SOURCES SOUGHT
S -- Electric Power Supply at Kyogamisaki Communication Site in Kyoto, Japan
- Notice Date
- 4/14/2015
- Notice Type
- Sources Sought
- NAICS
- 221122
— Electric Power Distribution
- Contracting Office
- Department of the Air Force, Pacific Air Forces, 374 CONS - Yokota, Unit 5228, Yokota AB, APO Japan, 96328-5228
- ZIP Code
- 96328-5228
- Solicitation Number
- FA5209-15-ELEC-KCS
- Archive Date
- 5/30/2015
- Point of Contact
- Kayoko Seta, Phone: 81-42-553-8549, Thomas L. Reese, Phone: 81-42-553-8549
- E-Mail Address
-
kayoko.seta.jp@us.af.mil, thomas.reese.2@us.af.mil
(kayoko.seta.jp@us.af.mil, thomas.reese.2@us.af.mil)
- Small Business Set-Aside
- N/A
- Description
- THIS IS A SOURCES SOUGHT NOTICE FOR INFORMATION ONLY. THIS IS NOT A REQUEST FOR QUOTATION OR AN ANNOUNCEMENT OF A SOLICITATION. The Government will not be responsible for any costs incurred by responding to this notice. Interested parties should send the requested information to Ms Kayoko Seta via email at: kayoko.seta.jp@us.af.mil by 15 May 2015. Required information: (1) Name and address of company (2) A point of contact with name, title, phone, and email (3) Cage code and DUNS number (if available) (4) Site(s) name you are interested (MSA, LSA or both sites) 374th Contracting Squadron, Yokota Air Base, Japan is seeking sources interested in providing commercial electric power at Kyogamisaki Communication Site (KCS) in Kyoto, Japan. The anticipated start date is 1 Mar 2017. Description of Requirement: •(1) SITE NAME: Mission Support Area (MSA) The contractor shall provide commercial power twenty four (24) hours a day, seven (7) days a week, to the meter point at KCS MSA. 6,600 volt, Non-dedicated, Three Phase, Three Wire, 60 hertz frequency power line Estimated Maximum Demand: 2,000 kW Estimated Average Consumption Usage: 1,000 kWh Estimated Annual Consumption: 8,780,000 kWh (This is a new requirement, no past consumption record exists.) •(2) SITE NAME: Line Support Area (LSA) The contractor shall provide commercial power twenty four (24) hours a day, seven (7) days a week, to the meter point at KCS LSA. 6,600 volt, Non-dedicated, Three Phase, Three Wire, 60 hertz frequency power line Estimated Maximum Demand: 700 kW Estimated Average Consumption Usage: 700 kWh Estimated Annual Consumption: 6,132,000 kWh (This is a new requirement, no past consumption record exists.) NOTE: THIS PROJECT WILL BE PERFORMED IN ITS ENTIRETY IN THE COUNTRY OF JAPAN. THE SUCCESSFUL OFFER MUST BE LICENSED AND REGISTERED TO PERFORM ELECTRICITY SUPPLY IN JAPAN.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/PAF/374CONS/FA5209-15-ELEC-KCS/listing.html)
- Place of Performance
- Address: Kyogamisaki Communication Site, Kyoto, Japan
- Record
- SN03698629-W 20150416/150414234854-dfefd23f93e0c904fa6b8d9341718c84 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |