PA 15 and stockpile at specified area between PA's 14 and 15. A potential Option exists for disposal of rock removed from Mid Bay PA and PA15 at Marsh Cell M10 in lieu of stockpiling at specified area between PA's 14 and 15; however, rock already disposed of at stockpile location will not need to be relocated if option is exercised. Option for disposal of rock at Marsh Cell M10 will likely require contractor to dig access channels. Access channel(s) will have to be excavated mechanically (clamshell or bucket - no cutterhead dredge) and will need to be backfilled on completion of the work. Order of work will require erosion repair to be conducted at Mid Bay Placement Area first due to a Migratory bird window. No work allowed at Mid Bay PA between 3/1/16 and 8/31/16 unless cleared by US Army Corps of Engineers, Galveston District. Other Government Contractors will likely be onsite at Mid Bay PA conducting dewatering operations during the same time frame as the shoreline stabilization contract. As a result, Contractor for Shoreline Stabilization Job must keep his operations on the exterior of the levee and will not be allowed past inside the crown of the levee. Contractor will perform the majority of the work from the water and will encounter effects of ship wakes. The estimated award date for this project is July 28, 2015. The contractor will be required to provide Performance and Payment Bonds within (10) calendar days after award. The contractor shall begin work within (10) calendar days after acknowledgement of the notice to Proceed. Completion time for Schedule No. 1 is 210 calendar days. An additional 20 calendar days will be added if the option is exercised. If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government in the amount of $1,763.00 for each calendar day of delay until the work is completed or accepted. If you can meet all of the requirements for this project, please respond to this sources sought announcement by e-mail, to the attention of Lucille Smith, Office# (409) 766-3845, Email: lucille.r.smith@usace.army.mil. Responses must be received no later than 11:00 A.M. Central Standard Time, on April 20, 2015. The following information is requested: 1.Data Universal Numbering System (DUNS) & Commercial and Government Entity (CAGE) (This information can be obtained from your System for Award Management (SAM) Registration at www.sam.gov ). 2.Name of firm w/address, phone, fax, e-mail address, and point of contact. 3.State if your company is a Small Business, SBA Certified 8(a) firm, HubZone Small Business, or Service Disabled Veteran-Owned Small Business. 4.State whether your firm can provide a Bid Bond (20% of total bid amount), Performance and Payment Bond (100% of the contract amount). 5.Please indicate whether your firm will submit a bid for this project, if this project is set-aside for Small Business, 8(a), Hubzone Small Business, or Service Disabled Veteran-Owned Small Business. 6.Qualifications: Responses to this sources sought announcement shall indicate specialized experience and technical competence in: (a) Contractor must be experienced with excavation and installation of riprap and stone. The work on this contract will take place in an open-bay environment with an active deep-draft navigation channel adjacent to the project sites. Project sites are only accessible via water and barge and his equipment must be able to work from a barge, not land. Work will require removing existing failed riprap and replacing with new. Access channels may be required to facilitate work. (b) Provide documentation for your firm on past similar efforts as a prime contractor. (c) Provide a list of your present commitments and completion dates for these commitments. The evaluation will consider overall experience. 7.Submission Requirements: Firms submitting responses shall provide information on the most recent up to five projects that prove you can meet the qualification criteria listed above, with contract number, project location, description of work requirements, contact and phone number for each effort. Firms should also indicate all applicable personnel and sub-contractors proposed to work on the contract. Proof of Small Business Administration (SBA) registration 8(a) and Hubzone Small Business shall be provided with this response. Firms responding to this sources sought announcement, who fail to provide ALL of the required information requested, will not be used to help the Government make the acquisition decision, which is the intent of this sources sought announcement. For technical questions, please contact: Mr. Joshua Adekanbi at (409) 766-3174 or Mr. Clark Colquitt at (409) 766-3119.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G-15-S-0024/listing.html)
- Place of Performance
- Address: USACE District, Fort Worth PO Box 17300/819 Taylor Street, Fort Worth TX
- Zip Code: 76102-0300
- Zip Code: 76102-0300
- Record
- SN03696912-W 20150412/150410235244-3f5e17186031e45375acf8db0a225bfa (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |