Z -- Bonneville Power Administration (BPA) 905 Bldg Outside Air Intake Relocation & Elevator Design Build Modernization - Exhibits

Notice Date
5/8/2015
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Design & Construction Contracting (10PCC), 400 15th Street SW, Auburn, Washington, 98001-6599, United States
 
ZIP Code
98001-6599
 
Solicitation Number
GS-10P-15-LT-R-9000
 
Archive Date
7/7/2015
 
Point of Contact
Richard Risso, Phone: 2539317309
 
E-Mail Address
richard.risso@gsa.gov
(richard.risso@gsa.gov)
 
Small Business Set-Aside
N/A
 
Description
905 Division 1 OR0058PE - 10 OR0058PE - 9 OR0058PE - 8 OR0058PE - 7 OR0058PE - 6 OR0058PE - 5 OR0058PE - 4 OR0058PE - 3 OR0058PE - 2 OR0058PE - 1 AutoCads GSA Region 10 - Wet Sprinkler System Guidelines GSA Region 10 - Fire Alarm Design, Installation and Testing Policy GSA Region 10 - Dry Sprinkler System Guidelines Exhibit 10 Pre-Proposal Conference - 905 Elevators Air Intakes Exhibit 9 905 BPA Owners Project Requirements 19 MAR 2015 Exhibit 8F OR0058-AggregateThematic-20150305 Exhibit 8E VFA Facility Assessment Report 2004 Exhibit 8D BPA Glumac Study 2002 Exhibit 8C Lerch Bates Elevator Modernization Survey 2010 Exhibit 8B Project Development Study 905 BPA LB Elevator Cost Opinion 2.26.13 Exhibit 8A Project Development Study 905 BPA Air Intakes 2.23.13 Exhibit 8 Project Development Study 905 BPA LB Elevator Report 2.26.13 Exhibit 7A Reps and Certs C301 April 2015 Exhibit 7 DBA WD OR150029 (Mod 3) 04.15.15 Exhibit 6E How Contractors Obtain a GSA Access Card Exhibit 6D Optional Form OF306 Addendum Exhibit 6C Optional Form OF306 Exhibit 6B Short Term Clearance Instructions Exhibit 6A Security Clearance Desk Guide-External Contractor Exhibit 6 Contractor Information Worksheet Exhibit 5B BPA 905 CxA Plan 16 MAR 2015 Exhibit 5A 905 BPA Cx SOW 5.6.15 Exhibit 5 905 BPA DB SOW 5.6.15 Exhibit 4 Performance Evaluation Form - Commercial Client Exhibit 3 Sample Key Personnel Resume Format - FINAL Exhibit 2 Project Experience Form - FINAL Exhibit 1 Price & Services Schedule Exhibit 0 Read Me First - SBU Document Project Summary The General Services Administration (GSA) proposes a repair and alteration project to upgrade multiple building systems at the Bonneville Power Administration (BPA) Federal Building located at 905 NE 11th Avenue in Portland, OR. Alterations include upgrading the obsolete elevator system and the relocation of air intakes from the street level to a higher elevation to reduce the risk of contamination particles entering the ventilation system. Building The BPA Building, constructed in 1987, houses the headquarters of the Bonneville Power Administration (BPA), a component of the Department of Energy that manages the electrical generating resources of the Columbia River watershed. The seven story steel frame structure, constructed in 1987 provides 701,184 gross square feet. It includes three levels of underground parking with 428 spaces. The BPA Federal Building is connected to and shares infrastructure with the neighboring 911 Federal Building and together they are known as the Eastside Federal Complex. Tenant Agency: Department of Energy Proposed Project The proposed project will upgrade the elevator system and eight existing traction passenger elevators as well as the existing freight elevator by providing a code compliant system that will improve safety, reliability, and serviceability. The eight existing traction passenger elevators will be converted to a destination dispatch control system with regenerative drives. Ventilation system modifications include relocation of the ground/street level air intake to a higher elevation, changes to ventilation ducts and fans and rerouting the current exhaust system. Justification The elevator system is more than 25 years old and near the end of useful life. The elevator system and traction passenger elevators breakdowns are increasing and parts are becoming more difficult and costly to procure. The existing air intakes will be relocated approximately 25 feet above grade so the ventilation system will be less vulnerable to airborne contaminates. Summary of Energy Compliance This project will be designed to conform to requirements of the Facilities Standards for the Public Buildings Service and will implement strategies to meet the Guiding Principles for High Performance and Sustainable Buildings. GSA encourages design opportunities to increase energy and water efficiency above the minimum performance criteria. Project Description & Approach The General Services Administration (GSA) intends to award a firm fixed-price, Design-Build contract for the Bonneville Power Administration (BPA) 905 Bldg Outside Air Intake Relocation and Elevator Modernization Design Build Modernization pursuant to Federal Acquisition Regulation (FAR) Best Value Design-Build Selection Procedures (FAR Subpart 15.3). GSA envisions a highly collaborative design build delivery approach for this project where the DB contractor works closely with all stakeholders to deliver a project that meets the expectations and needs of both the team members and GSA's requirements to deliver an economical and operationally efficient high performing green building. As required by law, the facility must meet federal energy goals. The project is also to include conformance to the P-100 (Facility Standards for Public Buildings) and all other applicable building codes and standards. The DB team will be selected through a best value / tradeoff selection process. During the development period from initial concept to final design the DB team will work in close consultation with GSA, the stakeholders and the CMa to ensure that all of the goals are addressed and that best value practices are utilized. GSA will be contracting separately for Construction Management Assistant (CMa) services. The CMa will be involved in the design process to provide construction expertise, estimating and cost information, and functionality and constructability reviews. There will be an informal partnering process throughout the design and construction phases to promote successful project development and execution including an enhanced project kick-off meeting. The CMa will also perform Commissioning Agent (CxA) services. All installed systems will be fully commissioned and functionally tested to ensure compliance with contract documents prior to being accepted by GSA. Unique Situations/Risks The need for continuous operation during construction, present unique challenges for the design/build teams on the project. Facility will remain fully occupied and operations during the entire project. No adverse impact on tenant mission will be acceptable. Occupied Facility Construction This project scope at the Bonneville Power Administration (BPA) 905 Bldg Outside Air Intake Relocation and Elevator Design Build Modernization must occur within an occupied, fully functional facility. These functions include typical office work, but also include services for the general public. This presents several challenges that will have to be addressed by the designer and/or design/build team. • All work in public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis. • Work must be performed in such a way that space conditioning is maintained throughout the process. Any work in winter will need to avoid disruption of space heating; any work in summer will need to avoid disruption of space cooling. Temporary / contingency HVAC/R systems may be required. This will be the responsibility of the Design Builder. • Any work in the central plant must be completed without disruption of the heat pump and hot water loops. Space layout design and properly staged implementation will be critical elements to a successful project. This procurement will be advertised unrestricted under North American Industrial Classification System (NAICS) code 236220 - Addition, Alteration & Renovation General Contractors. Note: The RFP for this project is due to be relased on or about 20 May 2015.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/10PDC/GS-10P-15-LT-R-9000/listing.html)
 
Place of Performance
Address: Bonneville Power Administration Bldg, 905 NE 11th Ave, Portland, Oregon, 97232, United States
Zip Code: 97232
 
Record
SN03725503-W 20150510/150508235159-934ceb4c182c80007a3ca0c0f30c4b79 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.