MODIFICATION
Z -- Replace Railroad Ties and Surface on the Cuyahoga Valley Railway
- Notice Date
- 4/23/2015
- Notice Type
- Modification/Amendment
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- NPS, MWR - Ohio MABO 1113 West Aurora Road Sagamore Hills OH 44067-1678 US
- ZIP Code
- 00000
- Solicitation Number
- P15PS00755
- Response Due
- 5/26/2015
- Archive Date
- 6/10/2015
- Point of Contact
- BERNARD, KATHERINE
- E-Mail Address
-
Katherine_Bernard@nps.gov
(Katherine_Bernard@nps.gov)
- Small Business Set-Aside
- Total Small Business
- Description
- THIS IS A NOTICE OF THE GOVERNMENTS INTENT FOR REQUEST FOR PROPOSALS. Request for Proposal (RFP) P15PS00755 to Replace Railroad Ties on the Cuyahoga Valley Railway at Cuyahoga Valley National Park, Brecksville, Ohio 44141 The work of this contract consists of the general construction of replacement of approximately 2000 Single line railroad crossties spread out within various mile posts. The project will be advertised as Set Aside for Small Businesses Type of Contract: Firm Fixed Price CONTRACTING POC: Katherine Bernard (330) 468-2500 email: Katherine_Bernard@nps.gov SITE VISIT: 29 April 2015 at 10:00 am ET at Cuyahoga Valley National Park Specific Location: Fitzwater Train Yard 7600 Canal Rd. Valley View, Ohio 44125 In Accordance with FAR 36.204, the magnitude of this project is between $250,000 and $350,000. THIS IS NOT THE GOVERNMENT ESTIMATE. NAICS: 237990 (Other Heavy and Civil Engineering Construction) Construction Duration: Estimated at 180 days REQUIRED BONDS: This project is subject to the Davis-Bacon Act. Bonds will be required as follows: Bid Guarantee - 20% of the contract price. Payment and Performance bonds - (forms SF25 and SF25a) 100% of the contract price. Required Submission Documents: Volume I: Tab 1 Cover letter Tab 2 Standard Form 1442, "Solicitation, Offer and Award" and completed Pricing Schedule (Section B) Tab 3 Representations and Certifications (Section K) OR the ORCA Print out (www.bpn.gov) Tab 4 Bid Guarantee Letter (e.g., Standard Form 24, "Bid Bond") and a letter from bonding agent as to your maximum bonding capacity Volume II: Tab 1 Construction Past Performance Tab 2 Qualifications of Construction Personnel Tab 3 Project Management Plan Submit 1 CD with 1 soft binder with both Volume I and II documentation in it ALL QUESTIONS WILL BE PRESENTED IN WRITING (EMAIL) TO THE CONTRACT SPECIALIST ON THIS PROJECT, NOT THE PARK. READ ALL AREAS IN THE TABLE OF CONTENT
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/P15PS00755/listing.html)
- Record
- SN03709684-W 20150425/150423235758-4ce5e35dce29495f3575a58f9e0f50be (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |