FBO DAILY - FEDBIZOPPS ISSUE OF MAY 17, 2015 FBO #4922
DOCUMENT

Y -- 695-14-145, Upgrade MRI Suite, Building 111 - Attachment

Notice Date
5/15/2015
 
Notice Type
Attachment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Great Lakes Acquisition Center (GLAC);Department of Veterans Affairs;115 S 84th Street, Suite 101;Milwaukee WI 53214-1476
 
ZIP Code
53214-1476
 
Solicitation Number
VA69D15B0421
 
Response Due
4/20/2015
 
Archive Date
7/19/2015
 
Point of Contact
Leon A. Jutrzonka
 
E-Mail Address
<br
 
Small Business Set-Aside
Service-Disabled Veteran-Owned Small Business
 
Award Number
VA69D-15-C-0190
 
Award Date
5/15/2015
 
Awardee
C3T, INC.;6045 N 55TH ST;MILWAUKEE;WI;53218
 
Award Amount
$660,300.00
 
Description
Project: 111 Upgrade MRI Suite Project No: 695-14-145 Duration: 365 Days General Description: Provide all labor, materials, tools, equipment, and supervision necessary for the renovation and site preparation of the MRI suite to install a new 3T MRI in Bldg 111, 2nd Floor, B-Wing, Rooms 2486, 2488, 2488A and 2490 and adjoining hallways and corridors to: 1.Remove of the existing MRI and installation of the new MRI will be through the exterior wall of Bldg. 111. 2.Upgrade Power Requirements for Magnet, Scanning Suite, Support Equipment, and Control Room Equipment shall be on Critical Power. This includes critical power being fed to all ancillary cooling systems, heat exchangers, gradient cabinets, computers, etc. associated with the MRI system and required for MRI scanning operations during Normal Power outages. 3.Upgrade Cooling Requirements for Suite cooling for the Magnet, Scanning Suite, and support Equipment room to meet manufacturer's specifications. Design back up cooling for the Magnet, Scanning Suite, and Support Equipment, most likely in the form of city water bypass, that shall transfer automatically when the primary cooling source is interrupted or drops below required cooling performance thresholds. Include commissioning of all new HVAC equipment. 4.Upgrade Shielding See plans and specifications for further information. All construction work will be accomplished within 365 days after receipt of the notice to proceed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VAGLHS/VAGLHCS/VA69D15B0421/listing.html)
 
Document(s)
Attachment
 
File Name: VA69D-15-C-0190 VA69D-15-C-0190_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2049577&FileName=VA69D-15-C-0190-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2049577&FileName=VA69D-15-C-0190-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN03733051-W 20150517/150515235110-11c0f77bf48580a196e704917f67d930 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.