Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 22, 2015 FBO #4897
AWARD

J -- Big Creek Pump Station Facility, Saylorville Lake, Polk County, Johnston, Iowa, Long Term Repairs to pump #1, pump #2, & pump #3

Notice Date
4/20/2015
 
Notice Type
Award Notice
 
NAICS
811310 — Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
 
Contracting Office
USACE District, Rock Island, P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT, Rock Island, IL 61204-2004
 
ZIP Code
61204-2004
 
Solicitation Number
W912EK-15-X-0003
 
Archive Date
1/28/2016
 
Point of Contact
Brunson Grothus, (309)794-5241
 
E-Mail Address
USACE District, Rock Island
(brunson.e.grothus@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EK-15-P-0088
 
Award Date
4/20/2015
 
Awardee
PENTAIR PUMP GROUP, INC. (016433778) <br> 3601 FAIRBANKS AVE <br> KANSAS CITY, KS 66106
 
Award Amount
$400,731.00
 
Line Number
0001-0006
 
Description
This contract action was accomplished using other than competitive procedures because there is only one responsible source due to a unique capability provided, and no other supplies or services will satisfy agency requirements (FAR 6.302-1). See posted J&A for further information. A firm fixed price contract was awarded for the Contractor to perform all work necessary to transport two vertical axial flow turbine pumps (Pump #1 and #2), located at Big Creek Pump Station Facility, to the Contractor's facility for refurbishment in addition to the one vertical axial flow turbine pumps (Pump #3) currently located at the Contractor's facility. Refurbish and deliver one electric motor and three vertical axial flow turbine pumps (American Marsh, Series AMP480, Model 24AJ-2 Stage, Pumps #1, #2, and #3). The pumps and motor were previously disassembled and inspected under Contract W912EK-15-P-0025. The refurbished Pumps #1, #2 and #3 as well as the vertical induction type hollow shaft electric motor (US Electric Motors, Model 5012P, Type RU, 350HP, Electric Motor #3) shall be prepared for shipment and returned to the Big Creek Pump Station Facility at Saylorville Lake. All unused existing pump parts shall be disposed of as scrap. a. The Contractor shall pick up Pumps #1 & #2 at Big Creek Pump Station Facility, to transport to the Contractor's facility for refurbishment, concurrently with delivering the fully refurbished Pump #3. b. The Contractor personnel shall ensure the pumps are loaded and secured properly. This shall include proper support of the equipment on the truck as to not damage the equipment during transport. The equipment shall additionally be covered during transport to protect from elemental exposure during transport. c. The Contractor shall provide an onsite supervisor during the installation of Pumps #1, #2 and #3 at Big Creek Pump Station Facility at Saylorville Lake. The described work for Pump #1, Pump #2, Pump #3, and Electric Motor #3 shall be completed within 190 calendar days from date of contract award.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA25/W912EK-15-X-0003/listing.html)
 
Record
SN03704465-W 20150422/150420235055-8aebdaf63e3c0a6e61ce73ce8ed83537 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.