Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 18, 2015 FBO #4893
MODIFICATION

C -- A-E IDIQ FOR BUILDER ASSESSMENT PROJECTS AT VARIOUS MARINE CORPS INSTALLATIONS WORLDWIDE

Notice Date
4/16/2015
 
Notice Type
Modification/Amendment
 
NAICS
541330 — Engineering Services
 
Contracting Office
N62473 NAVFAC SOUTHWEST, CAPITAL IMPROVEMENT CONTRACT CORE Attn Code RAQ20 1220 Pacific Highway San Diego, CA
 
ZIP Code
00000
 
Solicitation Number
N6247315R2416
 
Response Due
5/12/2015
 
Archive Date
5/27/2015
 
Point of Contact
Betty Kimes 619 532 4261 EMAIL: betty.kimes@navy.mil
 
E-Mail Address
betty.kimes@navy.mil
(betty.kimes@navy.mil)
 
Small Business Set-Aside
N/A
 
Description
Amendment 03 “ Dated April 16, 2015. The definition of COMPLETE PROJECT is amended to read as follows: COMPLETE PROJECT: Facility inventory and condition assessments (BUILDER, ICAP, etc.) and report detailing facility inventory and condition. Amendment 02 “ Dated April 16, 2015. The definition of COMPLETE PROJECT is revised as follows: Delete the sentence 100% BUILDER inventory/inspection data uploaded to BUILDER (Task order award Statement of Work) and accepted by client. And add the sentence facility inventory and condition assessments (BUILDER, ICAP, etc.) and report detailing facility inventory and condition. Amendment 01 “ Dated April 13, 2015. The following sentences are deleted from the second paragraph: Upon review of the sources sought analysis, the U.S. Small Business Administration (SBA) in San Diego determined that an unrestricted procurement is appropriate. The NAVFAC SW small business office concurs with the SBA determination. And the following sentences are added to the second paragraph: Upon review of the sources sought analysis, NAVFAC SW determined that an unrestricted procurement is appropriate. The NAVFAC SW small business office concurs with this determination. AMENDMENTS 01, 02 and 03 ARE INCORPORATED INTO THE NOTICE LISTED BELOW. N62473-15-R-2416 AE IDIQ THIS IS AN UNRESTRICTED PROCUREMENT. ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A STANDARD FORM (SF) 330, ARCHITECT-ENGINEER QUALIFICATIONS, IS CONTAINED HEREIN. THERE IS NO SEPARATE REQUEST FOR PROPOSAL (RFP) PACKAGE TO DOWNLOAD. THIS IS AN UNRESTRICTED PROCUREMENT. Sources sought notice and market research study was conducted by NAVFAC Southwest that included an assessment of relevant qualifications and capabilities of potentially qualified firms. Upon review of the sources sought analysis, NAVFAC SW determined that an unrestricted procurement is appropriate. The NAVFAC SW small business office concurs with this determination. Architect-Engineer (A-E) services are required for a firm fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for BUILDER Assessment Projects. Projects under this contract will occur at various Marine Corps installations Worldwide. Primary A-E services required: a. Condition assessments of facilities approximately 20 MSF and greater annually utilizing BUILDER, for each major building component system (e.g. roofing, HVAC, electrical, plumbing, superstructure, exterior/interior enclosures and finishes, etc.). b. BUILDER data input, data analysis and interpretation utilizing BUILDER Remote Entry Database (BRED) and web-based BUILDER. c. BUILDER assessor and management training. Secondary A-E services required in support of the Marine Corps Facilities Maintenance Management (FMM) Program may also include, but is not limited to: a. Other knowledge-based Sustainment Management System (SMS) facility assessments and training. b. Other Specialized Engineering assessments/studies for site facilities (e.g. roofs and structures). c. Conventional MO-322-type or deficiency-based facility assessments and training. d. Life-Cycle, Space Utilization and Functionality assessments, e. Construction, budget and parametric cost estimates. f. Short and Long Range Maintenance Planning (LRMP). g. Condition assessment Program Meetings. The maximum contract value may not exceed $30,000,000 aggregate total. The minimum guarantee for the contract is $5,000. The minimum guarantee for the entire contract term (including option years) will be satisfied by the award of the initial task order. The minimum value of individual task orders executed under this contract may be $1,000,000. The maximum value of individual task orders executed under this contract may be $8,000,000. There will be no dollar limit per year. Multiple task orders may be awarded with similar completion schedules and overlapping delivery dates. Contract term is for a one-year base period with four option periods. Each performance period will run 365 calendar days. The hourly rates will be negotiated for each performance period. The Government may exercise the option period unilaterally. Per NFAS 17.208-100(c)(1), options for PCAS may be negotiated on individual task orders for unilateral exercise. The estimated start date is September 2015. The NAICS Code for this procurement is 541330 (Engineering Services) and the annual small business size standard is $15 Million. The Government makes no representation as to the number of task orders or the actual amount of work to be ordered. The contractor is not guaranteed work in excess of the minimum guarantee. Firms that provided Architect-Engineer services for a task order issued under the resulting contract are prohibited from participating on the subsequent construction contract. This limitation also applies to subsidiaries/affiliates of the firm. SELECTION CRITERIA AND SUBMITTAL REQUIREMENTS: Selection of Architects and Engineers (formerly Brooks Architect-Engineer Act) (PL 92-582) and Federal Acquisition Regulations (FAR) Part 36.6 selection procedures apply. The evaluation and selection will be based on the following criteria: Criterion 1, Professional Qualifications; Criterion 2, Specialized Experience and Technical Competence; Criterion 3, Capacity; Criterion 4, Past Performance; Criterion 5, Location and Knowledge of the Locality; Criterion 6, Quality Control; Criterion 7, Utilization of Small Business, and Criterion 8, Volume of Work. Submitted SF330s (Architect-Engineer Qualifications) and related information will be evaluated to determine the most highly qualified firm based on criteria responses. Criteria 1 and 2 are considered most important and of equal importance to each other; Criteria 3, 4, 5, 6 and 7 are of lesser importance and listed in descending order of importance; and Criterion 8 is of lesser importance and will be used as a tiebreaker among firms considered to be technically equal. Evaluation of past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact, or valid phone numbers may result in a firm being considered less favorably in the evaluation. In evaluating an Offerors capability, the Government will consider how well the offeror complied with these instructions. All projects provided in the SF 330 shall have been completed by the office/branch/individual team member actually performing the work under this contract. Projects not performed by the office/branch/individual team member will be excluded from evaluation consideration. Submission Requirements: The SF330, Part 1 submission is limited to thirty (30), 8.5x11 pages (see definition). Information submitted beyond the stated page limitation, unless otherwise accepted, will not be considered in the evaluation. Submit one (1) original and two (2) copies of SF330 (Parts 1 and 2), addressing the selection criteria information below. Requested items not counted as part of the 30-page limitation are as noted herein. Also submit one electronic copy of the complete SF330 on CD (Adobe Acrobat.PDF format). SF330, Part 1, Sections B and C: In Block 5, in addition to the name of the firm, provide the firm ™s Data Universal Numbering System (DUNS) number issued by Dun and Bradstreet Information Services. In Block 9, in addition to the name of the firm, provide the DUNS number of each proposed team member. SF330, Part 1, Section D: Organization Chart: In addition to requirements stated in the SF330 Instructions (i.e., show names and roles of all proposed key personnel and firms they are associated with), identify on the submitted organization chart the relationships and lines of authority of the proposed team members, including key consultants and assessment/QC team structure. (Note: All individuals listed on the organization chart are not required to have a resume in Section E, such as administrative or lower level engineering positions.) This chart is not counted as part of the 30-page limitation. This chart must be affixed to the submittal to avoid separation in handling. SF330, Part 1, Section E, Resumes of Key Personnel, CRITERION 1, PROFESSIONAL QUALIFICATIONS: The evaluation will consider the professional qualifications of proposed key personnel (see definition) in providing relevant primary and secondary A-E services for project types required by this contract. All key personnel must be professionally registered/accredited (see definition) in their discipline. The designated Program Manager, Project Manager, Field Project Manager, Quality Control Manager (QCM) (see definitions) and lead for each technical discipline shall be a professional registered architect or engineer and be an employee of the prime A-E firm. Submission Requirements: Provide brief resumes of proposed key personnel who will specifically perform the relevant primary and secondary A-E services for relevant project types listed for this contract. Non-relevant information will not be considered. For each key personnel, indicate highest level of education achieved, number of years engaged in the discipline, and submit a copy of the applicable current professional registration/accreditation certificate (personnel with registration in multiple states need only submit a copy from one state). Certificate copies will not be counted in the 30-page limitation. Key personnel resumes shall include, but not be limited to, Program Manager, Project Manager, Field Project Manager, QCM and technical leads for the following disciplines (architects, civil, mechanical, and electrical engineers). Resumes of these individuals shall demonstrate their depth of experience in their respective roles, with emphasis on example projects presented in Section F. Each resume shall include maximum five (5) recently completed projects (see definitions) that best demonstrate the individuals qualifications in performing the relevant primary and secondary A-E services listed for this contract. Projects not meeting these requirements will not be considered. Submit only projects in which the key personnel performed a significant role. Submit a brief description of the project within SF330, Section E, Block 19. For each project describe: scope (including total area of building assessment performed) and cost; role and responsibilities of the key personnel; and the specific A-E services performed that are relevant to the primary and secondary services required by this contract. SF330, Part 1, Section F, Example Projects, CRITERION 2, SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE: The evaluation will consider specialized experience of the proposed team relative to the primary and secondary A-E services required by this contract. Projects completed by the prime A-E firm identified in Part I may be given more consideration in the evaluation process than projects of proposed subcontractors. Submission Requirements: Submit maximum ten (10) recently completed projects (see definitions), that best demonstrate the relevant experience of the proposed team in performing the primary and secondary A-E services for project types required by this contract. Projects shall have been performed by the office(s)/branch(es) identified in SF330, Part 1, Section C. Projects not meeting these requirements will not be considered. For government contracts, include the full contract number and task order number, if applicable. In SF330, Part 1, Section F, Block 24, submit a description of the project, including: 1) Type of project and its relevance to this contract; 2) Specific relevant A-E services performed; 3) total area of building assessment performed; 4) start and end date of project assessment period; and 5) A-E fee. For each firm noted in Block 25, FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT, state if the firm was the Prime or Subcontractor on the project. Firms with multiple offices shall indicate which office/branch performed the A-E services. Additional requirements: At least one (1) project shall demonstrate relevant experience as the prime contractor on a BUILDER assessment project with a minimum of 20 MSF assessed in a one year period. Note: A single project may satisfy more than one of the above minimum requirements. If the proposed team is a joint venture (JV), submit information for relevant projects completed by the JV entity. If the JV does not have shared experience, projects may be submitted for each of the JV partners. In any case do not exceed the ten (10) project limitation. In cases where the project was performed by a JV, but all JV partners are not on the team proposed for this contract, specifically describe the relevant work performed by the JV partner(s) teaming on this contract. In all cases, clearly describe the specific relevant work self-performed by the proposing firm and the firms roles and responsibilities on the project; do not include work that is not attributable to the proposing firm. If the project description does not clearly delineate the work performed by the entity/entities teaming on this contract, the project may not be considered. SF330, Part 1, Section G, Key Personnel Participation in Example Projects: Submit in accordance with the SF330 Instructions. From the total projects listed in Section F, provide maximum ten (10) projects. SF330, Part 1, Section H; Additional Information requested by Agency. Address the remaining Criteria 3 through 8; additional sheets may be used (up to the 30-page limitation), if required. See submission requirements. Clearly identify the Criterion number and title. CRITERION 3, CAPACITY: The evaluation will consider the Offerors capacity to accomplish the work in the required time. Submission Requirements: Submit a narrative that demonstrates the Offerors capacity to accomplish work in the required time frames. Describe: 1) Present workload and capability to integrate work under this contract with other commitments; 2) Capacity to accomplish multiple task orders simultaneously with overlapping delivery dates with no or minimal program disruption and cost impact to projects initiated; 3) Firms ability to obtain security clearance(s) for its key personnel and capability to provide qualified backup staffing for key personnel to ensure continuity of services and ability to surge to meet unexpected project demands. 4) Ability to concurrently perform and manage multiple complex projects in different locations, and to meet aggressive schedules. CRITERION 4, PAST PERFORMANCE: The evaluation will consider the Offerors past performance on relevant Government and/or commercial projects regarding quality of work, cost control, compliance with performance schedules, and customer satisfaction, with emphasis on example projects presented in Section F. The evaluation will be based on past performance assessments and other available past performance information. Points of contact provided in the proposal may be contacted. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation. Submission Requirements: Submit an A-E Contractor Appraisal Support System (ACASS), Contractor Performance Assessment Report System (CPARS), or a Past Performance Questionnaire (PPQ) evaluation for each project listed under Criterion 2. If a completed ACASS/CPARS evaluation is available, it shall be submitted with the completed SF330 package. If there is not a completed ACASS/CPARS evaluation, the PPQ included with this notice is provided for the Offeror or its team members to submit to the client for each project. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN AN ACASS/CPARS EVALUATION IS AVAILABLE. If an ACASS/CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF330. If the A-E is unable to obtain a completed PPQ from a client for a project before the response date set forth in this notice, the A-E should complete and submit with their response the first page of the PPQ (Attachment #1), including contract and client information for the respective projects. A-Es should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Governments point of contact, Naval Facilities Engineering Command Southwest, Code RAQ20.BK, Attn: Betty Kimes, via email at betty.kimes@navy.mil, prior to the response date. A-Es shall not incorporate by reference into their response ACASS/CPARS or PPQ evaluations previously submitted in response to other A-E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Submitted ACASS/CPARS and PPQ evaluations will not be counted as part of the 30 page limitation and shall be attached to the SF330, behind the SF330 Part II document. CRITERION 5, LOCATION AND KNOWLEDGE OF THE LOCALITY: The evaluation will consider the teams location, demonstrated knowledge of and project experience within the geographic areas where projects are anticipated for this contract. The preponderance of the work will be at Marine Corps installations in California, Arizona, Virginia, Georgia, North Carolina, South Carolina, Hawaii and Japan. Submission Requirements: Submit a narrative that demonstrates the teams knowledge of and project experience within the geographic locations for anticipated projects on this contract. Include: 1) Location of the Offerors main office and any branch offices and subconsultant offices that will be utilized for this contract; 2) Description of teams knowledge of, and project experience within, the targeted geographic areas; and 3) Description of teams availability and ability to ensure timely response to requests for onsite support. CRITERION 6, QUALITY CONTROL: The evaluation will consider the Offerors Quality Control (QC) program for ensuring technical accuracy of the A-Es BUILDER Field inventory/inspection data and BUILDER Data input. Firms that demonstrate a QC process that will provide increased confidence of accuracy of data collected and minimize the governments quality assurance (QA) effort in reviewing the A-Es work product may be considered more favorably in the evaluation. Submission Requirement: Submit a narrative that describes: 1) Offerors QC program that is used to ensure technical accuracy of the A-E ™s BUILDER Field inventory/inspection data and BUILDER Data input; 2) Process used for checking data for accuracy and consistency across multiple assessment teams, and correcting data when systemic issue or individual assessor error; 3) Describe process for tailoring BUILDER to promote consistency of data gathered by assessors. For offerors who are joint ventures and/or teams with offices in a variety of locations, describe how the QC effort will be implemented across the various team offices. Describe from which office the QC program will be managed/coordinated and the plan/methods to ensure effective QC and communication between offices. CRITERIA 7, UTILIZATION OF SMALL BUSINESS: (To be addressed by all firms, including small businesses). Utilization of small business concerns as subcontractors shall be evaluated. Firms that demonstrate a high level of utilization of small business in subcontractor roles work may be considered more favorably in the evaluation process. Submission Requirements: Submit a narrative that demonstrates commitment and use of small business concerns as subcontractors on this contract. Address the key elements by identifying and discussing: 1) Commitment to the following small business subcontracting goals: Small Business (SB) “ 66.80%; Small Disadvantaged Business “ 17.27%; Woman-Owned Small Business “ 15.30%; HUBZone Small Business “ 8.94%; and Service-Disabled Veteran-Owned Small Business/Veteran Owned Small Business “ 3.03%; 2) How the small business, listed as subcontractor in your SF330, will meet the subcontracting goal for each socio-economic category. Show subcontractor name, DUNS number, small business socio-economic category, and type of service to be perform in this contract. Note: Firms slated for an interview will be required to submit a subcontracting plan that reflects a minimum of the subcontracting goals and subcontractors stated above prior to the interview. CRITERION 8, VOLUME OF WORK: The evaluation will consider the volume of DoD work awarded to the prime A-E in the past 12 months with the objective of equitably distributing contracts among A-E firms, including minority-owned firms and firms without prior DoD contracts. Submission Requirements: Provide a list of DOD contracts/task orders (with contract dollar amount) of work awarded in the past 12 months to the firm identified as the Prime A-E on the submitted SF330. Joint venture (JV) entities should list awards to the JV and separately list awards to each JV partner for the time period. Do not include work performed as a subcontractor. Firms with multiple offices shall indicate which branch office completed each project. SELECTION INTERVIEW REQUIREMENTS: Personal interviews may be scheduled for firms slated as most highly qualified. Firms slated for interviews may be asked to explain or expand on information contained in their SF 330 submittal. Elaborate presentations are not desired. Note that joint ventures (JV) slated for interviews will be required to provide a copy of their JV Agreement prior to the interview. ADDITIONAL INFORMATION: All information must be included in the submitted SF 330 package (cover letter, attachments, and excess information beyond the 30-page limit, unless otherwise excepted, will not be considered in the evaluation). System for Award Management (SAM) Database: In accordance with FAR 52.204-7, System for Award Management Registration, ensure your firm has an active SAM entity record. SAM is a Federal Government owned and operated free web site that consolidates the capabilities of CCR (Central Contractor Registration), ORCA (Online Representations and Certifications Application), and EPLS (Excluded Parties List System). SAM is the primary Government repository for current and prospective federal awardee information. Please complete your SAM registration for the same name and address identified as the submitting office on your SF330, with its associated CAGE code and DUNS or DUNS+4. Registration instructions and information can be accessed from the SAM home page at: https://www.sam.gov. In accordance with the Selection of Architects and Engineers (formerly the Brooks Architect-Engineer Act), the A-E firm must be a registered/licensed architectural and/or engineering firm. Provide evidence that your firm, subcontractor or proposed team members are permitted by law to practice the profession of Architecture and/or Engineering, i.e., State registration number, a brief explanation of the firm ™s licensing in states that do not register firms, etc. Firms will be required to submit proof of required professional A-E registration/licensure prior to the interview phase of the selection process. This documentation is not counted as part of the 30-page limitation. A-E firms meeting the requirements described in this announcement are invited to submit a completed SF330 package per the submission requirements to the office shown below. The submittal package (original, plus 2 copies and 1 CD) shall be received in this office (NAVFAC Southwest, Attn: Betty Kimes, Code RAQ20.BK, 1220 Pacific Highway, San Diego, CA 92132) no later than, 2:00 P.M. Pacific Standard Time on May 12, 2015. Facsimile and emailed SF330 packages will not be accepted. Submittals received after this date and time will not be considered. READ THE FOLLOWING INFORMATION CAREFULLY. An Offeror risks the late receipt and rejection of their SF330 package when delivery is delayed until the last few minutes before the deadline. Offerors intending to deliver the SF330 package in-person are cautioned that the NAVFAC Southwest facility is located in downtown San Diego. It is recommended that the Offeror allow for delays driving through downtown San Diego caused by traffic (both freeway and downtown), train/trolley crossings, parking at the pay lots/meters near the facility, and gaining access to a secure Government facility. No parking or offloading of SF330s is available at the Government facility. SF330s shall be delivered to the mailroom in Building 128 and reasonable time shall be allowed for mailroom personnel to receive and time stamp the SF330. The stamp time is determined by the NAVFAC Southwest facility mailroom time stamp device only, not by any other time keeping device that the Offeror may use or own. Immediately upon proposal delivery, the Offeror shall leave the premises of the Government facility. An Offeror that does not leave the premises may be requested to leave or be escorted off the premises. THIS IS NOT A REQUEST FOR PROPOSAL. ALL INFORMATION NEEDED TO SUBMIT SF330 DOCUMENTS IS CONTAINED HEREIN. NO SOLICITATION PACKAGE, TECHNICAL INFORMATION, OR BIDDER/PLAN HOLDER LIST WILL BE ISSUED. It is the offerors responsibility to check the NAVFAC electronic solicitation website NECO (Navy Electronic Commerce Online) at: https://www.neco.navy.mil for any revisions to this announcement or other notices. Plan-holder list is available via the NECO website and an Interested Vendors List is available via the FedBizOpps website, www.fbo.gov, under this solicitation number. Address inquiries via email: betty.kimes@navy.mil or via telephone: 619-532-4261. *** END OF ANNOUNCEMENT *** DEFINITIONS OF TERMS: OFFEROR: Refers to the contractor submitting the proposal, including joint ventures, designated in Section C of Standard Form (SF) 330 (Architect-Engineer Qualifications) as the prime contractor. OFFERORS TEAM: Refers to the Offeror (see definition) and the other firm(s)/entity(ies) proposed to perform the work of the contract together as a team, as listed in the Offerors submitted SF330, Section C JOINT VENTURE (JV): A legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. FIRM: Any individual, firm, partnership, corporation, association, or other legal entity permitted by law to practice the professions of architecture or engineering. BRANCH OFFICE: An office of a firm located separately from a firms other office(s) and having a separate address. PAST PERFORMANCE: Relates to how well an Offeror has performed; e.g., the quality of work accomplished, cost control, schedule compliance, customer satisfaction. Past performance is distinct from experience RELEVANT or RELEVANT EXPERIENCE: Pertains to work performed by an Offeror, within the prescribed timeframe, which is the same or similar to the work that may be ordered under this contract in terms of size, scope, and complexity. Experience is distinct from past performance (how well an Offeror has performed). PROJECT OR SPECIFIC PROJECT; A single project contract or a single task order under an IDIQ or other multiple award type contract; with a single starting point and a single ending point. Combined projects (see definition) will not be considered. COMBINED PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, delivery orders, or multiple contracts combined in a single description. No credit will be given for work performed under IDIQ or other multiple-award type contracts in the aggregate (multiple projects completed under more than one task/delivery order). COMPLETE PROJECT: Facility inventory and condition assessments (BUILDER, ICAP, etc.) and report detailing facility inventory and condition. RECENT or FIVE-YEAR PERIOD: The prescribed timeframe for this solicitation that refers to the period of time for which projects may be submitted for consideration as relevant experience, relevant past performance, etc. The five-year period is calculated by counting back five years from the SF330 due date. PROFESSIONAL REGISTRATION/ACCREDITATION: Professional registration/license/ accreditation in one or more of the 50 United States and its territories. For the purposes of this procurement, Evidence-based design accreditations/certificates are not acceptable as professional credentials. KEY PERSONNEL: The personnel of the offerors team who are the registered/licensed/ accredited professionals in their respective disciplines, directly responsible for inventory/inspection and management of the relevant contract work. These are the individuals for which resumes are being submitted. PROGRAM MANAGER: The individual who is responsible for overall management of the A-E IDIQ contract. This individual shall be an employee of the prime A-E firm. This position is distinct from that of individuals who are responsible for managing individual task orders/projects under the IDIQ contract or special programs. QUALITY CONTROL MANAGER (QCM): The individual who is responsible for management of the quality control program for the A-E IDIQ contract. The QCM shall be a registered/licensed architect or engineer with minimum five (5) years of building assessment experience. SELF-PERFORM: Refers to performing relevant architectural-engineering work in-house without subconsultants/subcontractors. Relevant work is that which is the same or similar to the primary or secondary services that may be ordered under this contract. PAGE: Refers to one printed side of a piece of paper (e.g., 15 pieces of paper printed on both sides equates to 30 total pages). Minimum font size is 10 point. PROJECT MANAGER: The individual who is responsible for managing individual task orders/projects under the IDIQ contract. This individual shall be an employeeof the prime A-E firm. FIELD PROJECT MANAGER: The individual who is responsible for managing BUILDER assessors. This individual shall be an employee of the prime A-E firm.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711AC/N6247315R2416/listing.html)
 
Place of Performance
Address: 1220 Pacific Highway, San Diego, CA
Zip Code: 92132
 
Record
SN03701503-W 20150418/150416234331-5ade2ecf459afacfc2487fb0f0096da5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.