Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 01, 2015 FBO #4906
SOURCES SOUGHT

Z -- Modular Wall Installation

Notice Date
4/29/2015
 
Notice Type
Sources Sought
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
MICC - West Point, Directorate of Contracting, ATTN: SFCA-NR-WP, 681 Hardee Place, West Point, NY 10996-1514
 
ZIP Code
10996-1514
 
Solicitation Number
15TMODULARWALL
 
Response Due
5/1/2015
 
Archive Date
6/28/2015
 
Point of Contact
Robert Pizzano, 845-938-4761
 
E-Mail Address
MICC - West Point
(robert.pizzano@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
THIS IS A NOT A SOLICITATION BUT A SOURCES SOUGHT. The Keller Army Hospital @ West Point, NY has a requirement for a Modular Wall Installation to accomadate the installation of 2 new sterilizers. The following is the requirement. Central Material Supply - Make Ready Scope of Work Infection Control: 1.Provide and install temporary dust partitions (standard plastic sheeting with zipper door access) on the load side and unload side of the work area. 2.Provide and install floor protection in the work area where necessary. 3.Provide and install sticky mats at the entry to the work area. 4.Provide a HEPA filter exhaust system during construction. Renovations: Sterilizers and Steam Generators 1.Remove Stainless Steel Modular Wall and remove from site. 2.Remove Sterilizers and Steam Generator from the facility. Palletize for exchange and turn in. 2.Saw cut concrete for installation of new 4 quote mark drain under sterilizer 3.Saw cut floor at drain near steam generator and install new floor sink 4.Clean floor in sterilizer area and cover with epoxy material 5.Run new copper drain piping for Sterilizer, IAW Steris specifications to match new equipment 6.Install Stainless Steel Modular wall on both clean and dirty sides; a total of 41 linear feet. This must include dual access points, matched cut-outs for the two sterilizers and the existing chemical sterilizer. 7.Remove temporary dust partitions and dispose of remaining debris from the site This requirement is in support of Steris Equipment only. Renovations required for installation of Steris Double Door Medium Sterilizers and 150KW Steam Generator. The contractor shall supply all necessary material, equipment and labor to meet this requirement. Please submit a capability statement with your companies qualifications and certification as an authorized Steris service provider. This notice closes on Friday May 1, 2015 @ 11am. Please submit your information to Bob Pizzano @ robert.pizzano@usma.edu
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/04c5f1a5ac799aa254aab621a24a1d89)
 
Place of Performance
Address: MICC - West Point Directorate of Contracting, ATTN: SFCA-NR-WP, 681 Hardee Place West Point NY
Zip Code: 10996-1514
 
Record
SN03714804-W 20150501/150429235559-04c5f1a5ac799aa254aab621a24a1d89 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.