Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 18, 2015 FBO #4893
SOLICITATION NOTICE

36 -- ALTERNATING WATER SOFTENER SYSTEM

Notice Date
4/16/2015
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
333318 — Other Commercial and Service Industry Machinery Manufacturing
 
Contracting Office
ACC - McAlester Contracting Office (ACC-RI-McAlester), Attn: CCRC-IDM
 
ZIP Code
00000
 
Solicitation Number
W44W9M15T0182
 
Response Due
4/29/2015
 
Archive Date
6/15/2015
 
Point of Contact
Kent Hackett, 9184206177
 
E-Mail Address
ACC - McAlester Contracting Office (ACC-RI-McAlester)
(kent.w.hackett.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. 2 EACH, ALTERNATING WATER SOFTENER SYSTEM, DUAL TANK (SOFTENER TANK & BRINE TANK), DUAL CONTROL VALVES, INLET/OUTLET GAUGE SET WITH SAMPLE VALVE, MANIFOLD WITH COMPLETE PIPING WITH BYPASS UNITS TO HAVE THE FOLLOWING: EXCHANGE CAPACITY: 120,000 MIN PIPING SIZE: 1 IN. SERVICE FLOW (GPM): 17 APPROX. PEAK FLOW (GPM): 27 APPROX. BACKWASH (GPM): 7 APPROX. 1 EACH, ALTERNATING WATER SOFTENER SYSTEM, DUAL TANK (SOFTENER TANK & BRINE TANK), DUAL CONTROL VALVES, INLET/OUTLET GAUGE SET WITH SAMPLE VALVE, MANIFOLD WITH COMPLETE PIPING WITH BYPASS UNITS TO HAVE THE FOLLOWING: EXCHANGE CAPACITY: 60,000 MIN PIPING SIZE: 1 IN. SERVICE FLOW (GPM): 10 APPROX. PEAK FLOW (GPM): 16 APPROX. BACKWASH (GPM): 4.5 APPROX. 1 EACH, ALTERNATING WATER SOFTENER SYSTEM, DUAL TANK (SOFTENER TANK & BRINE TANK), DUAL CONTROL VALVES, INLET/OUTLET GAUGE SET WITH SAMPLE VALVE, MANIFOLD WITH COMPLETE PIPING WITH BYPASS UNITS TO HAVE THE FOLLOWING: EXCHANGE CAPACITY: 300,000 MIN PIPING SIZE: 1-1/2 IN. SERVICE FLOW (GPM): 38 APPROX. PEAK FLOW (GPM): 63 APPROX. BACKWASH (GPM): 18 APPROX. 4 EACH, ALTERNATING WATER SOFTENER SYSTEM, DUAL TANK (SOFTENER TANK & BRINE TANK), DUAL CONTROL VALVES, INLET/OUTLET GAUGE SET WITH SAMPLE VALVE, MANIFOLD WITH COMPLETE PIPING WITH BYPASS UNITS TO HAVE THE FOLLOWING: EXCHANGE CAPACITY: 210,000 MIN PIPING SIZE: 1-1/2 IN. SERVICE FLOW (GPM): 32 APPROX. PEAK FLOW (GPM): 48 APPROX. BACKWASH (GPM): 12 APPROX. PLEASE RESPOND VIA EMAIL TO: kent.w.hackett.civ@mail.mil
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/3bb647675fdd8ae74dbe4656db640c87)
 
Place of Performance
Address: ACC - McAlester Contracting Office (ACC-RI-McAlester) Attn: CCRC-IDM, 1 C Tree Road McAlester OK
Zip Code: 74501-9002
 
Record
SN03702292-W 20150418/150416235147-3bb647675fdd8ae74dbe4656db640c87 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.