SOLICITATION NOTICE
Y -- Utilities Upgrade Project - Master Substation Replacement - RFP FESS-6784-JBH
- Notice Date
- 5/6/2015
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- Department of Energy, Fermi National Accelerator Laboratory, Fermilab, P.O. BOX 500, MAIL STOP 210 (WH4W), BATAVIA, Illinois, 60510
- ZIP Code
- 60510
- Solicitation Number
- FESS-6784-JBH
- Archive Date
- 6/23/2015
- Point of Contact
- James B. Hohbein, Phone: 6308406782, Thomas R. Powers, Phone: 630-840-4255
- E-Mail Address
-
hohbein@fnal.gov, trpowers@fnal.gov
(hohbein@fnal.gov, trpowers@fnal.gov)
- Small Business Set-Aside
- N/A
- Description
- RFP Cover Page The lump sum proposal will consist of all labor, equipment, transportation, overhead, bonding costs, safety oversight, quality control oversight and supervision as required to construct the site work associated with the Master Substation including but not limited to: 1. Mobilization; 2. Procure, fabricate and assemble all materials and equipment; 3. Demolish the existing building, capacitor tree structure, control cables, ductbanks, power feeder cables, telephone lines, communications lines, fiber optic lines, water lines, mechanical systems, foundations, bus duct systems, motorized switch operators and any other site features to make the site ready for new construction. 4. Construct the new concrete foundations for equipment and the prefabricated building; 5. Make site ready for building installation; 6. Strip and remove existing substation gravel surface, stock pile at the designated Fermilab site; 7. Furnish and install new substation gravel surface; 8. Perform all site work grading and construction of utilities and drainage features; 9. Furnish and install new and Fermilab furnished equipment in the control building as designated in the subcontract documents; 10. Furnish and install new ductbank systems for control cable systems and power feeders; 11. Furnish and install new control and power cable systems; 12. Furnish and install new grounding and ground grid systems; 13. Furnish and install all lighting, cable racking and tray systems, mechanical and electrical systems in the new building vault (basement); 14. Relocate existing station power transformer and install new building electrical service; 15. Furnish and install new station diesel power generator; 16. Coordinate with Fermilab for the site preparation including but not limited to laydown areas, access requirements and building foundations to receive and install the control building at the installation site; 17. Provide technical oversight and coordination of installation; 18. Provide on-site acceptance testing, commissioning, including documentation of installed building systems and equipment; 19. Demobilize and clean site in disturbed areas. Please e-mail James Hohbein ( hohbein@fnal.gov ) to obtain a complete copy of this RFP. Interested suppliers will be added to the Fermilab Ebid System.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/FERMI/FERMI/FESS-6784-JBH/listing.html)
- Place of Performance
- Address: The project is at the Fermilab Master Substation located north of Wilson Hall at the intersection of Road A and Road B on the Fermi National Accelerator Laboratory (Fermilab) site, approximately one (1) mile east of the City of Batavia, in Kane County, Illinois., Batavia, Illinois, 60510, United States
- Zip Code: 60510
- Zip Code: 60510
- Record
- SN03721556-W 20150508/150506235101-f74cbf7d7e86cc473553f408e2b9b859 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |