MODIFICATION
Y -- Pre-Bid Meeting
- Notice Date
- 5/21/2015
- Notice Type
- Modification/Amendment
- NAICS
- 237130
— Power and Communication Line and Related Structures Construction
- Contracting Office
- SWPA (Tulsa)U.S. DEPT OF ENERGYSOUTHWESTERN POWER ADMINISTRATIONONE WEST THIRD STREETTulsaOK74103-3502US
- ZIP Code
- 00000
- Solicitation Number
- DE-SOL-0008368
- Archive Date
- 7/9/2015
- Point of Contact
- Sean L. Long
- Small Business Set-Aside
- N/A
- Description
- Pre-Bid meeting Questions 1. Can we use the existing static wire to pull in the new OPGW. Answer: Yes if the old static wire will support the pull. Question 2. I did not find the liquidated damages that would be accessed if the project does not meet the completion requirements. What are the liquidated damages for this project? Answer: There are no per say liquidated damages. However, if you do not complete the project in time and need a time extension, depending on the circumstances, I will ask for consideration for that extension in terms of what my inspector costs or if any revenue is lost in terms of not being able to generate and supply power, I may seek those loses as well. Question 3. Is the pre-bid mandatory? Anwser: NO.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/DE-SOL-0008368/listing.html)
- Record
- SN03739310-W 20150523/150521235518-9a4a46d8fc06e83b4e5bce85c0cec4cc (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)