MODIFICATION
Z -- Nez Perce-Clearwater NFs - East Fork Imnamatnoon Creek Culvert Replacement - Amendment 1
- Notice Date
- 5/19/2015
- Notice Type
- Modification/Amendment
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
- ZIP Code
- 83815-8363
- Solicitation Number
- AG-02RC-S-15-0047
- Response Due
- 5/21/2015 4:00:00 PM
- Point of Contact
- Karen Ruklic, Phone: 208-983-5144
- E-Mail Address
-
kruklic@fs.fed.us
(kruklic@fs.fed.us)
- Small Business Set-Aside
- HUBZone
- Description
- Solicitation Amendment 1 This project is being done in collaboration with the Nez Perce Tribe Watershed program. The work requires removal of an existing 57"x 38" corrugated steel culvert on a tributary of the EF Imnamatnoon Creek and replacement with a structural plate arch culvert on precast concrete footings. The replacement structure is 90 linear feet in length and the excavation is considered a deep fill. The work includes, but is not limited to, clearing and grubbing, erosion control measures, structure excavation, roadway embankment, removing and disposing an existing culvert, compaction, riprap, installation of geocell reinforcement along the length of the foundations, roadway surfacing, furnishing and installing a 4'5" rise by 10' span Structural Plate Arch Corrugated Steel Pipe, and all other incidental items necessary to complete the project in accordance with the plans and specifications. This project is located in the Nez Perce-Clearwater National Forest on National Forest System Road No. 568 at Mile Post 4.50 in the Powell Ranger District in Section 7, T. 37 N., R. 14 E., Idaho County, Idaho. To reach the site, travel approximately 88.1 miles east on Highway 12 from Kooskia, ID. The Government's estimate is between $250,000 and $500,000. No formal pre-bid tour is scheduled. The site is currently accessible on foot or via a tracked ATV/UTV due to the presence of approximately.5-2 feet of snow. Interested offerors are encouraged to view the site prior to offer submittal due to the depth of excavation required and the resultant logistical challenges. Solicitation was issued April 22, 2015. Construction work on the project shall commence no earlier than July 1, 2015. All in-stream work must take place between July 15th and August 30th and all work shall be completed by October 15, 2015. Original bid bonds are required. The acquisition has been set-aside for HUBzone certified small business concerns. The presolicitation notice was modified on 3/25/15 to correct the number of the road on which this project site is located. The correct National Forest System Road No. is 568; the original presolicitation notice gave a National Forest System Road No.5689 by mistake. Amended the solicitation on 5/19/15 to allow for stockpiling material on the 568B road. Response deadline was extended to Tuesday, May 26th; 4:00 PM local time.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-15-0047/listing.html)
- Place of Performance
- Address: Powell Ranger Station (located 13 miles west of the ID-MT border off US Hwy 12), 192 Powell Road (mailing address), Lolo, Montana, 59847, United States
- Zip Code: 59847
- Zip Code: 59847
- Record
- SN03735679-W 20150521/150519235001-0b93dcec6b24af3e90497c7a53ecda99 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |